TY - JOUR T1 - Lead time management for production planning in job shops TT - Atölye tipi sistemlerin üretim planlamasında temin süresi yönetimi AU - Hasköse, Ahmet PY - 2020 DA - June Y2 - 2020 JF - Erciyes Üniversitesi Sosyal Bilimler Enstitüsü Dergisi JO - ERÜSOSBİLDER PB - Erciyes Üniversitesi WT - DergiPark SN - 1300-1582 SP - 179 EP - 195 IS - 48 LA - en AB - Short and reliable lead times areimportant to promote customer satisfaction and generate further orders,particularly in the case of make-to-order and engineer-to-order manufacturing.Moreover, accurate manufacturing lead times can greatly help productionplanning and allocation of capacities. The design of a manufacturing systemrefers to the configuration of elements such as the number of workstations,storage, capacity and movement of work through the system. The design of amanufacturing system can play a key role in manufacturing lead time. Thepurpose of this paper is to investigate the effects of the number ofworkstations, buffer sizes, processing capacities, number of entry workstationsand layout of a system on manufacturing lead time, and to demonstrate how suchan analysis can aid managerial decision making in production planning. Fivesets of experiments, with a total of 19 cases, were conducted. An approximatemodel for arbitrary queueing networks is used to provide insights into thegeneral behaviour of manufacturing systems. These experimental results suggestthat the manufacturing lead time of a system is the most sensitive to layout ofthe system, i.e., configuration of the system (feed-forward or feed-backwardtopology) and the number of exit workstations. KW - Job Shops KW - Queuing Network Modelling KW - Manufacturing Lead Time N2 - Kısave güvenilir temin süreleri, özellikle siparişe-özel-üretim vesiparişe-özel-tasarım şeklinde üretim yapan firmalarda müşteri memnuniyetiniartırmak ve siparişlerde süreklilik sağlamak için kritik önem taşımaktadır. Ayrıcakesin ve güvenilir üretim temin süreleri, üretim planlamasına ve kapasitetahsisine önemli ölçüde katkı sağlamaktadır. Bir üretim sisteminin tasarımı işistasyonu sayısı, bekleme alanlarının büyüklüğü, üretim kapasitesi ve işlerinsistem içindeki rotaları gibi unsurların yapılandırılmasını kapsamaktadır. Üretimsistemi tasarımı, temin süresinin belirlenmesinde önemli rol oynamaktadır. Buçalışmanın amacı, iş istasyonu sayısının, iş istasyonları arasındaki tamponalanlarının büyüklüğünün, üretim kapasitesinin, giriş iş istasyonu sayısının vesistemin yerleşim planının üretim temin süresi üzerindeki etkilerini araştırmakve böyle bir analizin üretim planlamasında yönetimsel karar almaya nasıl yardımedebileceğini göstermektir. Çalışmada, 19 vakanın bulunduğu beş ayrı gruptadenemeler gerçekleştirilmiştir. Üretimsistemlerinin performanslarının belirlenmesinde yapılandırılmamış kuyruk ağlarıiçin geliştirilen yaklaşık bir model kullanılmıştır. Deneme sonuçları üretimtemin süresinin, sistemin yerleşim planından (sistemin yapılandırmasının ileriveya geri beslemeli oluşu ve çıkış iş istasyonlarının sayısından) önemli ölçüdeetkilendiğini göstermektedir. CR - Ab-Kadir, A.R., Sajidah, W.M.K., Mohd Norzaimi, C.A., Shahril, K., & Sabri, M. (2015). Development of production layout model to improve production efficiency. Conference on Language, Education, Engineering and Technology, 2-3 September 2015, Kulim Hi-Tech Park, Kedah, Malaysia, 261-266. CR - Amaro, G.M., Hendry, L.C., & Kingsman, B.G. (1999). Competitive advantage, customisation and a new taxonomy for non make-to-stock companies. International Journal of Operations and Production Management, 19(4), 349-371. CR - Ashton J.E. (1993). Relationship between design for manufacturing, a responsive manufacturing approach, and continuous improvement. In E.J. Haug (Ed.), Concurrent Engineering: Tools and Technologies for Mechanical System Design (Vol. 108, pp. 389-404). https://doi.org/10.1007/978-3-642-78119-3_17 CR - Azaron, A., Katagiri, H., Kato, K., & Sakawa, M. (2006). Modelling complex assemblies as a queueing network for lead time control. European Journal of Operational Research, 174(1), 150-168. CR - Balsamo, S., de Nitto Persone, V., & Onvural., R. (2001). Analysis of queuing networks with blocking. Kluwer Academic Publishers. CR - Dallery, Y., & Gershwin, S.B. (1992). Manufacturing flow line system: a review of models and analytical results. Queueing Systems, Special Issue on Queueing Models of Manufacturing Systems, 12, 3-94. CR - Haskose, A., Kingsman, B.G., & Worthington, D.J. (2004). Performance analysis of make-to-order manufacturing systems under different workload control regimes. International Journal of Production Economics, 90(2), 169-186. CR - Hill, T. (1993). Manufacturing strategy: The strategic management of the manufacturing function. Macmillan Press Ltd. CR - Kingsman, B.G., Tatsiopoulos, I.P., & Hendry, L.C. (1989). A structural methodology for managing manufacturing lead times in make-to-order companies. European Journal of Operational Research, 40, 196-209. CR - Mourtzis, D., Doukas, M., Fragou, K., Efthymiou, K., & Matzorou V. (2014). Knowledge-based estimation of manufacturing lead time for complex engineered-to-order products. Procedia CIRP, 17, 499-504. CR - Papadopoulos, H.T., & Heavey, C. (1996). Queuing theory in manufacturing systems analysis and design: a classification of models for production and transfer lines. European Journal of Operational Research, 92(1), 1-27. CR - Perera, G., & Ratnayake, V. (2015). Qualitative analysis on layout flexibility of machine layout configurations. IOSR Journal of Business and Management, 17(2), 62-69. CR - Perkgoz, C., Azaron, A., Katagiri, H., Kato, K., & Sakawa, M. (2007). A multi-objective lead time control problem in multi-stage assembly systems using genetic algorithms. European Journal of Operational Research, 180(1), 292-308. CR - Perros, H.G. (1994). Queueing networks with blocking - exact and approximate solutions. Oxford University Press, Inc. CR - Stalk, G.Jr., & Hout, T.M. (1990). Competing against time. Free Press. CR - Stommel, H. (1976). Betriebliche terminplanung. De Gruyter. CR - Subba Rao, S., Gunasekaran, A., Goyal, S.K., & Martikainen, T. (1998). Waiting line model application in manufacturing. International Journal of Production Economics, 54(1), 1-28. CR - Wangari, P.N., Muchiri, P.N., & Onyancha, D.O. (2018). Impact assessment of a facility layout on manufacturing cycle time and throughput: A case study of a tannery in central Kenya. IOSR Journal of Mechanical and Civil Engineering, 15(5), 40-45. CR - Zhang, H.Y., Chen, Q.X., Smith, J.M., Mao, N., Yu, A.L., & Li, Z.T. (2017). Performance analysis of open general queuing networks with blocking and feedback. International Journal of Production Research, 55(19), 5760-5781. UR - https://dergipark.org.tr/tr/pub/erusosbilder/issue//690117 L1 - https://dergipark.org.tr/tr/download/article-file/1191326 ER -