A WORKLOAD DEPENDENT RESOURCE CONSTRAINED SCHEDULING PROBLEM FOR NAVY HELICOPTER PILOTS

Volume: 20 Number: 1 June 28, 2024
TR EN

A WORKLOAD DEPENDENT RESOURCE CONSTRAINED SCHEDULING PROBLEM FOR NAVY HELICOPTER PILOTS

Abstract

In this paper, we consider a problem inspired by a real-life problem, which aims to schedule high multiplicity jobs on a single machine by taking into account the organization-specific constraints in a different schedule structure. The schedule is daily with daytime and nighttime periods. The operator is considered as an additional resource that varies in terms of consumption and scheduling depending on the period. There are specific rest periods before and after night-period jobs, and night-period jobs affect both the daily working time and number of the jobs in the daytime- period. In addition, the operator's daily workload is divided into two categories: normal and heavy. If the workload is heavy on consecutive days, specific rest periods must be scheduled. The integer programming model of the problem is presented. The feasible solutions obtained in a short time with greedy constructive heuristic algorithms are used in the exact solution approach as both upper bound and warm-start point. Finally, the effectiveness of the solution approaches is compared and evaluated through numerical experiments carried out for a variety of problem instances of different sizes.

Keywords

References

  1. Artigues, C., Demassey, S. & Neron, E. (2008). Resource Constrained Project Scheduling: Models, Algorithms, Extensions and Applications. France, John Wiley & Sons.
  2. Barnhart, C., Cohn, A.M., Johnson, E.L., Klabjan, D., Nemhauser, G.L. & Vance, P.H. (2003). Airline Crew Scheduling. In: Hall, R.W. (eds) Handbook of Transportation Science. International Series in Operations Research & Management Science, Vol 56. Springer, Boston, MA. doi:10.1007/0-306-48058-1_14.
  3. Bergh, J.V., Beliën, J., Bruecker P., Demeulemeester, E. & Boeck, L. (2013). “Personnel scheduling: A literature review”. European Journal of Operational Research, Vol. 226, pp. 367–385. doi:10.1016/j.ejor.2012.11.029.
  4. Brucker, P., Drexl, A., Möhring, R., Neumann, K. & Pesch, E. (1999). “Resource-constrained project scheduling: Notation, classification, models, and methods”. European Journal of Operational Research, Vol. 112, pp. 3-41. doi:10.1016/S0377-2217(98)00204-5.
  5. Brucker, P., Qu, R., & Burke, E. (2011). “Personnel scheduling: Models and complexity”. European Journal of Operational Research, Vol. 210, pp. 467-473. doi:10.1016/j.ejor.2010.11.017.
  6. Burke, E. K., De Causmaecker, P., Berghe, G. V. & Van Landeghem, H. (2004). “The state of the art of nurse rostering”. Journal of Scheduling, Vol. 7, pp. 441-499. doi: 10.1023/B:JOSH.0000046076.75950.0b.
  7. Dantzig, G.B. (1954). “Letter to the Editor---A Comment on Edie’s ‘Traffic Delays at Toll Booths’”. Journal of the Operations Research Society of America, Vol. 2, No. 3, pp. 339-341. doi:10.1287/opre.2.3.339.
  8. Ernst, A.T., Jiang, H., Krishnamoorthy, M. & Sier, D. (2004). “Staff scheduling and rostering: a review of applications, methods and models”. European Journal of Operational Research, Vol. 153, pp. 3-27.

Details

Primary Language

English

Subjects

Industrial Engineering

Journal Section

Research Article

Publication Date

June 28, 2024

Submission Date

April 5, 2024

Acceptance Date

May 29, 2024

Published in Issue

Year 2024 Volume: 20 Number: 1

APA
Çelik, F., & Güner, E. (2024). A WORKLOAD DEPENDENT RESOURCE CONSTRAINED SCHEDULING PROBLEM FOR NAVY HELICOPTER PILOTS. Journal of Naval Sciences and Engineering, 20(1), 67-90. https://doi.org/10.56850/jnse.1465463
AMA
1.Çelik F, Güner E. A WORKLOAD DEPENDENT RESOURCE CONSTRAINED SCHEDULING PROBLEM FOR NAVY HELICOPTER PILOTS. JNSE. 2024;20(1):67-90. doi:10.56850/jnse.1465463
Chicago
Çelik, Fatih, and Ertan Güner. 2024. “A WORKLOAD DEPENDENT RESOURCE CONSTRAINED SCHEDULING PROBLEM FOR NAVY HELICOPTER PILOTS”. Journal of Naval Sciences and Engineering 20 (1): 67-90. https://doi.org/10.56850/jnse.1465463.
EndNote
Çelik F, Güner E (June 1, 2024) A WORKLOAD DEPENDENT RESOURCE CONSTRAINED SCHEDULING PROBLEM FOR NAVY HELICOPTER PILOTS. Journal of Naval Sciences and Engineering 20 1 67–90.
IEEE
[1]F. Çelik and E. Güner, “A WORKLOAD DEPENDENT RESOURCE CONSTRAINED SCHEDULING PROBLEM FOR NAVY HELICOPTER PILOTS”, JNSE, vol. 20, no. 1, pp. 67–90, June 2024, doi: 10.56850/jnse.1465463.
ISNAD
Çelik, Fatih - Güner, Ertan. “A WORKLOAD DEPENDENT RESOURCE CONSTRAINED SCHEDULING PROBLEM FOR NAVY HELICOPTER PILOTS”. Journal of Naval Sciences and Engineering 20/1 (June 1, 2024): 67-90. https://doi.org/10.56850/jnse.1465463.
JAMA
1.Çelik F, Güner E. A WORKLOAD DEPENDENT RESOURCE CONSTRAINED SCHEDULING PROBLEM FOR NAVY HELICOPTER PILOTS. JNSE. 2024;20:67–90.
MLA
Çelik, Fatih, and Ertan Güner. “A WORKLOAD DEPENDENT RESOURCE CONSTRAINED SCHEDULING PROBLEM FOR NAVY HELICOPTER PILOTS”. Journal of Naval Sciences and Engineering, vol. 20, no. 1, June 2024, pp. 67-90, doi:10.56850/jnse.1465463.
Vancouver
1.Fatih Çelik, Ertan Güner. A WORKLOAD DEPENDENT RESOURCE CONSTRAINED SCHEDULING PROBLEM FOR NAVY HELICOPTER PILOTS. JNSE. 2024 Jun. 1;20(1):67-90. doi:10.56850/jnse.1465463