TY - JOUR TT - Investigation of the Effects of Constrained Source Conditions on the Structure Cost AU - Kanıt, Recep AU - Baykan, Umut Naci AU - Erdal, Mürsel PY - 2005 DA - June JF - Politeknik Dergisi PB - Gazi Üniversitesi WT - DergiPark SN - 2147-9429 SP - 209 EP - 221 VL - 8 IS - 2 KW - Kısıtlı kaynaklar KW - Maliyet planlama KW - Proje çizelgeleme KW - Maliyet KW - Maliyet tahmini N2 - It is expected that all necessary sources needed for a construction project has to be included in the project at the required time with necessary amount like the other sectors. However under constrained source conditions, these expectations could not always be satisfied. Effects of source assignments on the cost and completion time of the structure have to be known during the planning stage by both investor and the contractor. In this study, effects of constraints on the workmanship sources to the project cost and time were investigated for a village clinic construction project at which the cost of the necessary sources were calculated according to the Ministry of Public Works’ pricing system UR - https://dergipark.org.tr/tr/pub/politeknik/issue//367020 L1 - https://dergipark.org.tr/tr/download/article-file/384449 ER -