BibTex RIS Cite

The Roadheader Performance in istanbul Eyüp Tunnel and the Importance of the Results for Mining Engineering

Year 1988, Volume: 27 Issue: 2, 9 - 16, 01.06.1988

Abstract

This article is mainly concerned with the geotechnical factors affecting roadheader performance in Eyüp Tunnel. Firsty, shift data, overall machine performance and geo­technical properties of the rock formations in the zones are examined in detail. A statiscical analysis showed that rock mass cuttability index defined as compressive strength xR.Q.D2'3 is the main factor governing the roadheader advance rate-and the results are discussed from the mining engineering point of view

İstanbul Eyüp Tünelinde Galeri Açma Makinesi ile Elde Edilen Sonuçlar ve Bunların Maden Mühendisliği Açısından Önemi

Year 1988, Volume: 27 Issue: 2, 9 - 16, 01.06.1988

Abstract

Bu çalışmada Eyüp Tünelinde kullanılan galeri açma makinesinin performansını et­kileyen jeoteknik etmenlerle ilgilidir. İlk olarak vardiya verileri ve makina performansı­nın tümüyle analizleri yapılmış, geçilen formasyonların jeoteknik özellikleri ile makina ilerleme hızı arasındaki istatistiksel bağıntılar araştırılmıştır. Sonuçta basınç dayanımı xR.Q.D. ' olarak tanımlanan kayaç kütlesi kazılabilirlik indeksinin en iyi neticeyi verdiği görülmüş ve sonuçlar maden mühendisliği açısından irdelenmiştir

There are 0 citations in total.

Details

Other ID JA87BB29VT
Journal Section Research Article
Authors

Nuh Bilgin This is me

Turan Seyrek This is me

Kourosh Shahrıar This is me

Publication Date June 1, 1988
Submission Date June 1, 1988
Published in Issue Year 1988 Volume: 27 Issue: 2

Cite

APA Bilgin, N., Seyrek, T., & Shahrıar, K. (1988). The Roadheader Performance in istanbul Eyüp Tunnel and the Importance of the Results for Mining Engineering. Bilimsel Madencilik Dergisi, 27(2), 9-16.
AMA Bilgin N, Seyrek T, Shahrıar K. The Roadheader Performance in istanbul Eyüp Tunnel and the Importance of the Results for Mining Engineering. Mining. June 1988;27(2):9-16.
Chicago Bilgin, Nuh, Turan Seyrek, and Kourosh Shahrıar. “The Roadheader Performance in Istanbul Eyüp Tunnel and the Importance of the Results for Mining Engineering”. Bilimsel Madencilik Dergisi 27, no. 2 (June 1988): 9-16.
EndNote Bilgin N, Seyrek T, Shahrıar K (June 1, 1988) The Roadheader Performance in istanbul Eyüp Tunnel and the Importance of the Results for Mining Engineering. Bilimsel Madencilik Dergisi 27 2 9–16.
IEEE N. Bilgin, T. Seyrek, and K. Shahrıar, “The Roadheader Performance in istanbul Eyüp Tunnel and the Importance of the Results for Mining Engineering”, Mining, vol. 27, no. 2, pp. 9–16, 1988.
ISNAD Bilgin, Nuh et al. “The Roadheader Performance in Istanbul Eyüp Tunnel and the Importance of the Results for Mining Engineering”. Bilimsel Madencilik Dergisi 27/2 (June 1988), 9-16.
JAMA Bilgin N, Seyrek T, Shahrıar K. The Roadheader Performance in istanbul Eyüp Tunnel and the Importance of the Results for Mining Engineering. Mining. 1988;27:9–16.
MLA Bilgin, Nuh et al. “The Roadheader Performance in Istanbul Eyüp Tunnel and the Importance of the Results for Mining Engineering”. Bilimsel Madencilik Dergisi, vol. 27, no. 2, 1988, pp. 9-16.
Vancouver Bilgin N, Seyrek T, Shahrıar K. The Roadheader Performance in istanbul Eyüp Tunnel and the Importance of the Results for Mining Engineering. Mining. 1988;27(2):9-16.

22562 22561 22560 22590 22558