BibTex RIS Cite

The Influence of Management Capability, Marketing Capability and Competitive Advantage on Malaysian Construction Project Performance

Year 2016, Volume: 6 Issue: 8, 142 - 148, 01.10.2016

Abstract

Many construction projects in Malaysia experience a reducing performance. There are many factors affecting the performance of construction projects such as poor site management, inadequate planning, ineffective marketing efforts, etc. which usually lead to project delay and cost overrun. Thus, the purpose of this study was to examine the influence of management capability, marketing capability and competence advantage on Malaysian construction project performance. The sample size of this study was 420 selected construction company’s project managers. The hypothesis of this study confirmed the management capability, marketing capability and competence advantage have a relationship with the success of project performance. This research brings a better understanding of the success factors for Malaysian construction project performance.

Year 2016, Volume: 6 Issue: 8, 142 - 148, 01.10.2016

Abstract

There are 0 citations in total.

Details

Other ID JA84AC98SF
Journal Section Research Article
Authors

Baderisham Jolly This is me

Filzah Md Isa This is me

Siti Norezam Othman This is me

Muhd Afiq Syazwan Ahmdon This is me

Publication Date October 1, 2016
Published in Issue Year 2016 Volume: 6 Issue: 8

Cite

APA Jolly, B., Isa, F. M., Othman, S. N., Ahmdon, M. A. S. (2016). The Influence of Management Capability, Marketing Capability and Competitive Advantage on Malaysian Construction Project Performance. International Review of Management and Marketing, 6(8), 142-148.
AMA Jolly B, Isa FM, Othman SN, Ahmdon MAS. The Influence of Management Capability, Marketing Capability and Competitive Advantage on Malaysian Construction Project Performance. IRMM. October 2016;6(8):142-148.
Chicago Jolly, Baderisham, Filzah Md Isa, Siti Norezam Othman, and Muhd Afiq Syazwan Ahmdon. “The Influence of Management Capability, Marketing Capability and Competitive Advantage on Malaysian Construction Project Performance”. International Review of Management and Marketing 6, no. 8 (October 2016): 142-48.
EndNote Jolly B, Isa FM, Othman SN, Ahmdon MAS (October 1, 2016) The Influence of Management Capability, Marketing Capability and Competitive Advantage on Malaysian Construction Project Performance. International Review of Management and Marketing 6 8 142–148.
IEEE B. Jolly, F. M. Isa, S. N. Othman, and M. A. S. Ahmdon, “The Influence of Management Capability, Marketing Capability and Competitive Advantage on Malaysian Construction Project Performance”, IRMM, vol. 6, no. 8, pp. 142–148, 2016.
ISNAD Jolly, Baderisham et al. “The Influence of Management Capability, Marketing Capability and Competitive Advantage on Malaysian Construction Project Performance”. International Review of Management and Marketing 6/8 (October 2016), 142-148.
JAMA Jolly B, Isa FM, Othman SN, Ahmdon MAS. The Influence of Management Capability, Marketing Capability and Competitive Advantage on Malaysian Construction Project Performance. IRMM. 2016;6:142–148.
MLA Jolly, Baderisham et al. “The Influence of Management Capability, Marketing Capability and Competitive Advantage on Malaysian Construction Project Performance”. International Review of Management and Marketing, vol. 6, no. 8, 2016, pp. 142-8.
Vancouver Jolly B, Isa FM, Othman SN, Ahmdon MAS. The Influence of Management Capability, Marketing Capability and Competitive Advantage on Malaysian Construction Project Performance. IRMM. 2016;6(8):142-8.