Research Article

Performance estimation of parallel Syste under online and offline preventive maintenance

Volume: 42 Number: 4 August 1, 2024

Performance estimation of parallel Syste under online and offline preventive maintenance

Abstract

In this paper, the reliability characteristics of a parallel system are investigated. The parallel system under consideration is made up of three active units that run in parallel, with two of them having to be operational in order for the system to work. The main purpose of this study is to quantify/examine the effect of online and offline preventive maintenance. Preventive maintenance is carried out on the systems in two ways: online and offline preventive mainte-nance. After the first unit of each system fails, online preventive maintenance is performed. Following the failure of the second unit of each system, offline preventive maintenance is performed. Partial and complete failures are the two types of failures that may occur. Both systems can undergo exponential failure and repair. Using supplementary variable technique, Laplace transform, and Copula repair approach, the system of first-order differential equa-tions associated with system effectiveness, which are crucial to this research, is established and resolved. Tables and graphs are used to illustrate the important findings based on assumed numerical values. System designers, programmers, and maintenance supervisors will be able to create and maintain more crucial systems with the assistance of this research paper.

Keywords

References

  1. REFERENCES
  2. [1] Niwas R, Garg H. An approach for analyzing the reliability and profit of an industrial system based on the cost-free warranty policy. J Braz Soc Mech Sci Eng 2018;40:265. [CrossRef]
  3. [2] Gahlot M, Singh VV, Ayagi HI, Goel CK. Performance assessment of repairable system in series configuration under different types of failure and repair policies using copula linguistics. Int J Reliab Saf 2018;12:348–363. [CrossRef]
  4. [3] Garg H. An approach for analyzing the reliability of industrial system using fuzzy Kolmogrov’s differential equations. Arab J Sci Eng 2016a;40:975–987. [CrossRef]
  5. [4] Garg H. A novel approach for analyzing the reliability of series-parallel system using credibility theory and different types of intuitionistic fuzzy numbers. J Braz Soc Mech Sci Eng 2016a;38:1021–1035. [CrossRef]
  6. [5] Singh VV, Ayagi HI. Stochastic analysis of a complex system under preemptive resume repair policy using Gumbel-Hougaard family of copula. Int J Math Oper 2018;12:273–292. [CrossRef]
  7. [6] Bala, SI, Yusuf I. Markov chain profit modeling and evaluation between two dissimilar systems under two forms of failures. Appl Appl Math 2016;11:489503.
  8. [7] Sanusi A, Yusuf I, Mamuda BY. Performance evaluation of an industrial configured as series-parallel system. J Math Comput Sci 2020;10:692712.

Details

Primary Language

English

Subjects

Biochemistry and Cell Biology (Other)

Journal Section

Research Article

Publication Date

August 1, 2024

Submission Date

October 24, 2022

Acceptance Date

February 14, 2023

Published in Issue

Year 2024 Volume: 42 Number: 4

APA
Ayagi, H. I., Wan, Z., Yusuf, İ., & Sanusi, A. (2024). Performance estimation of parallel Syste under online and offline preventive maintenance. Sigma Journal of Engineering and Natural Sciences, 42(4), 1088-1100. https://izlik.org/JA82GP48SM
AMA
1.Ayagi HI, Wan Z, Yusuf İ, Sanusi A. Performance estimation of parallel Syste under online and offline preventive maintenance. SIGMA. 2024;42(4):1088-1100. https://izlik.org/JA82GP48SM
Chicago
Ayagi, Hamisu Ismail, Zhong Wan, İbrahim Yusuf, and Abdullahi Sanusi. 2024. “Performance Estimation of Parallel Syste under Online and Offline Preventive Maintenance”. Sigma Journal of Engineering and Natural Sciences 42 (4): 1088-1100. https://izlik.org/JA82GP48SM.
EndNote
Ayagi HI, Wan Z, Yusuf İ, Sanusi A (August 1, 2024) Performance estimation of parallel Syste under online and offline preventive maintenance. Sigma Journal of Engineering and Natural Sciences 42 4 1088–1100.
IEEE
[1]H. I. Ayagi, Z. Wan, İ. Yusuf, and A. Sanusi, “Performance estimation of parallel Syste under online and offline preventive maintenance”, SIGMA, vol. 42, no. 4, pp. 1088–1100, Aug. 2024, [Online]. Available: https://izlik.org/JA82GP48SM
ISNAD
Ayagi, Hamisu Ismail - Wan, Zhong - Yusuf, İbrahim - Sanusi, Abdullahi. “Performance Estimation of Parallel Syste under Online and Offline Preventive Maintenance”. Sigma Journal of Engineering and Natural Sciences 42/4 (August 1, 2024): 1088-1100. https://izlik.org/JA82GP48SM.
JAMA
1.Ayagi HI, Wan Z, Yusuf İ, Sanusi A. Performance estimation of parallel Syste under online and offline preventive maintenance. SIGMA. 2024;42:1088–1100.
MLA
Ayagi, Hamisu Ismail, et al. “Performance Estimation of Parallel Syste under Online and Offline Preventive Maintenance”. Sigma Journal of Engineering and Natural Sciences, vol. 42, no. 4, Aug. 2024, pp. 1088-00, https://izlik.org/JA82GP48SM.
Vancouver
1.Hamisu Ismail Ayagi, Zhong Wan, İbrahim Yusuf, Abdullahi Sanusi. Performance estimation of parallel Syste under online and offline preventive maintenance. SIGMA [Internet]. 2024 Aug. 1;42(4):1088-100. Available from: https://izlik.org/JA82GP48SM

IMPORTANT NOTE: JOURNAL SUBMISSION LINK https://eds.yildiz.edu.tr/sigma/