TY - JOUR T1 - Uncovering the Root Causes of Failures in Construction Projects with 5 Whys AU - Boz, Reyhan AU - Eskigulek, Guney AU - Demirkesen, Sevilay AU - Çağlayan, S. Semih PY - 2026 DA - April Y2 - 2025 DO - 10.38088/jise.1769981 JF - Journal of Innovative Science and Engineering JO - JISE PB - Bursa Technical University WT - DergiPark SN - 2602-4217 SP - 65 EP - 85 VL - 10 IS - 1 LA - en AB - Construction projects are complex and dynamic in nature and require meticulous planning and execution to meet time, cost, and quality targets. Despite advances in project management practices, many projects still experience challenges, resulting in delays, cost overruns, and quality issues. A systematic approach is essential to effectively address these issues. In this study, root cause analysis was used to investigate the underlying causes of these challenges in construction projects. In this direction, 5 Whys technique was utilized to investigate 67 issues identified in 5 different construction projects in and around Sakarya, Türkiye. The findings reveal that although time and cost overruns are common symptoms, their root causes are often linked to weaknesses in various project management knowledge areas. In particular, this study highlights the important role of procurement management, communication management, and risk management in contributing to project problems. By uncovering these key underlying factors, this research provides a structured framework for understanding the systemic challenges faced in the construction industry and suggests practical solutions to mitigate future problems. The study further demonstrates the effectiveness of root cause analysis in identifying root causes and guiding professionals towards sustainable project success, ultimately promoting a more efficient and effective construction industry. The study is expected to provide a systematic analysis of root causes and tackle the underlying causes rather than focusing on the common causes. The examples provided in this study reflect the causes from real construction projects, which can further help project managers to revisit their project management strategies. KW - 5 Whys technique KW - construction industry KW - construction projects KW - project management KW - root cause analysis CR - Aderibigbe, A. I. (2017). Root cause analysis of a jet fuel tanker accident. International Journal of Applied Engineering Research, 12(24), 14974-14983. CR - Al-Zwainy, F. M., & Mezher, R. A. (2018). Diagnose the causes of cost deviation in highway construction projects by using root cause analysis techniques. Arabian Journal for Science and Engineering, 43(4), 2001-2012. CR - Al-Zwainy, F. M., Mohammed, I. A., & Varouqa, I. F. (2018). Diagnosing the causes of failure in the construction sector using root cause analysis technique. Journal of Engineering, 2018(1), 1804053. CR - Andersen, B., & Fagerhaug, T. (2006). Root Cause Analysis. Quality Press. CR - Arditi, D., Akan, G. T., & Gurdamar, S. (1985). Reasons for delays in public projects in Turkey. Construction management and economics, 3(2), 171-181. CR - Atkinson, R. (1999). Project management: cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria. International journal of project management. 17(6), 337-342. CR - Ballesteros-Perez, P., Sanz-Ablanedo, E., Soetanto, R., González-Cruz, M. C., Larsen, G. D., & Cerezo-Narváez, A. (2020). Duration and cost variability of construction activities: An empirical study. Journal of Construction Engineering and Management, 146(1), 04019093. CR - Cardona-Meza, L. S., & Olivar-Tost, G. (2017). Modeling and simulation of project management through the PMBOK® standard using complex networks. Complexity, 2017(1), 4791635. CR - Dogan, E., Yurdusev, M. A., Yildizel, S. A., & Calis, G. (2021). Investigation of scaffolding accident in a construction site: A case study analysis. Engineering Failure Analysis, 120, 105108. CR - Famiyeh, S., Amoatey, C. T., Adaku, E., & Agbenohevi, C. S. (2017). Major causes of construction time and cost overruns: A case of selected educational sector projects in Ghana. Journal of Engineering, Design and Technology, 15(2), 181-198. CR - Gangidi, P. (2019). A systematic approach to root cause analysis using 3× 5 why’s technique. International Journal of Lean Six Sigma, 10(1), 295-310. CR - Gündüz M, Nielsen Y & Özdemir M. Quantification of delay factors using the relative importance index method for construction projects in Turkey. Journal of Management in Engineering, 29(2), 133-139, 2013. CR - Hsu, P. Y., Aurisicchio, M., & Angeloudis, P. (2017). Investigating schedule deviation in construction projects through root cause analysis. Procedia computer science, 121, 732-739. CR - Jin, X., Wang, K., & Qian, H. (2024). Root cause analysis of an abnormal groove-clogging failure on sink rolls in continuous hot-dip galvanizing line. Engineering Failure Analysis, 156, 107779. CR - Kamran, M., Zhang, C., Kumar, D., Demirkesen, S., & Li, H. (2024). Enhancing Safety in the Construction of Small Modular Reactors (SMRs) and Microreactors (MRs) through Improving Guidelines and Involving Digital Technology Tools. Journal of Engineering, Project, and Production Management, 14(2), 0015. CR - Karkhanis, A. J., & Thompson, J. M. (2020). Improving the effectiveness of root cause analysis in hospitals. Hospital Topics, 99(1), 1-14. CR - Khodadadi-Mousiri, A., Yaghoot-Nezhada, A., Sadeghi-Yarandi, M., & Soltanzadeh, A. (2023). Consequence modeling and root cause analysis (RCA) of the real explosion of a methane pressure vessel in a gas refinery. Heliyon, 9(4). CR - Kog, Y. C., Chua, D. K. H., Loh, P. K., & Jaselskis, E. J. (1999). Key determinants for construction schedule performance. International Journal of Project Management, 17(6), 351-359. CR - Kum, S., & Sahin, B. (2015). A root cause analysis for Arctic Marine accidents from 1993 to 2011. Safety Science, 74, 206-220. CR - Le-Hoai, L., Lee, Y. D., & Lee, J. Y. (2008). Delay and cost overruns in Vietnam large construction projects: A comparison with other selected countries. KSCE Journal of Civil Engineering, 12, 367-377. CR - Mahto, D., & Kumar, A. (2008). Application of root cause analysis in improvement of product quality and productivity. Journal of Industrial Engineering and Management (JIEM), 1(2), 16-53. CR - Majid, I. A. (2006). Causes and effect of delays in Aceh construction industry [Master’s thesis, Univ. of Technology Malaysia]. Johor Bahru, Malaysia. CR - Marcelino, E., & Domingues, L. (2022). An analysis of how well serious games cover the PMBOK. Procedia Computer Science, 196, 1013-1020. CR - Mesquida, A. L., & Mas, A. (2014). A project management improvement program according to ISO/IEC 29110 and PMBOK®. Journal of Software: Evolution and Process, 26(9), 846-854. CR - Molan, G., & Molan, M. (2021). Theoretical model for accident prevention based on root cause analysis with graph theory. Safety and Health at Work, 12(1), 42-50. CR - Ong, P. L., Choo, Y. H., & Muda, A. K. (2015). A manufacturing failure root cause analysis in imbalance data set using pca weighted association rule mining. Jurnal Teknologi (Sciences & Engineering), 77(18). CR - Ozbakır, O. (2020). Reducing rockfall hazards in Sabiha Gökçen–Tavsantepe Metro Project construction by using root cause analysis methodology. International Journal of Innovative Engineering Applications, 8(1), 8–16. CR - Pinto, J. K. (1998). The Project Management Institute Project Management Handbook. John Wiley & Sons. CR - Polat, G., Damci, A., Turkoglu, H., & Gurgun, A. P. (2017). Identification of root causes of construction and demolition (C&D) waste: the case of Turkey. Procedia engineering, 196, 948-955. CR - Project Management Institute (PMI). (2016). Construction Extension to The Pmbok® Guide. CR - Project Management Institute (PMI). (2021). A Guide to the Project Management Body of Knowledge (PMBOK® Guide) – Sixth Edition. CR - Proverbs, D. G., Holt, G. D., & Cheok, H. Y. (2000). Construction industry problems: the views of UK construction directors. In 16th annual ARCOM conference (Vol. 1, No. 4). CR - Putri, R. A., & Latief, Y. (2022). Risk Identification in the Controlling Process of Trans Sumatera Toll Road Project Based on PMBOK 6th Edition. CR - Raja, K. V., Siddharth, R., Yuvaraj, S., & Kumar, K. R. (2024). An Artificial Intelligence based automated case-based reasoning (CBR) system for severity investigation and root-cause analysis of road accidents–Comparative analysis with the predictions of ChatGPT. Journal of Engineering Research, 12(4), 895-903. CR - Ramkumar, A., & Gopalakrishnan, S. (2014). Root cause analysis of issues in construction industry. International Journal of Innovative Research in Science, Engineering and Technology, 3, 1-10. CR - Rooney, J. J., & Heuvel, L. N. V. (2004). Root cause analysis for beginners. Quality Progress, 37(7), 45-56. CR - Rosenberger, P., & Tick, J. (2018). Suitability of PMBOK 6 th edition for agile-developed IT Projects. In 2018 IEEE 18th International Symposium on Computational Intelligence and Informatics (CINTI) (pp. 000241-000246). IEEE. CR - Rosenfeld, Y. (2014). Root-cause analysis of construction-cost overruns. Journal of Construction Engineering and Management, 140(1), 04013039. CR - Shahhossein, V., Afshar, M. R., & Amiri, O. (2018). The root causes of construction project failure. Scientia Iranica, 25(1), 93-108. CR - Simushi, S., & Wium, J. (2020). Time and cost overruns on large projects: understanding the root cause. Journal of Construction in Developing Countries, 25(1), 129-146. CR - Silvius, A. J., & Schipper, R. P. (2014). Sustainability in project management: A literature review and impact analysis. Social business, 4(1), 63-96. CR - Srivastava, V., Singh, D., Rao, A. G., & Deshmukh, V. P. (2024). Root cause analysis of flywheel gear failure in a marine diesel engine. Engineering Failure Analysis, 156, 107729. CR - Takagi, N., & Varajão, J. (2020). Success management and the project management body of knowledge (PMBOK): An integrated perspective. International Research Workshop on IT Project Management 2020. 6. CR - Teixeira, T. C. A., & Cassiani, S. H. D. B. (2014). Root cause analysis of falling accidents and medication errors in hospital. Acta Paulista de Enfermagem, 27, 100-107. CR - Williams, P. M. (2001). Techniques for root cause analysis. In Baylor University Medical Center Proceedings (Vol. 14, No. 2, pp. 154-157). Taylor & Francis. CR - Yang, J. B., & Wei, P. R. (2010). Causes of delay in the planning and design phases for construction projects. Journal of Architectural Engineering, 16(2), 80-83. CR - Yeganeh, A. A., Azizi, M., & Falsafi, R. (2019). Root causes of design-construction interface problems in iranian design-build projects. Journal of Construction Engineering and Management, 145(12), 05019014. CR - Yılmaz, F. (2015). Monitoring and analysis of construction site accidents by using accidents analysis management system in Turkey. Journal of sustainable development, 8(2), 57. CR - Zhang, X. L., Liang, F. J., Xu, S. R., Xie, Y. F., & Shu, C. M. (2023). Building urban gas process safety management (UG-PSM) system: Based on root cause analysis with 160 urban gas accidents in China. Journal of Loss Prevention in the Process Industries, 84, 105101. UR - https://doi.org/10.38088/jise.1769981 L1 - https://dergipark.org.tr/en/download/article-file/5176388 ER -