Research Article

Integrated Use of BIM and GIS in Rural Resettlement Areas: A Conceptual Framework with Partial Testing

Volume: 13 Number: 2 June 19, 2026

Integrated Use of BIM and GIS in Rural Resettlement Areas: A Conceptual Framework with Partial Testing

Abstract

This study develops a conceptual BIM-GIS integration framework for managing rural resettlement projects and partially tests the framework through the Köpürlü Village resettlement case in Türkiye. Unlike prior studies that mainly address isolated tasks such as data conversion, utility management, or digital-twin visualization, the proposed framework links site selection, planning, infrastructure design, housing production, beneficiary records, entitlement tracking, debt calculation, and post-settlement monitoring within a single information flow. The method is structured around three interoperable layers: (i) a BIM environment for building and quantity information, (ii) a GIS environment for parcels, planning decisions, and spatial analyses, and (iii) an entitlement database that connects beneficiary and cost records through a unique Entitlement_ID. The partial test draws on the administrative records of 169 entitled households and operationalizes 24 representative validation scenarios constructed from the documented entitlement categories, dwelling preferences, and land-allocation conditions observed in the Köpürlü Village dataset. The study does not claim a fully operational digital twin or a completed field implementation; instead, it provides a structured and transferable design logic and a pilot data model for later deployment. The main contribution is the formulation of a domain-specific lifecycle information-management framework for rural resettlement.

Keywords

References

  1. Akindele, O., Ajayi, S., Oyegoke, A., Alaka, H., & Omotayo, T. (2023). Application of geographic information system (GIS) in construction: A systematic review. Smart and Sustainable Built Environment. https://doi.org/10.1108/SASBE-01-2023-0016
  2. Azari, P., Li, S., & Shaker, A. (2025). An effective approach to geometric and semantic BIM/GIS data integration for urban digital twin. ISPRS International Journal of Geo-Information, 14(12), 478. https://doi.org/10.3390/ijgi14120478
  3. Cho, J., Kim, C., Lim, K., Kim, J., Ji, B., & Yeon, J. (2023). Web-based agricultural infrastructure digital twin system integrated with GIS and BIM concepts. Computers and Electronics in Agriculture, 208, 108441. https://doi.org/10.1016/j.compag.2023.108441
  4. Demir, A. Y., & İlal, M. (2021). Loose coupling of GIS and BIM data models for automated compliance checking against zoning codes. Automation in Construction, 128, 103743. https://doi.org/10.1016/j.autcon.2021.103743
  5. Demir, A. Y., & İlal, M. (2022). Integrating building and context information for automated zoning code checking: A review. Journal of Information Technology in Construction, 27, 548–570. https://doi.org/10.36680/j.itcon.2022.027
  6. El Mekawy, M. S. A., Asif, M. U., & Khan, Z. A. (2025). BIM-GIS integration is closer than ever: A unified road model for IFC and CityGML interoperability. International Journal of E-Planning Research, 14(1), 1–27. https://doi.org/10.4018/IJEPR.394240
  7. Güler, D., & Yomralıoğlu, T. (2021). Digitization of processes from building permitting to condominium registration: Current situation analysis and proposal (in Turkish). Journal of Geomatics, 6(2), 93–106. https://doi.org/10.29128/geomatik.705559
  8. Han, C., Tang, F., Ma, T., Gu, L., & Tong, Z. (2022). Construction quality evaluation of asphalt pavement based on BIM and GIS. Automation in Construction, 141, 104398. https://doi.org/10.1016/j.autcon.2022.104398

Details

Primary Language

English

Subjects

Photogrammetry and Remote Sensing

Journal Section

Research Article

Publication Date

June 19, 2026

Submission Date

July 24, 2025

Acceptance Date

March 25, 2026

Published in Issue

Year 2026 Volume: 13 Number: 2

APA
Kocaman, H., & Ülger, M. (2026). Integrated Use of BIM and GIS in Rural Resettlement Areas: A Conceptual Framework with Partial Testing. International Journal of Environment and Geoinformatics, 13(2), 87-98. https://doi.org/10.26650/ijegeo.1750046
AMA
1.Kocaman H, Ülger M. Integrated Use of BIM and GIS in Rural Resettlement Areas: A Conceptual Framework with Partial Testing. IJEGEO. 2026;13(2):87-98. doi:10.26650/ijegeo.1750046
Chicago
Kocaman, Hakkı, and Mehmet Ülger. 2026. “Integrated Use of BIM and GIS in Rural Resettlement Areas: A Conceptual Framework With Partial Testing”. International Journal of Environment and Geoinformatics 13 (2): 87-98. https://doi.org/10.26650/ijegeo.1750046.
EndNote
Kocaman H, Ülger M (June 1, 2026) Integrated Use of BIM and GIS in Rural Resettlement Areas: A Conceptual Framework with Partial Testing. International Journal of Environment and Geoinformatics 13 2 87–98.
IEEE
[1]H. Kocaman and M. Ülger, “Integrated Use of BIM and GIS in Rural Resettlement Areas: A Conceptual Framework with Partial Testing”, IJEGEO, vol. 13, no. 2, pp. 87–98, June 2026, doi: 10.26650/ijegeo.1750046.
ISNAD
Kocaman, Hakkı - Ülger, Mehmet. “Integrated Use of BIM and GIS in Rural Resettlement Areas: A Conceptual Framework With Partial Testing”. International Journal of Environment and Geoinformatics 13/2 (June 1, 2026): 87-98. https://doi.org/10.26650/ijegeo.1750046.
JAMA
1.Kocaman H, Ülger M. Integrated Use of BIM and GIS in Rural Resettlement Areas: A Conceptual Framework with Partial Testing. IJEGEO. 2026;13:87–98.
MLA
Kocaman, Hakkı, and Mehmet Ülger. “Integrated Use of BIM and GIS in Rural Resettlement Areas: A Conceptual Framework With Partial Testing”. International Journal of Environment and Geoinformatics, vol. 13, no. 2, June 2026, pp. 87-98, doi:10.26650/ijegeo.1750046.
Vancouver
1.Hakkı Kocaman, Mehmet Ülger. Integrated Use of BIM and GIS in Rural Resettlement Areas: A Conceptual Framework with Partial Testing. IJEGEO. 2026 Jun. 1;13(2):87-98. doi:10.26650/ijegeo.1750046