The frequency and significance of the primary cause of cost overruns in infrastructure projects
Abstract
Keywords
References
- Flyvbjerg, B., Skamris Holm, M. K., & Buhl, S. L. (2003). How common and how large are cost overruns in transport infrastructure projects?. Transport reviews, 23(1), 71-88. https://doi.org/10.1080/01441640309904
- Wa’el, A., Mohd, R. A., Kadir, A. S., & Ernawati, D. (2007). The significant factors causing delay of building construction projects in Malaysia. Engineering, Construction and Architectural Management, 14(2), 192-206.
- Takim, R. (2005). A framework for successful construction project performance (Doctoral dissertation). Glasgow Caledonian University.
- Yakubu, O. A. (2010). Cost and time control practice of construction projects in the UK: The pursuit of effective management control (Doctoral dissertation). University of the West of England, Bristol.
- Reina, P., & Angelo, W. J. (2002). Megaprojects need more study up front to avoid cost overruns. ENR, 249(3), 11-11.
- Krima, N. (2001). Supervision and delay in implementing construction project: The role of owner's supervisor (Unpublished master's thesis). Department of Engineering Management, El-Fateh University, Tripoli, Libya.
- Smith, N. J., Merna, T., & Jobling, P. (2014). Managing risk in construction projects. John Wiley & Sons.
- The Public Committee of Project Monitoring and Follow-up. (2004). The annual reports of projects following-up. Tripoli, Libya.
Details
Primary Language
English
Subjects
Transportation Engineering
Journal Section
Research Article
Authors
Fares Tarhuni
*
0000-0001-7093-304X
United States
Rupesh Mahat
0000-0001-8695-9236
United States
Publication Date
December 31, 2024
Submission Date
March 16, 2024
Acceptance Date
December 20, 2024
Published in Issue
Year 2024 Volume: 5 Number: 2