KARMA MODELLİ MONTAJ HATLARINDA ÜRETİM ÇİZELGELEME VE SIRALAMA PROBLEMLERİNDE ÜRETİM DÜZGÜNLEŞTİRME YAKLAŞIMLARI

Volume: 16 Number: 1 August 24, 2015
EN TR

KARMA MODELLİ MONTAJ HATLARINDA ÜRETİM ÇİZELGELEME VE SIRALAMA PROBLEMLERİNDE ÜRETİM DÜZGÜNLEŞTİRME YAKLAŞIMLARI

Abstract

Mixed model assembly line is able to produce more than one product type at the same time. Mixed model assembly line can adapt to the varied small size batch production, not keep the inventory to the work in process through verity of product and can quickly response to the abrupt change of demand. Due to the mentioned attributes of mixed model assembly line, waiting/ accumulations in the work stationary. For solving this problem, the production smoothing model are presented. The smoothing production aims to reduce the size of batch and flow as a unique products/ parts/ raw materials throughout the whole system. 

 In this study, the solution of models that response to demand for certain time at “just in time” according to the JIT approach and “no stock” according to the Lean philosophy in mixed model assemble line in automotive firm. The problem is handled for 50 product with two approach as scheduling and sequencing. In scheduling stage, three solving methods are presented and alternative solutions are obtained for balanced production desired from firm and considering constraints. This solutions are compared with several criteria. In sequencing stage, the work sequence of automobile models in assemble line is determined with modified Goal Chasing method.

Keywords

References

  1. Chakravarty, A. K. and Shtub A., (1985)“New Technology Production Systems”, Decision Science, vol. 16(3), 248-264. Multistage Dar-El,
  2. E. M. And Cother R.F., (1975)
  3. “Assembly Line Sequencing for Model
  4. mix”, International Journal of Production
  5. Research, 13, 463-477.
  6. Dar-El, E. M. and Rabinovitch M., (1988) Planning and “Optimal Assembly Lines”, International Journal of Production Research, vol.26, 1433-1450.
  7. Dar-El E. M., and Cucuy, (1977). “Optimal Mixed Model Sequencing for Balanced Assembly Lines”, Omega, vol.5, 333-342.
  8. Emde, S. and Boysen N., (2012). “Optimally Routing and Scheduling Tow Trains for JIT- Supply of Mixed-Model Assembly Lines”, European Journal of Operational Research, vol. 217, 287–299.

Details

Primary Language

turkce

Subjects

-

Journal Section

-

Authors

Havva Karabulut This is me

Publication Date

August 24, 2015

Submission Date

April 14, 2014

Acceptance Date

-

Published in Issue

Year 2015 Volume: 16 Number: 1

APA
Karabulut, H., & Erginel, N. (2015). KARMA MODELLİ MONTAJ HATLARINDA ÜRETİM ÇİZELGELEME VE SIRALAMA PROBLEMLERİNDE ÜRETİM DÜZGÜNLEŞTİRME YAKLAŞIMLARI. Anadolu University Journal of Science and Technology A - Applied Sciences and Engineering, 16(1), 1-14. https://doi.org/10.18038/btd-a.51034
AMA
1.Karabulut H, Erginel N. KARMA MODELLİ MONTAJ HATLARINDA ÜRETİM ÇİZELGELEME VE SIRALAMA PROBLEMLERİNDE ÜRETİM DÜZGÜNLEŞTİRME YAKLAŞIMLARI. AUJST-A. 2015;16(1):1-14. doi:10.18038/btd-a.51034
Chicago
Karabulut, Havva, and Nihal Erginel. 2015. “KARMA MODELLİ MONTAJ HATLARINDA ÜRETİM ÇİZELGELEME VE SIRALAMA PROBLEMLERİNDE ÜRETİM DÜZGÜNLEŞTİRME YAKLAŞIMLARI”. Anadolu University Journal of Science and Technology A - Applied Sciences and Engineering 16 (1): 1-14. https://doi.org/10.18038/btd-a.51034.
EndNote
Karabulut H, Erginel N (August 1, 2015) KARMA MODELLİ MONTAJ HATLARINDA ÜRETİM ÇİZELGELEME VE SIRALAMA PROBLEMLERİNDE ÜRETİM DÜZGÜNLEŞTİRME YAKLAŞIMLARI. Anadolu University Journal of Science and Technology A - Applied Sciences and Engineering 16 1 1–14.
IEEE
[1]H. Karabulut and N. Erginel, “KARMA MODELLİ MONTAJ HATLARINDA ÜRETİM ÇİZELGELEME VE SIRALAMA PROBLEMLERİNDE ÜRETİM DÜZGÜNLEŞTİRME YAKLAŞIMLARI”, AUJST-A, vol. 16, no. 1, pp. 1–14, Aug. 2015, doi: 10.18038/btd-a.51034.
ISNAD
Karabulut, Havva - Erginel, Nihal. “KARMA MODELLİ MONTAJ HATLARINDA ÜRETİM ÇİZELGELEME VE SIRALAMA PROBLEMLERİNDE ÜRETİM DÜZGÜNLEŞTİRME YAKLAŞIMLARI”. Anadolu University Journal of Science and Technology A - Applied Sciences and Engineering 16/1 (August 1, 2015): 1-14. https://doi.org/10.18038/btd-a.51034.
JAMA
1.Karabulut H, Erginel N. KARMA MODELLİ MONTAJ HATLARINDA ÜRETİM ÇİZELGELEME VE SIRALAMA PROBLEMLERİNDE ÜRETİM DÜZGÜNLEŞTİRME YAKLAŞIMLARI. AUJST-A. 2015;16:1–14.
MLA
Karabulut, Havva, and Nihal Erginel. “KARMA MODELLİ MONTAJ HATLARINDA ÜRETİM ÇİZELGELEME VE SIRALAMA PROBLEMLERİNDE ÜRETİM DÜZGÜNLEŞTİRME YAKLAŞIMLARI”. Anadolu University Journal of Science and Technology A - Applied Sciences and Engineering, vol. 16, no. 1, Aug. 2015, pp. 1-14, doi:10.18038/btd-a.51034.
Vancouver
1.Havva Karabulut, Nihal Erginel. KARMA MODELLİ MONTAJ HATLARINDA ÜRETİM ÇİZELGELEME VE SIRALAMA PROBLEMLERİNDE ÜRETİM DÜZGÜNLEŞTİRME YAKLAŞIMLARI. AUJST-A. 2015 Aug. 1;16(1):1-14. doi:10.18038/btd-a.51034

Cited By