Most of the studies dealing with the production scheduling problems has
focused on single criterion. However, real-world manufacturing systems require the simultaneous
optimization of different criteria. In this study, we consider permutation flowshop
scheduling problem with the multiobjectives of minimizing makespan, total flowtime and
maximum tardiness simultaneously. Three-stage simulated annealing algorithm is proposed
to obtain efficient solutions. The proposed algorithm has obtained efficient solutions
in a reasonable computation time.
Multi-criteria scheduling flow shop scheduling simulated annealing efficient solution