In recent years, the competition environment was not as challenging as
it is today, so companies could increase profits by increasing their selling
prices. However, the companies have to reduce costs in order to be able to make
profit in these days due to fact that the globalization has brought competition
environment. The one of the most important way to minimize cost in assembly
lines is to eliminate or minimize non-productive times. Work sampling is one of
the cheapest and the simple method in order to determine the non-productive
times. In this study, work sampling is applied with the REFA (Reichsausschuss Für Arbeitszeitermittlung) standards in a company that assemble construction and agricultural vehicles.
The samples are determined by statistical methods and certain recommendations
are offered to eliminate non-productive times.
Geçmiş yıllarda rekabet
ortamı bugünkü kadar zorlu olmadığından şirketler karlarını satış fiyatlarını
artırarak sağlayabiliyorlardı. Günümüzde küreselleşen ve büyüyen ortam beraberinde
rekabeti getirmiş, bunun neticesinde ise şirketler satış fiyatını artırma
şansları olmadığından kar elde edebilmek amacıyla maliyetlerini düşürme yoluna
başvurmak zorunda kalmışlardır. Montaj hatlarında maliyeti minimize etmenin en
önemli yolu kayıp zamanları tespit ederek, yok etmek veya minimum seviyeye
indirmektir. Kayıp zamanların tespitinde
uygulanabilecek en ucuz, emeği en düşük ve en kısa sürede sonuca ulaşılabilecek
yöntem ise iş örneklemesidir. Bu çalışmada iş ve tarım makinaları montajı yapan
bir işletmede REFA (Reichsausschuss Für Arbeitszeitermittlung) standartları ile
iş örneklemesi uygulaması yapılmıştır. Örneklemeler istatistiksel metotlar ile
belirlenmiş ve kayıp zamanlar için çözüm önerileri getirilmiştir.
Birincil Dil | Türkçe |
---|---|
Konular | Mühendislik |
Bölüm | Makaleler |
Yazarlar | |
Yayımlanma Tarihi | 25 Temmuz 2018 |
Gönderilme Tarihi | 8 Ocak 2018 |
Kabul Tarihi | 2 Mayıs 2018 |
Yayımlandığı Sayı | Yıl 2018 |