BibTex RIS Cite
Year 2012, Volume: 4 Issue: 3, 1 - 16, 01.09.2012

Abstract

References

  • 1. Aviad shapira. M and Marat Goldenberg, (2005), AHP - Based Equipment Selection Model for Construction Projects, Journal of Construction Engineering and Management, Proceedings, ASCE, Vol.131, No. 12, December, PP 1263-1273.
  • 2. Atac Basc, (2003), A Decision Support System for Optimal Equipment Selection in Open pit Mining: Analytical Hierarchy process, Report of Mining Engineering Department, Vol.16, No.2, PP 1-11.
  • 3. Haider. A., Naoum. S., Howes. R. and Tah. J, (1999), Genetic Algorithms Application and Testing for Equipment Selection, Journal of Construction Engineering and Management, Proceedings, ASCE, Vol.125, No. 1, January, PP 32-38.
  • 4. Marat Goldenberg and Aviad Shapira, (2007), Soft Considerations in Equipment for Building Construction Project, Journal of Construction Engineering and Management proceedings, ASCE, Vol.133, No. 10, October, PP 749-760.
  • 5. Sabah Alkass, Mohamed Alhussein, Osama Moselhi, (1997), Computerized Crane Selection for Construction Projects, Journal of Construction Engineering and Management. Association of Researchers in Construction Management, Vol. 2, September, PP 427-36.

GENETIC ALGORITHM AND ANALYTIC HIERARCHY PROCESS BASED EQUIPMENT SELECTION METHOD FOR CONSTRUCTION PROJECT USING MATLAB TOOL:A COMPARTIVE STUDY

Year 2012, Volume: 4 Issue: 3, 1 - 16, 01.09.2012

Abstract

Equipment selection is a key factor in modern construction industry. As it is a complex factor, current models offered by literatures fail to provide adequate solutions for major issues like systematic evaluation of soft factors and weighting of soft benefits in comparison with costs. This paper aims at making a comparative study between GA and AHP by utilising MATLAB as a tool. It is a convenient tool offering an orderly methodical thinking. It guides them in making consistent decisions and provides a facility for all necessary computation

References

  • 1. Aviad shapira. M and Marat Goldenberg, (2005), AHP - Based Equipment Selection Model for Construction Projects, Journal of Construction Engineering and Management, Proceedings, ASCE, Vol.131, No. 12, December, PP 1263-1273.
  • 2. Atac Basc, (2003), A Decision Support System for Optimal Equipment Selection in Open pit Mining: Analytical Hierarchy process, Report of Mining Engineering Department, Vol.16, No.2, PP 1-11.
  • 3. Haider. A., Naoum. S., Howes. R. and Tah. J, (1999), Genetic Algorithms Application and Testing for Equipment Selection, Journal of Construction Engineering and Management, Proceedings, ASCE, Vol.125, No. 1, January, PP 32-38.
  • 4. Marat Goldenberg and Aviad Shapira, (2007), Soft Considerations in Equipment for Building Construction Project, Journal of Construction Engineering and Management proceedings, ASCE, Vol.133, No. 10, October, PP 749-760.
  • 5. Sabah Alkass, Mohamed Alhussein, Osama Moselhi, (1997), Computerized Crane Selection for Construction Projects, Journal of Construction Engineering and Management. Association of Researchers in Construction Management, Vol. 2, September, PP 427-36.
There are 5 citations in total.

Details

Other ID JA66AK92HU
Journal Section Articles
Authors

P. Valli This is me

C. Antony Jeyasehar This is me

Publication Date September 1, 2012
Published in Issue Year 2012 Volume: 4 Issue: 3

Cite

APA Valli, P., & Jeyasehar, C. A. (2012). GENETIC ALGORITHM AND ANALYTIC HIERARCHY PROCESS BASED EQUIPMENT SELECTION METHOD FOR CONSTRUCTION PROJECT USING MATLAB TOOL:A COMPARTIVE STUDY. International Journal of Engineering and Applied Sciences, 4(3), 1-16.
AMA Valli P, Jeyasehar CA. GENETIC ALGORITHM AND ANALYTIC HIERARCHY PROCESS BASED EQUIPMENT SELECTION METHOD FOR CONSTRUCTION PROJECT USING MATLAB TOOL:A COMPARTIVE STUDY. IJEAS. September 2012;4(3):1-16.
Chicago Valli, P., and C. Antony Jeyasehar. “GENETIC ALGORITHM AND ANALYTIC HIERARCHY PROCESS BASED EQUIPMENT SELECTION METHOD FOR CONSTRUCTION PROJECT USING MATLAB TOOL:A COMPARTIVE STUDY”. International Journal of Engineering and Applied Sciences 4, no. 3 (September 2012): 1-16.
EndNote Valli P, Jeyasehar CA (September 1, 2012) GENETIC ALGORITHM AND ANALYTIC HIERARCHY PROCESS BASED EQUIPMENT SELECTION METHOD FOR CONSTRUCTION PROJECT USING MATLAB TOOL:A COMPARTIVE STUDY. International Journal of Engineering and Applied Sciences 4 3 1–16.
IEEE P. Valli and C. A. Jeyasehar, “GENETIC ALGORITHM AND ANALYTIC HIERARCHY PROCESS BASED EQUIPMENT SELECTION METHOD FOR CONSTRUCTION PROJECT USING MATLAB TOOL:A COMPARTIVE STUDY”, IJEAS, vol. 4, no. 3, pp. 1–16, 2012.
ISNAD Valli, P. - Jeyasehar, C. Antony. “GENETIC ALGORITHM AND ANALYTIC HIERARCHY PROCESS BASED EQUIPMENT SELECTION METHOD FOR CONSTRUCTION PROJECT USING MATLAB TOOL:A COMPARTIVE STUDY”. International Journal of Engineering and Applied Sciences 4/3 (September 2012), 1-16.
JAMA Valli P, Jeyasehar CA. GENETIC ALGORITHM AND ANALYTIC HIERARCHY PROCESS BASED EQUIPMENT SELECTION METHOD FOR CONSTRUCTION PROJECT USING MATLAB TOOL:A COMPARTIVE STUDY. IJEAS. 2012;4:1–16.
MLA Valli, P. and C. Antony Jeyasehar. “GENETIC ALGORITHM AND ANALYTIC HIERARCHY PROCESS BASED EQUIPMENT SELECTION METHOD FOR CONSTRUCTION PROJECT USING MATLAB TOOL:A COMPARTIVE STUDY”. International Journal of Engineering and Applied Sciences, vol. 4, no. 3, 2012, pp. 1-16.
Vancouver Valli P, Jeyasehar CA. GENETIC ALGORITHM AND ANALYTIC HIERARCHY PROCESS BASED EQUIPMENT SELECTION METHOD FOR CONSTRUCTION PROJECT USING MATLAB TOOL:A COMPARTIVE STUDY. IJEAS. 2012;4(3):1-16.

21357