Araştırma Makalesi
BibTex RIS Kaynak Göster
Yıl 2021, Cilt: 8 Sayı: 2, 62 - 72, 30.06.2021
https://doi.org/10.17261/Pressacademia.2021.1398

Öz

Kaynakça

  • Anbari, F. T. (2003). Earned value project management method and extensions. Project Management Journal, 34(4), 12-23.
  • Bhosekar, S. K., & Vyas, G. (2012). Cost controlling using earned value analysis in construction industries. International Journal of Engineering and Innovative Technology, 1(4), 324-332.
  • Chen, H. L., Chen, W. T., & Lin, Y. L. (2016). Earned value project management: improving the predictive. International Journal of Project Management, 34(1), 22-29.
  • Chen, M. T. (2008). The ABCs of earned value application. 2008 AACE International Transactions, 1-9.
  • Gupta, R. (2014). Earned value management system. International Journal of Emerging Engineering Research and Technology, 2(4), 160-165.
  • Kerzner, H. (2006). Project management: a systems approach to planning, scheduling, and controlling. Hoboken: Jhon Wiley And Sons.
  • Navon, R., & Sacks, R. (2007). Assessing research issues in automated project performance control (APPC). Automation in Construction, 4(16), 474-484.
  • Taylor, J. (2006). A survival guide for project managers. New York: Amacom.
  • Vandevoorde, S., & Vanhoucke, M. (2006). A comparison of different project duration forecasting methods using earned value metrics. International Journal of Project Management, 24(4), 289-302.
  • Zhong, S., & Wang, X. (2011). Improvement and application of earned value analysis in coal. First International Symposium on Mine Safety Science and Engineering. 26, pp. 1983-1989. Beijing: Procedia Engineering

A RESEARCH ON PROJECT PERFORMANCE MEASUREMENT BY THE METHOD OF EARNED VALUE ANALYSIS

Yıl 2021, Cilt: 8 Sayı: 2, 62 - 72, 30.06.2021
https://doi.org/10.17261/Pressacademia.2021.1398

Öz

Purpose - The purpose of this paper is to examine EVA method and to reveal the perspectives of the managers in project-based sectors regarding project management issues and EVA method.
Methodology - Primary data were used in this study. Data was collected through an online survey from 456 participants who manage projects in the business world.
Findings- A significant difference was found between two groups as those who use EVA and those who do not, in terms of the performance criteria of reaching the milestones of the projects on time and completing the projects on time.
Conclusion- In this study, it was seen that EVA offers significant opportunities for project-oriented businesses. However, the fact that the EVA method does not consider the risks and uncertainties is the most serious problem. Studies should be done to solve this problem, and the EVA should be made a more effective method.

Kaynakça

  • Anbari, F. T. (2003). Earned value project management method and extensions. Project Management Journal, 34(4), 12-23.
  • Bhosekar, S. K., & Vyas, G. (2012). Cost controlling using earned value analysis in construction industries. International Journal of Engineering and Innovative Technology, 1(4), 324-332.
  • Chen, H. L., Chen, W. T., & Lin, Y. L. (2016). Earned value project management: improving the predictive. International Journal of Project Management, 34(1), 22-29.
  • Chen, M. T. (2008). The ABCs of earned value application. 2008 AACE International Transactions, 1-9.
  • Gupta, R. (2014). Earned value management system. International Journal of Emerging Engineering Research and Technology, 2(4), 160-165.
  • Kerzner, H. (2006). Project management: a systems approach to planning, scheduling, and controlling. Hoboken: Jhon Wiley And Sons.
  • Navon, R., & Sacks, R. (2007). Assessing research issues in automated project performance control (APPC). Automation in Construction, 4(16), 474-484.
  • Taylor, J. (2006). A survival guide for project managers. New York: Amacom.
  • Vandevoorde, S., & Vanhoucke, M. (2006). A comparison of different project duration forecasting methods using earned value metrics. International Journal of Project Management, 24(4), 289-302.
  • Zhong, S., & Wang, X. (2011). Improvement and application of earned value analysis in coal. First International Symposium on Mine Safety Science and Engineering. 26, pp. 1983-1989. Beijing: Procedia Engineering
Toplam 10 adet kaynakça vardır.

Ayrıntılar

Birincil Dil İngilizce
Konular Psikolojide Davranış-Kişilik Değerlendirmesi
Bölüm Articles
Yazarlar

Halil Savas Bu kişi benim 0000-0001-7942-5527

Zafer Duran 0000-0002-7227-4196

Yayımlanma Tarihi 30 Haziran 2021
Yayımlandığı Sayı Yıl 2021 Cilt: 8 Sayı: 2

Kaynak Göster

APA Savas, H., & Duran, Z. (2021). A RESEARCH ON PROJECT PERFORMANCE MEASUREMENT BY THE METHOD OF EARNED VALUE ANALYSIS. Research Journal of Business and Management, 8(2), 62-72. https://doi.org/10.17261/Pressacademia.2021.1398
AMA Savas H, Duran Z. A RESEARCH ON PROJECT PERFORMANCE MEASUREMENT BY THE METHOD OF EARNED VALUE ANALYSIS. RJBM. Haziran 2021;8(2):62-72. doi:10.17261/Pressacademia.2021.1398
Chicago Savas, Halil, ve Zafer Duran. “A RESEARCH ON PROJECT PERFORMANCE MEASUREMENT BY THE METHOD OF EARNED VALUE ANALYSIS”. Research Journal of Business and Management 8, sy. 2 (Haziran 2021): 62-72. https://doi.org/10.17261/Pressacademia.2021.1398.
EndNote Savas H, Duran Z (01 Haziran 2021) A RESEARCH ON PROJECT PERFORMANCE MEASUREMENT BY THE METHOD OF EARNED VALUE ANALYSIS. Research Journal of Business and Management 8 2 62–72.
IEEE H. Savas ve Z. Duran, “A RESEARCH ON PROJECT PERFORMANCE MEASUREMENT BY THE METHOD OF EARNED VALUE ANALYSIS”, RJBM, c. 8, sy. 2, ss. 62–72, 2021, doi: 10.17261/Pressacademia.2021.1398.
ISNAD Savas, Halil - Duran, Zafer. “A RESEARCH ON PROJECT PERFORMANCE MEASUREMENT BY THE METHOD OF EARNED VALUE ANALYSIS”. Research Journal of Business and Management 8/2 (Haziran 2021), 62-72. https://doi.org/10.17261/Pressacademia.2021.1398.
JAMA Savas H, Duran Z. A RESEARCH ON PROJECT PERFORMANCE MEASUREMENT BY THE METHOD OF EARNED VALUE ANALYSIS. RJBM. 2021;8:62–72.
MLA Savas, Halil ve Zafer Duran. “A RESEARCH ON PROJECT PERFORMANCE MEASUREMENT BY THE METHOD OF EARNED VALUE ANALYSIS”. Research Journal of Business and Management, c. 8, sy. 2, 2021, ss. 62-72, doi:10.17261/Pressacademia.2021.1398.
Vancouver Savas H, Duran Z. A RESEARCH ON PROJECT PERFORMANCE MEASUREMENT BY THE METHOD OF EARNED VALUE ANALYSIS. RJBM. 2021;8(2):62-7.

Research Journal of Business and Management (RJBM) is a scientific, academic, double blind peer-reviewed, quarterly and open-access online journal. The journal publishes four issues a year. The issuing months are March, June, September and December. The publication languages of the Journal are English and Turkish. RJBM aims to provide a research source for all practitioners, policy makers, professionals and researchers working in all related areas of business, management and organizations. The editor in chief of RJBM invites all manuscripts that cover theoretical and/or applied researches on topics related to the interest areas of the Journal. RJBM publishes academic research studies only. RJBM charges no submission or publication fee.

Ethics Policy - RJBM applies the standards of Committee on Publication Ethics (COPE). RJBM is committed to the academic community ensuring ethics and quality of manuscripts in publications. Plagiarism is strictly forbidden and the manuscripts found to be plagiarized will not be accepted or if published will be removed from the publication. Authors must certify that their manuscripts are their original work. Plagiarism, duplicate, data fabrication and redundant publications are forbidden. The manuscripts are subject to plagiarism check by iThenticate or similar. All manuscript submissions must provide a similarity report (up to 15% excluding quotes, bibliography, abstract, method).

Open Access - All research articles published in PressAcademia Journals are fully open access; immediately freely available to read, download and share. Articles are published under the terms of a Creative Commons license which permits use, distribution and reproduction in any medium, provided the original work is properly cited. Open access is a property of individual works, not necessarily journals or publishers. Community standards, rather than copyright law, will continue to provide the mechanism for enforcement of proper attribution and responsible use of the published work, as they do now.