A RESEARCH ON PROJECT PERFORMANCE MEASUREMENT BY THE METHOD OF EARNED VALUE ANALYSIS
Abstract
Keywords
References
- Anbari, F. T. (2003). Earned value project management method and extensions. Project Management Journal, 34(4), 12-23.
- Bhosekar, S. K., & Vyas, G. (2012). Cost controlling using earned value analysis in construction industries. International Journal of Engineering and Innovative Technology, 1(4), 324-332.
- Chen, H. L., Chen, W. T., & Lin, Y. L. (2016). Earned value project management: improving the predictive. International Journal of Project Management, 34(1), 22-29.
- Chen, M. T. (2008). The ABCs of earned value application. 2008 AACE International Transactions, 1-9.
- Gupta, R. (2014). Earned value management system. International Journal of Emerging Engineering Research and Technology, 2(4), 160-165.
- Kerzner, H. (2006). Project management: a systems approach to planning, scheduling, and controlling. Hoboken: Jhon Wiley And Sons.
- Navon, R., & Sacks, R. (2007). Assessing research issues in automated project performance control (APPC). Automation in Construction, 4(16), 474-484.
- Taylor, J. (2006). A survival guide for project managers. New York: Amacom.
Details
Primary Language
English
Subjects
Behaviour-Personality Assessment in Psychology
Journal Section
Research Article
Authors
Halil Savas
*
This is me
0000-0001-7942-5527
Türkiye
Zafer Duran
0000-0002-7227-4196
Türkiye
Publication Date
June 30, 2021
Submission Date
March 19, 2021
Acceptance Date
May 29, 2021
Published in Issue
Year 2021 Volume: 8 Number: 2