TY - JOUR T1 - Process Planning and Scheduling with WNOPPT Weighted Due-Date Assignment where Earliness, Tardiness and Due-Dates are Penalized TT - Erken Tamamlanma, Gecikme ve Teslim Tarihinin Cezalandırıldığı Durumda Proses Planlama ve Çizelgelemenin WNOPPT Ağırlıklı Teslim Tarihi Belirleme ile Entegrasyonu AU - Demir, Halil İbrahim AU - Canpolat, Onur AU - Erden, Caner AU - Şimşir, Fuat PY - 2018 DA - September DO - 10.38016/jista.433085 JF - Journal of Intelligent Systems: Theory and Applications JO - JISTA PB - Özer UYGUN WT - DergiPark SN - 2651-3927 SP - 16 EP - 25 VL - 1 IS - 1 LA - en AB - Process planning, scheduling and due dateassignment are three important manufacturing functions in production system inwhich process planning is input to scheduling processes. Because of rigidprocess plans, alternative plans are not used that may affect globalperformance improvement in a bad way. Besides, scheduling without considering processplans causes unbalanced machine loadings and leads to several bottlenecks. Inthe literature, there are numerous works on process planning and scheduling andworks on scheduling with due date assignment. These three functions are notintegrated much. According to literature,due dates are assigned without considering weights of the customer. In thisstudy, these three functions are integrated and due dates are given accordingto the importance of the customers. Eight shop floors are studied. Differentlevels of integration of these three functions are tested and compared witheach other. Two search techniques used which are genetic search and randomsearch and results are compared with ordinary solutions. As the level ofintegration increased solutions became better and search techniques gave a betterresult than ordinary solutions and the genetic search outperformed randomsearch. KW - Process Planning KW - Weighted Scheduling KW - Weighted Due-Date Assignment KW - Genetic Algorithms KW - Random Search N2 - Proses planlama, çizelgeleme ve teslim tarihi belirleme üçönemli imalat fonksiyonudur. Literatüre göre proses planlama ve çizelgelemeninentegrasyonu ve teslim tarihi belirlemeli çizelgeleme üzerine çok sayıdaçalışma vardır. Fakat bu üç fonksiyonun entegre edildiği çalışmalar azdır.Literatüre göre teslim tarihleri müşteri ağırlıklarını hesaba katmadan verilmektedir.Bu çalışmada üç fonksiyon entegre edilmiş ve teslim tarihleri müşteri önemihesaba katılarak verilmiştir. Sekiz atölye çalışılmıştır. Bu üç fonksiyonunfarklı entegrasyon seviyeleri test edilmiş, birbirleriyle karşılaştırılmıştır.Genetik arama ve rassal aramadan oluşan iki arama tekniği kullanılmış vesonuçları sıradan çözümlerle karşılaştırılmıştır. Entegrasyon seviyesi arttıkçasonuçlar daha iyi olmuş, arama teknikleri sıradan çözümlere göre daha iyisonuçlar vermiş ve genetik arama rassal aramadan üstün çıkmıştır. CR - Adamopoulos, G.I., Pappis, C.P., 1998. Scheduling under a common due-data on parallel unrelated machines. Eur. J. Oper. Res. 105, 494–501. CR - Biskup, D., Jahnke, H., 2001. Common due date assignment for scheduling on a single machine with jointly reducible processing times. Int. J. Prod. Econ. 69, 317–322. CR - Brandimarte, P., 1999. Exploiting process plan flexibility in production scheduling: A multi-objective approach. Eur. J. Oper. Res. 114, 59–71. CR - Ceven, E., Demir, H.I., 2007. Benefits of Integrating Due-Date Assignment with Process Planning and Scheduling (Master of Science Thesis). Sakarya University.Chen, Q.M., Khoshnevis, B., 1993. Scheduling with flexible process plans. Prod. Plan. Control 4, 333–343. CR - Cheng, T.C.E., Chen, Z.-L., Shakhlevich, N.V., 2002. Common due date assignment and scheduling with ready times. Comput. Oper. Res. 29, 1957–1967. CR - Cheng, T.C.E., Kovalyov, M.Y., 1999. Complexity of parallel machine scheduling with processing-plus-wait due dates to minimize maximum absolute lateness. Eur. J. Oper. Res. 114, 403–410. CR - Demir, H.I., Taskin, H., 2005. Integrated Process Planning, Scheduling and Due-Date Assignment (PhD Thesis). Sakarya University. CR - Demir, H.I., Taskin, H., Cakar, T., 2004. Integrated process planning, scheduling and due-date assignment. Presented at the International Intelligent Manufacturing Systems, Sakarya, Turkey, pp. 1165–1175. CR - Demir, H.I., Uygun, O., Cil, I., Ipek, M., Sari, M., 2015. Process Planning and Scheduling with SLK Due-Date Assignment where Earliness, Tardiness and Due-Dates are Punished. J. Ind. Intell. Inf. 3, 173–180. CR - Gordon, V., Kubiak, W., 1998. Single machine scheduling with release and due date assignment to minimize the weighted number of late jobs. Inf. Process. Lett. 68, 153–159. CR - Gordon, V., Proth, J.-M., Chu, C., 2002. A survey of the state-of-the-art of common due date assignment and scheduling research. Eur. J. Oper. Res. 139, 1–25. CR - Gordon, V.S., Strusevich, V.A., 2009. Single machine scheduling and due date assignment with positionally dependent processing times. Eur. J. Oper. Res. 198, 57–62. CR - Hutchison, J., Leong, K., Snyder, D., Ward, P., 1991. Scheduling approaches for random job shop flexible manufacturing systems. Int. J. Prod. Res. 29, 1053–1067. CR - Khoshnevis, B., Chen, Q.M., 1991. Integration of process planning and scheduling functions. J. Intell. Manuf. 2, 165–175. CR - Kim, K.-H., Egbelu, P.J., 1999. Scheduling in a production environment with multiple process plans per job. Int. J. Prod. Res. 37, 2725–2753. CR - Kim, Y.K., Park, K., Ko, J., 2003. A symbiotic evolutionary algorithm for the integration of process planning and job shop scheduling. Comput. Oper. Res. 30, 1151–1171. CR - Kumar, M., Rajotia, S., 2005. Integration of process planning and scheduling in a job shop environment. Int. J. Adv. Manuf. Technol. 28, 109–116. CR - Lauff, V., Werner, F., 2004. Scheduling with common due date, earliness and tardiness penalties for multimachine problems: A survey. Math. Comput. Model. 40, 637–655. CR - Leung, C.W., Wong, T.N., Mak, K.L., Fung, R.Y.K., 2010. Integrated process planning and scheduling by an agent-based ant colony optimization. Comput. Ind. Eng. 59, 166–180. CR - Li, J., Yuan, X., Lee, E.S., Xu, D., 2011. Setting due dates to minimize the total weighted possibilistic mean value of the weighted earliness–tardiness costs on a single machine. Comput. Math. Appl. 62, 4126–4139. CR - Li, X., Gao, L., Zhang, C., Shao, X., 2010. A review on Integrated Process Planning and Scheduling. Int. J. Manuf. Res. 5, 161–180. CR - Lim, M.K., Zhang, D.Z., 2004. An integrated agent-based approach for responsive control of manufacturing resources. Comput. Ind. Eng., Special Issue on Selected Papers from the 27th. International Conference on Computers and Industrial Engineering, Part 1. 46, 221–232. CR - Moon, C., Lee, Y.H., Jeong, C.S., Yun, Y., 2008. Integrated process planning and scheduling in a supply chain. Comput. Ind. Eng. 54, 1048–1061. CR - Morad, N., Zalzala, A., 1999. Genetic algorithms in integrated process planning and scheduling. J. Intell. Manuf. 10, 169–179. CR - Nearchou, A.C., 2008. A differential evolution approach for the common due date early/tardy job scheduling problem. Comput. Oper. Res. 35, 1329–1343. CR - Panwalkar, S.S., Smith, M.L., Seidmann, A., 1982. Common Due Date Assignment to Minimize Total Penalty for the One Machine Scheduling Problem. Oper. Res. 30, 391–399. CR - Phanden, R.K., Jain, A., Verma, R., 2011. Integration of process planning and scheduling: a state-of-the-art review. Int. J. Comput. Integr. Manuf. 24, 517–534. Tan, W., Khoshnevis, B., 2004. A linearized polynomial mixed integer programming model for the integration of process planning and scheduling. J. Intell. Manuf. 15, 593–605. CR - Tan, W., Khoshnevis, B., 2000. Integration of process planning and scheduling— a review. J. Intell. Manuf. 11, 51–63. Usher, J.M., 2003. Evaluating the impact of alternative plans on manufacturing performance. Comput. Ind. Eng. 45, 585–596. CR - Xia, Y., Chen, B., Yue, J., 2008. Job sequencing and due date assignment in a single machine shop with uncertain processing times. Eur. J. Oper. Res. 184, 63–75. CR - Ying, K.-C., 2008. Minimizing earliness–tardiness penalties for common due date single-machine scheduling problems by a recovering beam search algorithm. Comput. Ind. Eng. 55, 494–502. CR - Zhang, H.-C., Mallur, S., 1994. An integrated model of process planning and production scheduling. Int. J. Comput. Integr. Manuf. 7, 356–364. UR - https://doi.org/10.38016/jista.433085 L1 - https://dergipark.org.tr/tr/download/article-file/518698 ER -