The planning of electricity power systems operation
wtih increasing energy demand and its operation under optimum conditions have
gained more value in nowadays. The demanded electrical energy in the world and
in our country is met by thermal fuel plants with a very high rate. In the case
of Economic Dispatch (ED), the fuel costs of thermal power plants should be
reduced. In this study, thermal plants should operate by using Crow Search
Algorithm (CSA) is one of the heuristic methods, ED analysis of 14 buses and 6
thermal plants with 400 kV has been conducted. In the analyzes, generator
capacity constraints, with line loss and production-consumption power balance
are taken into consideration and optimum operating conditions of generators are
determined in order to minimize the total fuel cost of the system.
Enerjinin talebinin artması ile elektrik güç sistemlerinin çalışmasının planlanması ve en uygun koşullarda işletilmesi son zamanlarda artarak önem kazanmaktadır. Ülkemizde ve dünya genelinde talep edilen elektrik enerjisi oldukça yüksek oranla termik yakıtlı santraller tarafından karşılanmaktadır. Ekonomik Yük Dağıtım (EYD) probleminde termik yakıtlı santrallerin yakıt maliyetleri azaltılarak şebekenin işletilmesi amaçlanmaktadır. Bu çalışmada sezgisel yöntemlerden biri olan Karga Arama Algoritması (KAA) uygulanarak Türkiye’de kullanılan 400 kV’luk, 6 adet termik yakıtlı santrali bulunan 14 baralı bir güç sisteminde EYD problemi çözülmüştür. Yapılan çalışmada, jeneratörlerin üretim limit değerleri, hat kayıpları ve üretim-tüketim güç dengesi dikkate alınılarak sistemin toplam yakıt maliyetini en aza indirgemek için jeneratörlerin optimum çalışma şartları belirlenmiştir.
Primary Language | Turkish |
---|---|
Subjects | Engineering |
Journal Section | Articles |
Authors | |
Publication Date | January 31, 2020 |
Published in Issue | Year 2020 Volume: 8 Issue: 1 |