TY - JOUR TT - DETERMINATION OF THE RELATIONSHIP BETWEEN ESTIMATED COSTS AND ACTUAL COSTS OF PUBLIC BUILDING CONSTRUCTION PROJECTS AU - Çelik, M.haluk AU - Kanıt, Recep AU - Baykan, Umut Naci PY - 2003 DA - December JF - Politeknik Dergisi PB - Gazi University WT - DergiPark SN - 2147-9429 SP - 677 EP - 692 VL - 6 IS - 4 KW - Keşif bedeli KW - Yapı Maliyeti KW - Kesin hesap N2 - In this study, the relationship between the estimated costs and actual costs of public building construction projects has been investigated by using the related data which belongs to various public building construction projects undertaken between the years 1990 and 2002. Within the direction of this aim, amount of work, total cost and changes in unit prices have been determined UR - https://dergipark.org.tr/en/pub/politeknik/issue//366944 L1 - https://dergipark.org.tr/en/download/article-file/384372 ER -