Conference Paper
BibTex RIS Cite

Identification of Green Retrofitting Procurement and Permitting Processes in High-rise Office Buildings in Jakarta Based on PerMen PUPR No.21 Year 2021 and GBC Indonesia that Affects Project Time Performance

Year 2024, Volume: 04 Issue: 01, 15 - 28, 31.07.2024

Abstract

The concept of green buildings or green buildings is highly needed in the present era, considering the drastic decline in global climate conditions. However, its development is greatly hindered because the implementation of green building concepts is primarily focused on new constructions, while almost two-thirds of the world's buildings are already built. Therefore, the objective of this research is to enhance the Performance of Green Retrofitting Implementation Time, which is expected to accelerate the growth of existing green buildings in Indonesia by identifying the Procurement and Permitting Processes of Green Retrofitting in High-Rise Office Buildings in Jakarta based on PERMEN PU NO 21 TAHUN 2021 (Regulation of the Minister of Public Works and Housing Number 21 of 2021) and Green Building Council Indonesia (GBCI) through work breakdown structure (WBS) along with their high-risk activities and improvement strategies using a preventive approach that Influences the Performance of Green Retrofitting implementation time. This research analysis involves 15 respondents' data on risks in the procurement and permitting processes, which will be processed using a qualitative risk approach. Based on the results of literature studies, expert validation, and respondent questionnaires, a total of 83 activities in the procurement and permitting processes of green retrofitting were identified, 214 risk indicators that affect the performance of green retrofitting schedule, along with 56 prevention strategies for the high-risk situation, aiming to accelerate the growth of existing green buildings in Indonesia.

Project Number

the paper comes from the SEMIT 2023

References

  • [1] Arnell, N. W., Lowe, J. A., Challinor, A. J., & Osborn, T. J. (2019). Global and regional impacts of climate change at different levels of global temperature increase. Climatic Change, 155(3), 377–391. https://doi.org/10.1007/s10584- 019-02464-z
  • [2] Lubis, R. F., Delinom, R., & Geoteknologi, P. (n.d.). PERUBAHAN IKLIM DAN PEMANASAN GLOBAL DI INDONESIA; DAMPAKNYA TERHADAP KONDISI BAWAH PERMUKAAN STUDI KASUS : DKI JAKARTA.
  • [3] Skytt, T., Nielsen, S. N., & Jonsson, B. G. (2020). Global warming potential and absolute global temperature change potential from carbon dioxide and methane fluxes as indicators of regional sustainability – A case study of Jämtland, Sweden. Ecological Indicators, 110. https://doi.org/10.1016/j.ecolind.2019.105831
  • [4] BPHN. (n.d.). na_ruu_ratifikasi_paris_agreement (2). Na_ruu_ratifikasi_paris_agreement. Retrieved July 23, 2023, from https://bphn.go.id/data/documents/na_ruu_ratifikasi_paris_agreement.pdf
  • [5] Eko, W., Peneliti Bidang, C., Ozon, P., & Udara, P. (n.d.). PENGARUH PEMANASAN GLOBAL TERHADAP LINGKUNGAN BUMI.
  • [6] Izumi, F. (2020). Climate Emergency Declaration. Climate Emergency Declaration.
  • [7] UGM (n.d) The building industry contributes to the process of environmental degradation
  • [8] Architecture 2030. (n.d.). Actions For Zero Carbon Buildings Existing Buildings.
  • [9] Devi, Tr., & Reddy, Vs. (n.d.). Work Breakdown Structure of the Project. In International Journal of Engineering Research and Applications (IJERA) (Vol. 2). www.ijera.com
  • [10] Regulation of the Minister of State for the Environment Number 16 of 2012 concerning Performance Evaluation Green Building
  • [11] The U.S. Green Building Council. (n.d.). Building Retrofits.
  • [12] Green Building Council Indonesia. (n.d.). GREENSHIP Rating Tools Existing Building.
  • [13] Presidential Regulation Number 12 of 2021 concerning Government Procurement of Goods/Services
  • [14] Sutedi, Adrian., (2012) Legal aspects of the procurement of goods and services and their various issues
  • [15] Andrianto, Nico., (2007) Transparency and public accountability through e-government
  • [16] Priyanta, M. (2019). Regulasi Perizinan Mendirikan Bangunan dalam Mendukung Kemudahan Berusaha Menuju Bangsa yang Adil dan Makmur. https://doi.org/10.24843/JMHU.2019.v08.i03
  • [17] Simbawa, Anggreini Anglia., (2022) Procedure for obtaining building construction approval
  • [18] Government Regulation Number 16 of 2021 concerning building
  • [19] Minister of Public Works and Housing Regulation Number 27/PRT/M/2018 on the Certificate of Functionality for Buildings
  • [20] Minister of Environment Regulation Number 16 of 2012 on Guidelines for the Preparation of Environmental Documents
  • [21] Burghate, M. (2018). Work Breakdown Structure: Simplifying Project Management. In International Journal of Commerce and Management Studies (IJCAMS) (Vol. 3, Issue 2). www.ijcams.com
  • [22] A Guide to the Project Management Body of Knowledge (PMBOK 6 ® Guide)
  • [23] Kerzner, Project Management: A Systems Approach to Planning, Scheduling, and Controlling, 2017; Kerzner,
  • [24] Strategic Planning for Project Management Using a Project Management Maturity Model, 2001 24. Wideman, Risk Management. A guide to managing risk opportunities, 1992
  • [25] Zhao, X., Hwang, B.G., and See, Y.L. (2015). Green Retrofit Projects: Risk Assessment and Mitigation. E (Eds) Procs 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK, Association of Researchers in Construction Management, 125-134.
  • [26] Hwang, B. G., Shan, M., Phua, H., & Chi, S. (2017). An exploratory analysis of risks in green residential building construction projects: The case of Singapore. Sustainability (Switzerland), 9(7). https://doi.org/10.3390/su9071116
  • [27] Bacon, R. W., & Besant-Jones, J. E. (1998). Estimating construction costs and schedules Experience with power generation projects in developing countries. In Energy Policy (Vol. 26, Issue 4).
  • [28] (Kerzner, Project Management: A Systems Approach to Planning, Scheduling, and Controlling, 2017)
  • [29] Yean, F., Ling, Y., Swee, ;, Chan, L., Chong, ; Edwin, & Ee, L. P. (n.d.). Predicting Performance of Design-Build and Design-Bid-Build Projects. https://doi.org/10.1061/ASCE0733-93642004130:175
  • [30] Lusi indah, Wijayanti., Development of quality management system procurement consultant services to improve procurement performance in Ministry of Transportation (2017)
  • [31] Huston, Charles L. Management of Project Procurement. (1996)
  • [32] Sudarwani, M. M. (2021). The implementation of green architecture and green building is an effort to achieve sustainable architecture.

Identification of Green Retrofitting Procurement and Permitting Processes in High-rise Office Buildings in Jakarta Based on PerMen PUPR No.21 Year 2021 and GBC Indonesia that Affects Project Time Performance

Year 2024, Volume: 04 Issue: 01, 15 - 28, 31.07.2024

Abstract

The concept of green buildings or green buildings is highly needed in the present era, considering the drastic decline in global climate conditions. However, its development is greatly hindered because the implementation of green building concepts is primarily focused on new constructions, while almost two-thirds of the world's buildings are already built. Therefore, the objective of this research is to enhance the Performance of Green Retrofitting Implementation Time, which is expected to accelerate the growth of existing green buildings in Indonesia by identifying the Procurement and Permitting Processes of Green Retrofitting in High-Rise Office Buildings in Jakarta based on PERMEN PU NO 21 TAHUN 2021 (Regulation of the Minister of Public Works and Housing Number 21 of 2021) and Green Building Council Indonesia (GBCI) through work breakdown structure (WBS) along with their high-risk activities and improvement strategies using a preventive approach that Influences the Performance of Green Retrofitting implementation time. This research analysis involves 15 respondents' data on risks in the procurement and permitting processes, which will be processed using a qualitative risk approach. Based on the results of literature studies, expert validation, and respondent questionnaires, a total of 83 activities in the procurement and permitting processes of green retrofitting were identified, 214 risk indicators that affect the performance of green retrofitting schedule, along with 56 prevention strategies for the high-risk situation, aiming to accelerate the growth of existing green buildings in Indonesia.

Project Number

the paper comes from the SEMIT 2023

References

  • [1] Arnell, N. W., Lowe, J. A., Challinor, A. J., & Osborn, T. J. (2019). Global and regional impacts of climate change at different levels of global temperature increase. Climatic Change, 155(3), 377–391. https://doi.org/10.1007/s10584- 019-02464-z
  • [2] Lubis, R. F., Delinom, R., & Geoteknologi, P. (n.d.). PERUBAHAN IKLIM DAN PEMANASAN GLOBAL DI INDONESIA; DAMPAKNYA TERHADAP KONDISI BAWAH PERMUKAAN STUDI KASUS : DKI JAKARTA.
  • [3] Skytt, T., Nielsen, S. N., & Jonsson, B. G. (2020). Global warming potential and absolute global temperature change potential from carbon dioxide and methane fluxes as indicators of regional sustainability – A case study of Jämtland, Sweden. Ecological Indicators, 110. https://doi.org/10.1016/j.ecolind.2019.105831
  • [4] BPHN. (n.d.). na_ruu_ratifikasi_paris_agreement (2). Na_ruu_ratifikasi_paris_agreement. Retrieved July 23, 2023, from https://bphn.go.id/data/documents/na_ruu_ratifikasi_paris_agreement.pdf
  • [5] Eko, W., Peneliti Bidang, C., Ozon, P., & Udara, P. (n.d.). PENGARUH PEMANASAN GLOBAL TERHADAP LINGKUNGAN BUMI.
  • [6] Izumi, F. (2020). Climate Emergency Declaration. Climate Emergency Declaration.
  • [7] UGM (n.d) The building industry contributes to the process of environmental degradation
  • [8] Architecture 2030. (n.d.). Actions For Zero Carbon Buildings Existing Buildings.
  • [9] Devi, Tr., & Reddy, Vs. (n.d.). Work Breakdown Structure of the Project. In International Journal of Engineering Research and Applications (IJERA) (Vol. 2). www.ijera.com
  • [10] Regulation of the Minister of State for the Environment Number 16 of 2012 concerning Performance Evaluation Green Building
  • [11] The U.S. Green Building Council. (n.d.). Building Retrofits.
  • [12] Green Building Council Indonesia. (n.d.). GREENSHIP Rating Tools Existing Building.
  • [13] Presidential Regulation Number 12 of 2021 concerning Government Procurement of Goods/Services
  • [14] Sutedi, Adrian., (2012) Legal aspects of the procurement of goods and services and their various issues
  • [15] Andrianto, Nico., (2007) Transparency and public accountability through e-government
  • [16] Priyanta, M. (2019). Regulasi Perizinan Mendirikan Bangunan dalam Mendukung Kemudahan Berusaha Menuju Bangsa yang Adil dan Makmur. https://doi.org/10.24843/JMHU.2019.v08.i03
  • [17] Simbawa, Anggreini Anglia., (2022) Procedure for obtaining building construction approval
  • [18] Government Regulation Number 16 of 2021 concerning building
  • [19] Minister of Public Works and Housing Regulation Number 27/PRT/M/2018 on the Certificate of Functionality for Buildings
  • [20] Minister of Environment Regulation Number 16 of 2012 on Guidelines for the Preparation of Environmental Documents
  • [21] Burghate, M. (2018). Work Breakdown Structure: Simplifying Project Management. In International Journal of Commerce and Management Studies (IJCAMS) (Vol. 3, Issue 2). www.ijcams.com
  • [22] A Guide to the Project Management Body of Knowledge (PMBOK 6 ® Guide)
  • [23] Kerzner, Project Management: A Systems Approach to Planning, Scheduling, and Controlling, 2017; Kerzner,
  • [24] Strategic Planning for Project Management Using a Project Management Maturity Model, 2001 24. Wideman, Risk Management. A guide to managing risk opportunities, 1992
  • [25] Zhao, X., Hwang, B.G., and See, Y.L. (2015). Green Retrofit Projects: Risk Assessment and Mitigation. E (Eds) Procs 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK, Association of Researchers in Construction Management, 125-134.
  • [26] Hwang, B. G., Shan, M., Phua, H., & Chi, S. (2017). An exploratory analysis of risks in green residential building construction projects: The case of Singapore. Sustainability (Switzerland), 9(7). https://doi.org/10.3390/su9071116
  • [27] Bacon, R. W., & Besant-Jones, J. E. (1998). Estimating construction costs and schedules Experience with power generation projects in developing countries. In Energy Policy (Vol. 26, Issue 4).
  • [28] (Kerzner, Project Management: A Systems Approach to Planning, Scheduling, and Controlling, 2017)
  • [29] Yean, F., Ling, Y., Swee, ;, Chan, L., Chong, ; Edwin, & Ee, L. P. (n.d.). Predicting Performance of Design-Build and Design-Bid-Build Projects. https://doi.org/10.1061/ASCE0733-93642004130:175
  • [30] Lusi indah, Wijayanti., Development of quality management system procurement consultant services to improve procurement performance in Ministry of Transportation (2017)
  • [31] Huston, Charles L. Management of Project Procurement. (1996)
  • [32] Sudarwani, M. M. (2021). The implementation of green architecture and green building is an effort to achieve sustainable architecture.
There are 32 citations in total.

Details

Primary Language English
Subjects Environmental Engineering (Other)
Journal Section Research Article
Authors

Benedict Mario 0009-0009-7040-6616

Project Number the paper comes from the SEMIT 2023
Publication Date July 31, 2024
Submission Date December 15, 2023
Acceptance Date July 23, 2024
Published in Issue Year 2024 Volume: 04 Issue: 01

Cite

IEEE B. Mario, “Identification of Green Retrofitting Procurement and Permitting Processes in High-rise Office Buildings in Jakarta Based on PerMen PUPR No.21 Year 2021 and GBC Indonesia that Affects Project Time Performance”, Researcher, vol. 04, no. 01, pp. 15–28, 2024.

The journal "Researcher: Social Sciences Studies" (RSSS), which started its publication life in 2013, continues its activities under the name of "Researcher" as of August 2020, under Ankara Bilim University.
It is an internationally indexed, nationally refereed, scientific and electronic journal that publishes original research articles aiming to contribute to the fields of Engineering and Science in 2021 and beyond.
The journal is published twice a year, except for special issues.
Candidate articles submitted for publication in the journal can be written in Turkish and English. Articles submitted to the journal must not have been previously published in another journal or sent to another journal for publication.