@article{article_950133, title={A Fuzzy Approach for Generalized Project Selection and Scheduling Problem with Resource Management}, journal={Aksaray University Journal of Science and Engineering}, volume={6}, pages={1–16}, year={2022}, DOI={10.29002/asujse.950133}, url={https://izlik.org/JA93FH64BD}, author={Bektur, Gülçin}, keywords={Project selection and scheduling, Modified two-phase fuzzy goal programming, Fuzzy multi-objective mathematical model, Resource management, Dynamic project arrivals}, abstract={In this study, the problem of project selection and scheduling with resource management is considered project setup times, dynamic project arrivals, priorities and relationship between projects. A fuzzy multi-objective mixed integer linear programming (MILP) model is proposed for the solution of the problem. The classic two-phase fuzzy goal programming (FGP) approach is modified to solve the proposed multi-objective MILP model. The addressed problem is defined over the project selection and scheduling problem of a construction company. The effect of resource management on the project selection and scheduling problem is demonstrated over the generated test problems. Modified two-phase FGP and classic two-phase FGP approaches are compared over test problems. With the use of the modified two-phase FGP approach, additional alternative solutions are found for the problem.}, number={1}