Research Article

An approach to preparing a bill of quantities

Volume: 2 Number: 3 December 15, 2018
EN

An approach to preparing a bill of quantities

Abstract

At the pre-design stage, it is essential for designers and property owners to have a rough idea regarding the material quantities necessary for construction as well as the building cost. To know these  approximate  values  is  of  great  importance  in  terms  of  the  correct  establishment  of  the financial model at the pre-design stage, the elimination of cash flow problems and the prevention of loss of national wealth. While calculating these values, approximate unit costs announced by the Ministry of Public Works and Settlement are used. In Turkey, the cost estimate at the pre- design stage is obtained by multiplying the total building construction area by the unit construction cost. However, it is generally accepted that this value is high in terms of free market costs. The purpose of this study is to prepare a program that can calculate approximate construction cost with unit workmanship prices in a specific region and approximate quantities including the minimum and maximum values of the material values by entering simple information about a planned RC building. Accurate cost estimation at the pre-design stage is proportional to the accuracy of the material metering ratios. The coefficients taken into account in this study have been checked and calibrated with a large number of projects, and it was observed that the samples containing the preliminary results of the study were compatible with the application project results. 

Keywords

References

  1. 1. Birecikli, B.M., Yapı Metrajı ve Maliyeti. Eylül 2016, Türkiye: Birsen Yayınevi. p.535. in Turkish
  2. 2. Onur, L.U. and U.N. Baykan, Yapı maliyetinin fonksiyonel eleman yöntemi ile tahmini. e-Journal of New World Sciences Academy, 2009. 4(4): p. 449-458.
  3. 3. Bayram, S., M.E. Öcal, E. Laptalı Oral, ve C.D. Atış, Yapım maliyeti tahmininde birim fiyat yöntemi – yapı yaklaşık maliyetleri kıyaslaması, Politeknik Dergisi, 2016. 19(2): p. 175-183. in Turkish
  4. 4. Polat D.A. ve M. Çıracı, Türkiye’de tasarım öncesinde maliyet tahmini için veri tabanı modeli. İtüdergisi Mimarlık Planlama Tasarım, Eylül 2005. 4(2): p. 59-69. in Turkish
  5. 5. İMO, [cited 2017 30 August]; Available from: http://bursa.imo.org.tr/resimler/dosya_ekler/e4e313a1f589c72_ek.pdf?tipi=84&turu=X&sube=0
  6. 6. Resmi Gazete, [cited 2017 30 August]; Available from: http://www.resmigazete.gov.tr/eskiler/2016/04/20160409-22.htm. in Turkish
  7. 7. Türk, K., [cited 2017 30 August]; Available from: http://eng.harran.edu.tr/moodle/moodledata/53/Ders_Notu/Yapi_Planlama_ve_Organizasyonu.pdf. in Turkish
  8. 8. Anonim, [cited 2017 30 August]; Available from: http://www.yapi.com.tr/urunhaberleri/com-otomatikmetraj-cozumleri-ile-metraj-hesabi-1-guneiniyor_133264.html. in Turkish

Details

Primary Language

English

Subjects

-

Journal Section

Research Article

Authors

Süleyman Göçer This is me

Publication Date

December 15, 2018

Submission Date

March 19, 2018

Acceptance Date

May 23, 2018

Published in Issue

Year 2018 Volume: 2 Number: 3

APA
Bikçe, M., & Göçer, S. (2018). An approach to preparing a bill of quantities. International Advanced Researches and Engineering Journal, 2(3), 229-233. https://izlik.org/JA78DC55CS
AMA
1.Bikçe M, Göçer S. An approach to preparing a bill of quantities. Int. Adv. Res. Eng. J. 2018;2(3):229-233. https://izlik.org/JA78DC55CS
Chicago
Bikçe, Murat, and Süleyman Göçer. 2018. “An Approach to Preparing a Bill of Quantities”. International Advanced Researches and Engineering Journal 2 (3): 229-33. https://izlik.org/JA78DC55CS.
EndNote
Bikçe M, Göçer S (December 1, 2018) An approach to preparing a bill of quantities. International Advanced Researches and Engineering Journal 2 3 229–233.
IEEE
[1]M. Bikçe and S. Göçer, “An approach to preparing a bill of quantities”, Int. Adv. Res. Eng. J., vol. 2, no. 3, pp. 229–233, Dec. 2018, [Online]. Available: https://izlik.org/JA78DC55CS
ISNAD
Bikçe, Murat - Göçer, Süleyman. “An Approach to Preparing a Bill of Quantities”. International Advanced Researches and Engineering Journal 2/3 (December 1, 2018): 229-233. https://izlik.org/JA78DC55CS.
JAMA
1.Bikçe M, Göçer S. An approach to preparing a bill of quantities. Int. Adv. Res. Eng. J. 2018;2:229–233.
MLA
Bikçe, Murat, and Süleyman Göçer. “An Approach to Preparing a Bill of Quantities”. International Advanced Researches and Engineering Journal, vol. 2, no. 3, Dec. 2018, pp. 229-33, https://izlik.org/JA78DC55CS.
Vancouver
1.Murat Bikçe, Süleyman Göçer. An approach to preparing a bill of quantities. Int. Adv. Res. Eng. J. [Internet]. 2018 Dec. 1;2(3):229-33. Available from: https://izlik.org/JA78DC55CS



Creative Commons License

Any further distribution of this work must maintain attribution to the author(s) and the title of the work, journal citation and DOI.