Araştırma Makalesi
BibTex RIS Kaynak Göster

Multi-criteria evaluation model: an application of MRP parameterization

Yıl 2020, Cilt: 8 Sayı: 4, 295 - 301, 31.12.2020
https://doi.org/10.18100/ijamec.817719

Öz

This paper presents a multi-criteria evaluation model applied to the parameterization of the MRP method. Existing optimization approaches that address this problem tend to adopt a means of simulation. A simulated solution is characterized by a pair (parameters, performance indicators). In the context of the evaluation of solutions, the work of Barth, Damand et al. (2003) propose a heuristic approach to extracting knowledge from a solution set. The approach is based on the definition of a multi-criteria solution comparison function. The objective of this paper is to present the detailed modeling of this comparison function. Ultimately, this result contributes to the formalization of a multicriteria optimization problem. A problem solving strategy is proposed.

Destekleyen Kurum

University of Strasbourg / HuManis laboratory of EM Strasbourg Business School

Kaynakça

  • Bai, X., J. S. David, J. J. Kanet, S. Cantrell, and J. W. Patterson. 2002. “Schedule Instability, Service Level and Cost in an Material Requirements Planning System.” International Journal of Production Research 40 (7): 1725–1758. doi:10.1080/00207540110119973.
  • Barth, M., D. Damand, and R. De Guio. 2003. “How Can We Ascertain, Understand and Interpret the Performance Level of A Production System? A Visual Method: “The Plan of Preferences”.” Production Planning and Control 14 (3): 233–243. doi:10.1080/0953728031000089997.
  • Blumenthal, A. L. 1977. The Process of Cognition, Prentice-Hall. ISBN 0137229836, 9780137229833.
  • Brans J.P., and P. Vincke. 1985. "A preference ranking organization method: (The PROMETHEE Method for Multiple Criteria Decision-Making)". Management Science 31 (6): 647-656.
  • Brans J.P., P. Vincke, and B. Mareschal. 1986. "How to select and how to rank projects: The PROMETHEE method". European Journal of Operationnal Research 24: 228-238.
  • Chiang, C.-Y., W. T. Lin, and N. C. Suresh. 2016. “An Empirically-Simulated Investigation of the Impact of Demand Forecasting on the Bullwhip Effect: Evidence from U.S. Auto Industry. ”International Journal of Production Economics 177 (1): 53–65. doi:10.1016/j.ijpe.2016.04.015.
  • Chu, C. H., and J. C. Hayya. 1988. “Buffering Decisions under MRP Environment: A Review.” Management Science 16 (4): 325–331.
  • Damand, D., R. Derrouiche, and M. Barth. 2013a. “Parameterization of the MRP Method: Automatic Identification and Extraction of Properties.” International Journal of Production Research 51 (18): 233–243. doi:10.1080/00207543.2013.810819.
  • Damand, D., O. Ben Ammar, E. Lepori, and M. Barth. 2013b. “Analysis Method of the Relations between MRP Parameter and Performance Indicator Based on a Literature Review. IFAC MIM 2013, Conference on Manufacturing Modelling, Management and Control, Saint Petersburg.” IFAC Proceedings Volumes 46 (9): 377–382. doi:10.3182/20130619-3-RU-3018.00606.
  • Damand, D., R. Derrouiche, M. Barth, and S. Gamoura. 2019. "Supply chain planning: potential generalization of parameterization rules based on a literature review." Supply Chain Forum: An International Journal 20 (3): 228-245. doi: 10.1080/16258312.2019.1589892.
  • Dolgui, A., and C. Prodhon. 2007. “Supply Planning under Uncertainties in MRP Environments: A State of the Art.”Annual Reviews in Control 31 (2): 269–279. doi:10.1016/j.arcontrol.2007.02.007.
  • Guide, V. D. R., and R. Srivastava. 2000. “A Review of Techniques for Buffering against Uncertainty with MRP Systems.” Production Planning and Control 11 (3): 223–233. doi:10.1080/095372800232199.
  • Koh, S. C., M. H. Jones, S. M. Saad, S. Arunachalam, and A. Gunasekaran. 2000. “Measuring Uncertainties in MRP Environments.” International Journal of Logistics Information Management 13 (3): 177–183. doi:10.1108/09576050010326574.
  • Koh, S. C. L., S. M. Saad, and M. H. Joness. 2002. “Uncertainty under MRP-planned Manufacture: Review and Categorization.” International Journal of Production Research 40 (10): 2399–2421. doi:10.1080/00207540210136487.
  • Pergher, I., and A. Teixeira de Almeida. 2017. “A Multi-Attribute Decision Model for Setting Production Planning Parameters.” Journal of Manufacturing Systems 42: 224–232. doi:10.1016/j.jmsy.2016.12.012.
  • Lee, T. S., E. Everett, and J. R. Adam. 1986. “Forecasting Error Evaluation in Material Requirements Planning (MRP) Production Inventory Systems.” Management Science 32 (9): 1186–1205. doi:10.1287/mnsc.32.9.1186.
  • Murthy, D. N. P., and L. Ma. 1991. “MRP with Uncertainty: A Review and Some Extensions.” International Journal of Production Economics 25 (1–3): 51–64. doi:10.1016/0925-5273(91)90130-L.
  • Roy, B. 1996. Multicriteria methodology for decision aiding. Boston: Springer. Doi 10.1007/978-1-4757-2500-1.
  • Sahin, F., P. Robinson, and A. Narayanan. 2013. “Rolling Horizon Planning in Supply Chains: Review, Implications and Directions for Future Research.” International Journal of Production Research 51 (18): 5413–5436. doi:10.1080/00207543.2013.775523.
  • Sridharan, V., and W. L. Berry. 1990. “Master Production Scheduling Make-To-Stock Products: A Framework for Analysis.” International Journal of Production Research 28 (3): 541–558. doi:10.1080/00207549008942735.
  • Xie, J., T. S. Lee, and X. Zhao. 2004. “Impact of Forecasting Error on the Performance of Capacited Multi-Item Production Systems.” Computers & Engineering 46 (2): 205–219.
  • Yeung, J. H. Y., W. C. K. Wong, and L. Ma. 2000. “Parameters Affecting the Effectiveness of MRP Systems: A Review.” International Journal of Production Research 36 (2): 313–331. doi:10.1080/002075498193750.
Yıl 2020, Cilt: 8 Sayı: 4, 295 - 301, 31.12.2020
https://doi.org/10.18100/ijamec.817719

Öz

Kaynakça

  • Bai, X., J. S. David, J. J. Kanet, S. Cantrell, and J. W. Patterson. 2002. “Schedule Instability, Service Level and Cost in an Material Requirements Planning System.” International Journal of Production Research 40 (7): 1725–1758. doi:10.1080/00207540110119973.
  • Barth, M., D. Damand, and R. De Guio. 2003. “How Can We Ascertain, Understand and Interpret the Performance Level of A Production System? A Visual Method: “The Plan of Preferences”.” Production Planning and Control 14 (3): 233–243. doi:10.1080/0953728031000089997.
  • Blumenthal, A. L. 1977. The Process of Cognition, Prentice-Hall. ISBN 0137229836, 9780137229833.
  • Brans J.P., and P. Vincke. 1985. "A preference ranking organization method: (The PROMETHEE Method for Multiple Criteria Decision-Making)". Management Science 31 (6): 647-656.
  • Brans J.P., P. Vincke, and B. Mareschal. 1986. "How to select and how to rank projects: The PROMETHEE method". European Journal of Operationnal Research 24: 228-238.
  • Chiang, C.-Y., W. T. Lin, and N. C. Suresh. 2016. “An Empirically-Simulated Investigation of the Impact of Demand Forecasting on the Bullwhip Effect: Evidence from U.S. Auto Industry. ”International Journal of Production Economics 177 (1): 53–65. doi:10.1016/j.ijpe.2016.04.015.
  • Chu, C. H., and J. C. Hayya. 1988. “Buffering Decisions under MRP Environment: A Review.” Management Science 16 (4): 325–331.
  • Damand, D., R. Derrouiche, and M. Barth. 2013a. “Parameterization of the MRP Method: Automatic Identification and Extraction of Properties.” International Journal of Production Research 51 (18): 233–243. doi:10.1080/00207543.2013.810819.
  • Damand, D., O. Ben Ammar, E. Lepori, and M. Barth. 2013b. “Analysis Method of the Relations between MRP Parameter and Performance Indicator Based on a Literature Review. IFAC MIM 2013, Conference on Manufacturing Modelling, Management and Control, Saint Petersburg.” IFAC Proceedings Volumes 46 (9): 377–382. doi:10.3182/20130619-3-RU-3018.00606.
  • Damand, D., R. Derrouiche, M. Barth, and S. Gamoura. 2019. "Supply chain planning: potential generalization of parameterization rules based on a literature review." Supply Chain Forum: An International Journal 20 (3): 228-245. doi: 10.1080/16258312.2019.1589892.
  • Dolgui, A., and C. Prodhon. 2007. “Supply Planning under Uncertainties in MRP Environments: A State of the Art.”Annual Reviews in Control 31 (2): 269–279. doi:10.1016/j.arcontrol.2007.02.007.
  • Guide, V. D. R., and R. Srivastava. 2000. “A Review of Techniques for Buffering against Uncertainty with MRP Systems.” Production Planning and Control 11 (3): 223–233. doi:10.1080/095372800232199.
  • Koh, S. C., M. H. Jones, S. M. Saad, S. Arunachalam, and A. Gunasekaran. 2000. “Measuring Uncertainties in MRP Environments.” International Journal of Logistics Information Management 13 (3): 177–183. doi:10.1108/09576050010326574.
  • Koh, S. C. L., S. M. Saad, and M. H. Joness. 2002. “Uncertainty under MRP-planned Manufacture: Review and Categorization.” International Journal of Production Research 40 (10): 2399–2421. doi:10.1080/00207540210136487.
  • Pergher, I., and A. Teixeira de Almeida. 2017. “A Multi-Attribute Decision Model for Setting Production Planning Parameters.” Journal of Manufacturing Systems 42: 224–232. doi:10.1016/j.jmsy.2016.12.012.
  • Lee, T. S., E. Everett, and J. R. Adam. 1986. “Forecasting Error Evaluation in Material Requirements Planning (MRP) Production Inventory Systems.” Management Science 32 (9): 1186–1205. doi:10.1287/mnsc.32.9.1186.
  • Murthy, D. N. P., and L. Ma. 1991. “MRP with Uncertainty: A Review and Some Extensions.” International Journal of Production Economics 25 (1–3): 51–64. doi:10.1016/0925-5273(91)90130-L.
  • Roy, B. 1996. Multicriteria methodology for decision aiding. Boston: Springer. Doi 10.1007/978-1-4757-2500-1.
  • Sahin, F., P. Robinson, and A. Narayanan. 2013. “Rolling Horizon Planning in Supply Chains: Review, Implications and Directions for Future Research.” International Journal of Production Research 51 (18): 5413–5436. doi:10.1080/00207543.2013.775523.
  • Sridharan, V., and W. L. Berry. 1990. “Master Production Scheduling Make-To-Stock Products: A Framework for Analysis.” International Journal of Production Research 28 (3): 541–558. doi:10.1080/00207549008942735.
  • Xie, J., T. S. Lee, and X. Zhao. 2004. “Impact of Forecasting Error on the Performance of Capacited Multi-Item Production Systems.” Computers & Engineering 46 (2): 205–219.
  • Yeung, J. H. Y., W. C. K. Wong, and L. Ma. 2000. “Parameters Affecting the Effectiveness of MRP Systems: A Review.” International Journal of Production Research 36 (2): 313–331. doi:10.1080/002075498193750.
Toplam 22 adet kaynakça vardır.

Ayrıntılar

Birincil Dil İngilizce
Konular Mühendislik
Bölüm Research Article
Yazarlar

David Damand 0000-0002-6187-2115

Yayımlanma Tarihi 31 Aralık 2020
Yayımlandığı Sayı Yıl 2020 Cilt: 8 Sayı: 4

Kaynak Göster

APA Damand, D. (2020). Multi-criteria evaluation model: an application of MRP parameterization. International Journal of Applied Mathematics Electronics and Computers, 8(4), 295-301. https://doi.org/10.18100/ijamec.817719
AMA Damand D. Multi-criteria evaluation model: an application of MRP parameterization. International Journal of Applied Mathematics Electronics and Computers. Aralık 2020;8(4):295-301. doi:10.18100/ijamec.817719
Chicago Damand, David. “Multi-Criteria Evaluation Model: An Application of MRP Parameterization”. International Journal of Applied Mathematics Electronics and Computers 8, sy. 4 (Aralık 2020): 295-301. https://doi.org/10.18100/ijamec.817719.
EndNote Damand D (01 Aralık 2020) Multi-criteria evaluation model: an application of MRP parameterization. International Journal of Applied Mathematics Electronics and Computers 8 4 295–301.
IEEE D. Damand, “Multi-criteria evaluation model: an application of MRP parameterization”, International Journal of Applied Mathematics Electronics and Computers, c. 8, sy. 4, ss. 295–301, 2020, doi: 10.18100/ijamec.817719.
ISNAD Damand, David. “Multi-Criteria Evaluation Model: An Application of MRP Parameterization”. International Journal of Applied Mathematics Electronics and Computers 8/4 (Aralık 2020), 295-301. https://doi.org/10.18100/ijamec.817719.
JAMA Damand D. Multi-criteria evaluation model: an application of MRP parameterization. International Journal of Applied Mathematics Electronics and Computers. 2020;8:295–301.
MLA Damand, David. “Multi-Criteria Evaluation Model: An Application of MRP Parameterization”. International Journal of Applied Mathematics Electronics and Computers, c. 8, sy. 4, 2020, ss. 295-01, doi:10.18100/ijamec.817719.
Vancouver Damand D. Multi-criteria evaluation model: an application of MRP parameterization. International Journal of Applied Mathematics Electronics and Computers. 2020;8(4):295-301.

Creative Commons License

Address: Selcuk University, Faculty of Technology 42031 Selcuklu, Konya/TURKEY.