Turkish public procurement law
and secondary regulations describes tender evaluation in detail. In this
system, bidders’ capabilities on each qualification criteria are evaluated
either as satisfied or not satisfied. This method is criticized as incomplete
and lacking consideration in terms of the contractor’s ability to achieve
simultaneously, time, cost, quality and safety standards. In this study, as a
first step in tender evaluation, each qualification criteria is put into tender
evaluation making tender evaluation a multi criteria decision making problem
and group AHP method is used to identify the weights of qualification criteria
already in use.
Primary Language | English |
---|---|
Subjects | Engineering |
Journal Section | Civil Engineering |
Authors | |
Publication Date | June 1, 2018 |
Published in Issue | Year 2018 Volume: 31 Issue: 2 |