BibTex RIS Cite

Açık işletmelerde Kontrollü Patlatma Teknikleriyle Maliyet Optimizasyonu

Year 1992, Volume: 31 Issue: 2, 13 - 28, 01.06.1992

Abstract

Taş ocaklarında patlatma sonrası istenilen tane dağılımı çeşitli uygulayıcılarca değişik şarj, delik çapı ve delik düzeni kullanılarak elde edilmeye çalışılmıştır. Bu yazı Bekhme Barajı, Sedada ve Topruk Kalker ocaklarıyla Kale ve Nijelsat granit ocaklarında yapılan maliyet optimizasyon çalışmalarını içermektedir

The Cost Optimization of Open Quarries by Controlled Blasting Technology

Year 1992, Volume: 31 Issue: 2, 13 - 28, 01.06.1992

Abstract

Fragmentation in rock quarries is tried to be achieved by changing the specific charge, drill pattern and bore hole diameters by different experts. This paper is a brief summary consis­ting of the practical utilization of the cost optimization in Bekhme Dam, Sedada, Topruk and Kale, Nijelsat quarries which are limestone and granite in rock structure respectively

There are 0 citations in total.

Details

Other ID JA63ZF52AR
Journal Section Research Article
Authors

Taner Sümer This is me

Ü. Ercüment Öktem This is me

Lars Frandberg This is me

Publication Date June 1, 1992
Submission Date June 1, 1992
Published in Issue Year 1992 Volume: 31 Issue: 2

Cite

APA Sümer, T., Öktem, Ü. E., & Frandberg, L. (1992). The Cost Optimization of Open Quarries by Controlled Blasting Technology. Scientific Mining Journal, 31(2), 13-28.
AMA Sümer T, Öktem ÜE, Frandberg L. The Cost Optimization of Open Quarries by Controlled Blasting Technology. Mining. June 1992;31(2):13-28.
Chicago Sümer, Taner, Ü. Ercüment Öktem, and Lars Frandberg. “The Cost Optimization of Open Quarries by Controlled Blasting Technology”. Scientific Mining Journal 31, no. 2 (June 1992): 13-28.
EndNote Sümer T, Öktem ÜE, Frandberg L (June 1, 1992) The Cost Optimization of Open Quarries by Controlled Blasting Technology. Scientific Mining Journal 31 2 13–28.
IEEE T. Sümer, Ü. E. Öktem, and L. Frandberg, “The Cost Optimization of Open Quarries by Controlled Blasting Technology”, Mining, vol. 31, no. 2, pp. 13–28, 1992.
ISNAD Sümer, Taner et al. “The Cost Optimization of Open Quarries by Controlled Blasting Technology”. Scientific Mining Journal 31/2 (June 1992), 13-28.
JAMA Sümer T, Öktem ÜE, Frandberg L. The Cost Optimization of Open Quarries by Controlled Blasting Technology. Mining. 1992;31:13–28.
MLA Sümer, Taner et al. “The Cost Optimization of Open Quarries by Controlled Blasting Technology”. Scientific Mining Journal, vol. 31, no. 2, 1992, pp. 13-28.
Vancouver Sümer T, Öktem ÜE, Frandberg L. The Cost Optimization of Open Quarries by Controlled Blasting Technology. Mining. 1992;31(2):13-28.

22562 22561 22560 22590 22558