According to the 2023 vision determined by
Turkey, which is one of the G20 countries, it aims to evaluate of the hydro
power potential in terms of technical and economic making medium and large
hydro power plants. Turkey's mini and micro hydro power potential isn’t fully
evaluated as a number of countries. In
this context, empirical formula for cost analysis of mini and micro hydro power
plants, which are becoming increasingly important, have been developed in this
work with the aim of facilitating economic analysis. The developed equation is found
by modified Bacterial Swarm Optimization (BSO) algorithm. When analyzed with
the literature data, the obtained equation can calculate the costs with the
least mistakes.
Primary Language | English |
---|---|
Journal Section | Research Article |
Authors | |
Publication Date | December 31, 2017 |
Published in Issue | Year 2017 |
All articles published by IJSSG are licensed under the Creative Commons Attribution 4.0 International License. This permits anyone to copy, redistribute, remix, transmit and adapt the work provided the original work and source is appropriately cited.