MANAGING IRAQI CONSTRUCTION PROJECT USING AGILE APPROACH

Year 2025, Volume: 9 Issue: 1, 101 - 110, 30.06.2025

Abstract

Continuous progress of construction projects using the agile approch refere to the project that can be managed at each stage. Agile approch is predicated on the idea that a project can be applied during project lifetime with minimal disruption. The present paper apply the effective project factors depend on a project time schedule as a key concept. In order to achieve this target, the RII method is used to specify the cause of the project schedule delay. then a survey with the experts evaluates the time effect of the higher score factor which causes the project delay. then specify the solution. the underestimation of project duration due to lack of experience and unforeseen conditions, slow in taking critical decisions, the financial ability of the contractor to continue working with owner's delay in payment, lack of resources and delays in delivering materials to the site was the effective factors on the project schedule. the results of RII specify the delays in delivering materials to the site as the main cause of scheduling delays in ıraqi projects. for that, the project schedule was modified with the time and quantities of needed material for each task as a solution to the scheduling delay problems

References

  • Ahbab, Changiz. 2019. “An Investigation on Time and Cost Overrun in Construction Projects An Investigation on Time and Cost Overrun in Construction Projects.” East Mediterranean University (April):1–170.
  • Ankit Vishwakarma, Ashish Thakur, Sushant Singh, and Ashwini Salunkhe. 2016. “Risk Assessment in Construction of Highway Project.” International Journal of Engineering Research And V5(02):637–41. doi: 10.17577/ijertv5is020515.
  • Asal, Emad Mohamed. 2014. “Factors Affecting Building Construction Projects Cost Estimating.” Arab Academy for Science, Technology and Maritime Transport (AASTMT) 95.
  • Bansal, V. K., and Mahesh Pal. 2011. “Construction Projects Scheduling Using GIS Tools.” International Journal of Construction Management 11(1):1–18.
  • Bari, Nor Azmi Ahmad, Rosnah Yusuff, Napsiah Ismail, Aini Jaapar, and Rizan Ahmad. 2012. “Factors Influencing the Construction Cost of Industrialised Building System (IBS) Projects.” Procedia - Social and Behavioral Sciences 35(December 2011):689–96. doi: 10.1016/j.sbspro.2012.02.138.
  • Bukłaha, Emil. 2017. “Project Controlling in the Adaptive Perspective of Project Management.” 1(1):8–17. Chau, Kwok Wing, M. Anson, and J. P. Zhang. 2003. “Implementation of Visualization as Planning and Scheduling Tool in Construction.” Building and Environment 38(5):713–19.
  • Khalilzadeh, Mohammad, Hedieh Shakeri, Hadis Gholami, and Leila Amini. 2017. “A Heuristic Algorithm for Project Scheduling with Fuzzy Parameters.” Procedia Computer Science 121:63–71. doi: 10.1016/j.procs.2017.11.010. Kishan, Patel & Bhatt, Dr. Rajiv & Bhavsar, Prof. J. J. 2014. “A Study of Risk Factors Affecting Building Construction Projects.” International Journal of Engineering Research & Technology 3(12):831–35.
  • Klanšek, Uroš, and Mirko Pšunder. 2010. “Troškovna Optimizacija Terminskih Planova Za Vodenje Projekata.” Ekonomska Istrazivanja 23(4):22–36. doi: 10.1080/1331677X.2010.11517431.
  • de la Cruz López, María Pilar, Juan José Cartelle Barros, Alfredo Del Caño Gochi, and Manuel Lara Coira. 2021. “New Approach for Managing Sustainability in Projects.” Sustainability (Switzerland) 13(13):1–27. doi: 10.3390/su13137037.
  • Management, Project. 2020. “Assessment of Risk Factors to Cost And.” CTBUH Journal (Iii):28–36. Olawale A. Yakubu and Sun Ming. 2010. “COST AND TIME CONTROL OF CONSTRUCTION PROJECTS: INHIBITING
  • FACTORS AND MITIGATING MEASURES IN PRACTICE Yakubu Adisa Olawale, Ph.D., MCIOB and Ming Sun, Ph.D. (Professor).” Construction Management and Economics 28(5):509–26.
  • Özdemir, M. 2010. “A Probabilistic Schedule Delay Analysis in Construction Projects By Using Fuzzy Logic Incorporated With Relative Importance Index (Rii) Method.” (July).
  • Padickakudy, Martin. 2019. “Evaluating the Importance of Sustainability in the Project Management.” Poku, Stephen E., and David Arditi. 2006. “Construction Scheduling and Progress Control Using Geographical Information Systems.” Journal of Computing in Civil Engineering 20(5):351–60.
  • Ribeirinho, Maria João, Jose Luis Blanco, Jan Mischke, David Rockhill, Erik Sjödin, Gernot Strube, Rob Palter, and Timmy Andersson. 2020. “The next Normal in Construction.” Mckinsey & Company (June):84.
  • Sanaz Tayefeh Hashemi, Omid Mahdi Ebadati, Harleen Kaur. 2019. “Cost Estimation and Prediction in Construction Projects: A Systematic Review on Machine Learning Techniques.” 1–27.
  • Sharma, Sunil, and V. K. Bansal. 2018. “Location-Based Planning and Scheduling of Highway Construction Projects in Hilly Terrain Using GIS.” Canadian Journal of Civil Engineering 45(7):570–82.
  • Williams, Teakon J. 2020. “Relationships Between Cost Estimates, Scheduling and Project Success in the Construction Sector.” ProQuest Dissertations and Theses 174.
  • Xie, Linlin, Yajiao Chen, and Ruidong Chang. 2021. “Scheduling Optimization of Prefabricated Construction Projects by Genetic Algorithm.” Applied Sciences (Switzerland) 11(12). doi: 10.3390/app11125531.
  • Zhou, J., P. E. D. Love, X. Wang, K. L. Teo, and Z. Irani. 2013. “A Review of Methods and Algorithms for Optimizing Construction Scheduling.” Journal of the Operational Research Society 64(8):1091–1105. doi: 10.1057/jors.2012.174.

Year 2025, Volume: 9 Issue: 1, 101 - 110, 30.06.2025

Abstract

References

  • Ahbab, Changiz. 2019. “An Investigation on Time and Cost Overrun in Construction Projects An Investigation on Time and Cost Overrun in Construction Projects.” East Mediterranean University (April):1–170.
  • Ankit Vishwakarma, Ashish Thakur, Sushant Singh, and Ashwini Salunkhe. 2016. “Risk Assessment in Construction of Highway Project.” International Journal of Engineering Research And V5(02):637–41. doi: 10.17577/ijertv5is020515.
  • Asal, Emad Mohamed. 2014. “Factors Affecting Building Construction Projects Cost Estimating.” Arab Academy for Science, Technology and Maritime Transport (AASTMT) 95.
  • Bansal, V. K., and Mahesh Pal. 2011. “Construction Projects Scheduling Using GIS Tools.” International Journal of Construction Management 11(1):1–18.
  • Bari, Nor Azmi Ahmad, Rosnah Yusuff, Napsiah Ismail, Aini Jaapar, and Rizan Ahmad. 2012. “Factors Influencing the Construction Cost of Industrialised Building System (IBS) Projects.” Procedia - Social and Behavioral Sciences 35(December 2011):689–96. doi: 10.1016/j.sbspro.2012.02.138.
  • Bukłaha, Emil. 2017. “Project Controlling in the Adaptive Perspective of Project Management.” 1(1):8–17. Chau, Kwok Wing, M. Anson, and J. P. Zhang. 2003. “Implementation of Visualization as Planning and Scheduling Tool in Construction.” Building and Environment 38(5):713–19.
  • Khalilzadeh, Mohammad, Hedieh Shakeri, Hadis Gholami, and Leila Amini. 2017. “A Heuristic Algorithm for Project Scheduling with Fuzzy Parameters.” Procedia Computer Science 121:63–71. doi: 10.1016/j.procs.2017.11.010. Kishan, Patel & Bhatt, Dr. Rajiv & Bhavsar, Prof. J. J. 2014. “A Study of Risk Factors Affecting Building Construction Projects.” International Journal of Engineering Research & Technology 3(12):831–35.
  • Klanšek, Uroš, and Mirko Pšunder. 2010. “Troškovna Optimizacija Terminskih Planova Za Vodenje Projekata.” Ekonomska Istrazivanja 23(4):22–36. doi: 10.1080/1331677X.2010.11517431.
  • de la Cruz López, María Pilar, Juan José Cartelle Barros, Alfredo Del Caño Gochi, and Manuel Lara Coira. 2021. “New Approach for Managing Sustainability in Projects.” Sustainability (Switzerland) 13(13):1–27. doi: 10.3390/su13137037.
  • Management, Project. 2020. “Assessment of Risk Factors to Cost And.” CTBUH Journal (Iii):28–36. Olawale A. Yakubu and Sun Ming. 2010. “COST AND TIME CONTROL OF CONSTRUCTION PROJECTS: INHIBITING
  • FACTORS AND MITIGATING MEASURES IN PRACTICE Yakubu Adisa Olawale, Ph.D., MCIOB and Ming Sun, Ph.D. (Professor).” Construction Management and Economics 28(5):509–26.
  • Özdemir, M. 2010. “A Probabilistic Schedule Delay Analysis in Construction Projects By Using Fuzzy Logic Incorporated With Relative Importance Index (Rii) Method.” (July).
  • Padickakudy, Martin. 2019. “Evaluating the Importance of Sustainability in the Project Management.” Poku, Stephen E., and David Arditi. 2006. “Construction Scheduling and Progress Control Using Geographical Information Systems.” Journal of Computing in Civil Engineering 20(5):351–60.
  • Ribeirinho, Maria João, Jose Luis Blanco, Jan Mischke, David Rockhill, Erik Sjödin, Gernot Strube, Rob Palter, and Timmy Andersson. 2020. “The next Normal in Construction.” Mckinsey & Company (June):84.
  • Sanaz Tayefeh Hashemi, Omid Mahdi Ebadati, Harleen Kaur. 2019. “Cost Estimation and Prediction in Construction Projects: A Systematic Review on Machine Learning Techniques.” 1–27.
  • Sharma, Sunil, and V. K. Bansal. 2018. “Location-Based Planning and Scheduling of Highway Construction Projects in Hilly Terrain Using GIS.” Canadian Journal of Civil Engineering 45(7):570–82.
  • Williams, Teakon J. 2020. “Relationships Between Cost Estimates, Scheduling and Project Success in the Construction Sector.” ProQuest Dissertations and Theses 174.
  • Xie, Linlin, Yajiao Chen, and Ruidong Chang. 2021. “Scheduling Optimization of Prefabricated Construction Projects by Genetic Algorithm.” Applied Sciences (Switzerland) 11(12). doi: 10.3390/app11125531.
  • Zhou, J., P. E. D. Love, X. Wang, K. L. Teo, and Z. Irani. 2013. “A Review of Methods and Algorithms for Optimizing Construction Scheduling.” Journal of the Operational Research Society 64(8):1091–1105. doi: 10.1057/jors.2012.174.
There are 19 citations in total.

Details

Primary Language English
Subjects Civil Engineering
Journal Section Research Article
Authors

Hanan Qasim Hameed 0000-0001-6795-9142

Publication Date June 30, 2025
Submission Date November 12, 2022
Acceptance Date June 26, 2025
Published in Issue Year 2025 Volume: 9 Issue: 1

Cite

APA Qasim Hameed, H. (2025). MANAGING IRAQI CONSTRUCTION PROJECT USING AGILE APPROACH. AURUM Journal of Engineering Systems and Architecture, 9(1), 101-110. https://doi.org/10.53600/ajesa.1203154

.