Investigating the causes of delay and cost-overrun in construction industry

Volume: 2 Number: 2 August 15, 2018
EN

Investigating the causes of delay and cost-overrun in construction industry

Abstract

For a construction project to be successfully completed, project objectives must be met within a specified time and budget. ‘Delay’ and ‘cost-overrun’ in the construction projects are two significant defects, as they can negatively affect projects by disputes among stakeholders, work quality and safety level in the project. Hence, it is crucial to have further investigation on these especially in regions where less considered. To overcome such problems and inconsistencies in the construction industry of Northern Iraq, major factors and causes of delay and cost overrun were investigated in a considerable number of construction companies in the region. Sixty-one delay factors and forty-two cost overrun factors were considered in the study. A questionnaire survey was administered, and a quantitative analysis was conducted by SPSS. Major delay and cost overrun factors were determined and the three major causes of delays were found as “security measures”, “high number of sub-contracts by the same contractor”, and “poor labor productivity”. Similarly, three major factors causing cost-overrun were “inadequate labor and skill availability”, “inappropriate contractor policies”, and “domination of construction industry by foreign firm and aids”. It was also found that the majority of problems are raised by owners and contractors. An improvement framework was finally proposed based on findings.

Keywords

References

  1. 1. Alaghbari, W., Kadir, M. R. A., Salim, A., and Ernawati, The Significant Factors Causing Delay of Building Construction Projects in Malaysia, Engineering, Construction and Architectural Management, 2007, 14(2): p. 192-206.
  2. 2. Mohammed, F. H., Causes of Delays in Construction Projects in Kurdistan Region of Iraq, 2015, Master thesis, Portsmouth, University of Portsmouth. England: University of Portsmouth.
  3. 3. Jahanger, K. Q., Important Causes of Delay in Construction Projects in Baghdad City, Australian Journal of Basic and Applied Sciences, 2013, 7(4), p. 14-23.
  4. 4. Bakr, G. A., Causes of Delay in Public Construction Projects in Iraq, Jordan Journal of Civil Engineering, 2015, 9(2), p. 149-162.
  5. 5. Singh, R., Delays and Cost Overruns in Infrastructure Projects: Extents, Causes and Remedies, Economic and Political Weekly, 2009, 45(21), p. 43-54.
  6. 6. Love, P. E. D., Wang, X., Sing, C. P., and Tiong, R. L. K., Determining the Probability of Project Cost Overruns, Journal of Construction Engineering and Management, 2012, 1(1), p. 438-438.
  7. 7. Koushki, P.A., Al‐Rashid, K., and Kartam, N., Delays and Cost Increases in the Construction of Private Residential Projects in Kuwait, Construction Management and Economics, 2005, 23(3), p. 285-294.
  8. 8. Al-Agele H. K., and Al-Hassan, A. J., The Reasons of Costs Deviation in the Iraqi Construction Projects - Field Assessment, Applied Research Journal, 2016, 2(5), p. 228-237.

Details

Primary Language

English

Subjects

-

Journal Section

Research Article

Authors

Alireza Rezaei *
ULUSLARARASI KIBRIS ÜNİVERSİTESİ
0000-0001-5883-4321
Türkiye

Saeed Jalal This is me
ULUSLARARASI KIBRIS ÜNİVERSİTESİ
Türkiye

Publication Date

August 15, 2018

Submission Date

January 19, 2018

Acceptance Date

April 15, 2018

Published in Issue

Year 2018 Volume: 2 Number: 2

APA
Rezaei, A., & Jalal, S. (2018). Investigating the causes of delay and cost-overrun in construction industry. International Advanced Researches and Engineering Journal, 2(2), 75-79. https://izlik.org/JA22XX66NS
AMA
1.Rezaei A, Jalal S. Investigating the causes of delay and cost-overrun in construction industry. Int. Adv. Res. Eng. J. 2018;2(2):75-79. https://izlik.org/JA22XX66NS
Chicago
Rezaei, Alireza, and Saeed Jalal. 2018. “Investigating the Causes of Delay and Cost-Overrun in Construction Industry”. International Advanced Researches and Engineering Journal 2 (2): 75-79. https://izlik.org/JA22XX66NS.
EndNote
Rezaei A, Jalal S (August 1, 2018) Investigating the causes of delay and cost-overrun in construction industry. International Advanced Researches and Engineering Journal 2 2 75–79.
IEEE
[1]A. Rezaei and S. Jalal, “Investigating the causes of delay and cost-overrun in construction industry”, Int. Adv. Res. Eng. J., vol. 2, no. 2, pp. 75–79, Aug. 2018, [Online]. Available: https://izlik.org/JA22XX66NS
ISNAD
Rezaei, Alireza - Jalal, Saeed. “Investigating the Causes of Delay and Cost-Overrun in Construction Industry”. International Advanced Researches and Engineering Journal 2/2 (August 1, 2018): 75-79. https://izlik.org/JA22XX66NS.
JAMA
1.Rezaei A, Jalal S. Investigating the causes of delay and cost-overrun in construction industry. Int. Adv. Res. Eng. J. 2018;2:75–79.
MLA
Rezaei, Alireza, and Saeed Jalal. “Investigating the Causes of Delay and Cost-Overrun in Construction Industry”. International Advanced Researches and Engineering Journal, vol. 2, no. 2, Aug. 2018, pp. 75-79, https://izlik.org/JA22XX66NS.
Vancouver
1.Alireza Rezaei, Saeed Jalal. Investigating the causes of delay and cost-overrun in construction industry. Int. Adv. Res. Eng. J. [Internet]. 2018 Aug. 1;2(2):75-9. Available from: https://izlik.org/JA22XX66NS



Creative Commons License

Any further distribution of this work must maintain attribution to the author(s) and the title of the work, journal citation and DOI.