TR
EN
Comparison of Environmental Impact Assesment Processes for Hydropower Plants
Abstract
Energy is considered to be a key player in the generation of wealth and also a significant component in economic development. This makes energy resources extremely significant in the world. Efforts to prevent negative impacts of hydroelectric power plants (HEPP) or to evaluate the measures to be taken to minimize these impacts are carried out within the scope of Environmental Impact Assessment (EIA). However, the existing EIA process in the environment has become inadequate to provide environmental standards. This has made it necessary to develop the cumulative (CEIA) and strategic (SEA) Environmental Assessments, which are the advanced stages of the traditional EIA. The CEIA is the assessment of the effects of an action along with other human activities in the past, present or future, leading to environmental impacts. The SEA, a tool for the implementation of sustainable development, is defined as the process of evaluation of possible negative effects of plans, programs and policies on the environment and the process of reducing these impacts. In this study, the problems and inadequacies encountered in the implementation of EIA in HEPP projects have been examined and the innovations brought by CEIA and SEA to environmental management and the necessity of these processes have been evaluated with case studies. At the end of the study, some suggestions have been made to better implement the CEIA and SEA processes.
Keywords
References
- [1] Arikan, E., Dieterle, G., Bouzaher, A., Ceribasi, I.H., Kaya, D.E., Nishimura, S., Karamullaoglu, U.; Kahraman, B., 2012. “Sample guidelines: Cumulative environmental impact assessment for hydropower projects in Turkey”, Washington DC; World Bank.
- [2] Asha, R., Arora, R., Mathur, V.B., Sivakumar, K., Sathyakumar, S., Rawat, G.S., Johnson, J.A., Ramesh, K., Dimri, N.K., Maletha, A., 2012. “Assessment of cumulative impacts of hydroelectric projects on aquatic and terrestrial biodiversity in Alaknanda and Bhagirathi Basins”, Uttarakhand. Wildlife Institute of India, Technical Report.
- [3] Aydin, M., Cerci, E., “Relation of Directives of EIA-SEA and Evaluation of Our Legislation in this Context”, International EIA Congress, 8-10 November, 235-242 (in Turkish).
- [4] Guo, L. N., She, C., Kong, D. B., Yan, S. L., Xu, Y. P., Khayatnezhad, M., and Gholinia, F., 2021. Prediction of the effects of climate change on hydroelectric generation, electricity demand, and emissions of greenhouse gases under climatic scenarios and optimized ANN model. Energy Reports, 7, 5431-5445.
- [5] Koc, C., 2014. “A study on the development of hydropower potential in Turkey”, Renewable and Sustainable Energy Reviews 39, 498–508.
- [6] MEU (Ministry of Environment and Urbanization), “Sample Guidelines: Cumulative Environmental Impact Assessment for Hydropower Projects in Turkey”, 2012.
- [7] Say, N., “Energy Policies and SEA: An Example of Turkey”, International EIA Congress, 8-10 November, 265-278 (in Turkish).
- [8] Turhan, E., Tantekin, A., Keçeci, A., “Evaluation of Strategic Environmental Impact Assessment (SEA) Approach within the Scope of Hydroelectric Power Plant (HEPP) Projects”, VIII Renewable Energy Resources Symposium, October 2105, 63-67, (in Turkish).
Details
Primary Language
English
Subjects
-
Journal Section
Research Article
Publication Date
June 28, 2022
Submission Date
March 12, 2022
Acceptance Date
May 30, 2022
Published in Issue
Year 2022 Volume: 6 Number: 1
APA
Babacan, H. T., & Yüksek, Ö. (2022). Comparison of Environmental Impact Assesment Processes for Hydropower Plants. Turkish Journal of Hydraulic, 6(1), 12-20. https://izlik.org/JA35WW83XZ
AMA
1.Babacan HT, Yüksek Ö. Comparison of Environmental Impact Assesment Processes for Hydropower Plants. Turkish Journal of Hydraulic. 2022;6(1):12-20. https://izlik.org/JA35WW83XZ
Chicago
Babacan, Hasan Törehan, and Ömer Yüksek. 2022. “Comparison of Environmental Impact Assesment Processes for Hydropower Plants”. Turkish Journal of Hydraulic 6 (1): 12-20. https://izlik.org/JA35WW83XZ.
EndNote
Babacan HT, Yüksek Ö (June 1, 2022) Comparison of Environmental Impact Assesment Processes for Hydropower Plants. Turkish Journal of Hydraulic 6 1 12–20.
IEEE
[1]H. T. Babacan and Ö. Yüksek, “Comparison of Environmental Impact Assesment Processes for Hydropower Plants”, Turkish Journal of Hydraulic, vol. 6, no. 1, pp. 12–20, June 2022, [Online]. Available: https://izlik.org/JA35WW83XZ
ISNAD
Babacan, Hasan Törehan - Yüksek, Ömer. “Comparison of Environmental Impact Assesment Processes for Hydropower Plants”. Turkish Journal of Hydraulic 6/1 (June 1, 2022): 12-20. https://izlik.org/JA35WW83XZ.
JAMA
1.Babacan HT, Yüksek Ö. Comparison of Environmental Impact Assesment Processes for Hydropower Plants. Turkish Journal of Hydraulic. 2022;6:12–20.
MLA
Babacan, Hasan Törehan, and Ömer Yüksek. “Comparison of Environmental Impact Assesment Processes for Hydropower Plants”. Turkish Journal of Hydraulic, vol. 6, no. 1, June 2022, pp. 12-20, https://izlik.org/JA35WW83XZ.
Vancouver
1.Hasan Törehan Babacan, Ömer Yüksek. Comparison of Environmental Impact Assesment Processes for Hydropower Plants. Turkish Journal of Hydraulic [Internet]. 2022 Jun. 1;6(1):12-20. Available from: https://izlik.org/JA35WW83XZ