The subject of our work is that the contractor is obliged to bring personal performance of the contractor or to do it sub-contracted work in the construction contract.According to clause 471 of the Turkish Code of Obligations, “The contractor is obliged to make the property to be built directly or to have it built under his own administration. However, if the personal characteristics of the contractor do not matter the work is brought to in the construction contract, it can be done to others. “As can be understood from the text of the clause, the work to be brought to the contractor must either directly do it himself or make it to others under his own administration. The obligation of the contractor to bring the work of the contractor himself is an exception to the general rule that debt can be exercised by all in the TBK. m. 83
contract of construction contractor subcontractor personal performance
Çalışmamızın konusu, eser sözleşmesinde yüklenicinin eseri şahsen meydana getirme veya kendi yönetimi altında başkasına yaptırma borcudur. Türk Borçlar Kanunu’nun 471. maddesine göre, “Yüklenici, meydana getirilecek eseri doğrudan doğruya kendisi yapmak veya kendi yönetimi altında yaptırmakla yükümlüdür. Ancak, eserin meydana getirilmesinde yüklenicinin kişisel özellikleri önem taşımıyorsa, işi başkasına da yaptırabilir”. Madde metninden de anlaşılacağı üzere, yüklenici meydana getirilecek eseri ya doğrudan doğruya kendisi yapmak ya da kendi yönetimi altında başkalarına yaptırmak zorundadır. Yüklenicinin eseri bizzat meydana getirme borcu, TBK. m. 83 hükmündeki borcun herkes tarafından ifa edilebileceğine dair genel kuralın bir istisnasıdır.
Birincil Dil | Türkçe |
---|---|
Bölüm | Research Article |
Yazarlar | |
Yayımlanma Tarihi | 1 Eylül 2018 |
Yayımlandığı Sayı | Yıl 2018 Cilt: 5 Sayı: 2 |