Artificial Intelligence in Construction Management Enhancing Decision Making A cross a Project Life Cycle: throught A Machine Learning Method

Volume: 10 Number: 4 October 16, 2026

Artificial Intelligence in Construction Management Enhancing Decision Making A cross a Project Life Cycle: throught A Machine Learning Method

Abstract

The construction industry, which creates 13% of the world’s GDP, suffers from cost overruns of 28% and delays of over 42%, yet is still undigitized. AI has the promise of transforming management in the areas of cost, time and safety. This research provides a systematic review of AI applications and performs an original machine learning analysis on seven algorithms, i.e., Support Vector Machines, Logistic Regression, K-Nearest Neighbors, Random Forest, Stacking Ensemble, Artificial Neural Networks, and XGBoost on 139 Indian road projects with 44 risk factors. XGBoost performed the best with 82.50% accuracy and 84.21% F1-score. The most important concerns were the delay in decision-making (0.152), cash flow problems (0.082) and cost underestimate (0.071). Case studies demonstrate AI’s capabilities: 98.7% accurate cost estimation, 94.36% delay prediction via deep learning, and 97% safety monitoring with computer vision. These findings underscore the importance of ensemble ML in proactive, data-driven risk management, bringing projects into a predictive framework rather than reactive.

Keywords

References

  1. Abdelrahman, O., Elhag, H. A., & Bakhshipour, A. A. (2023). Predicting construction cost overrun using ensemble machine learning: A comparative study. Automation in Construction, 155, 105049.
  2. Ahmeti, M., & Sylejmani, M. (2025). Analyzing construction delays in post-conflict economies: An empirical study of causes and mitigation strategies in the Western Balkans. Turkish Journal of Engineering, 10(1), 252-266. Erişim adresi: https://doi.org/10.31127/tuje.1780047
  3. Alzara, M. (2022). Exploring the impacts of change orders on performance of construction projects in Saudi Arabia. Advances in Civil Engineering, 2022(1), 5775926.
  4. Ansar, A., Flyvbjerg, B., Budzier, A., & Lunn, D. (2016). Does infrastructure investment lead to economic growth or economic fragility? Evidence from China. Oxford Review of Economic Policy, 32(3), 360-390.
  5. Başarslan, M. S., & Kayaalp, F. (2024). Sentiment analysis of coronavirus data with ensemble and machine learning methods. Turkish Journal of Engineering, 8(2), 175-185. Erişim adresi: https://doi.org/10.31127/tuje.1352481
  6. Börner, T., & Zinn, M. (2024). Key challenges in the advancement and industrialization of biobased and biodegradable plastics: A value chain overarching perspective. Frontiers in Bioengineering and Biotechnology, 12, 1406278.
  7. Çalışkan, E. B., & Pekeriçli, M. K. (2025). The involvement of project stakeholders in the briefing process: Evaluations through a construction project. Turkish Journal of Engineering, 9(1), 12-20. Erişim adresi: https://doi.org/10.31127/tuje.1496562
  8. Ding, F., Pors, A., & Bozhevolnyi, S. I. (2018). Gradient metasurfaces: A review of fundamentals and applications. Reports on Progress in Physics, 81(2), 026401.

Details

Primary Language

English

Subjects

Waste Management, Reduction, Reuse and Recycling, Reinforced Concrete Buildings, Architectural Engineering

Journal Section

Research Article

Publication Date

October 16, 2026

Submission Date

June 10, 2026

Acceptance Date

August 1, 2026

Published in Issue

Year 2026 Volume: 10 Number: 4

APA
Nedjwa, E., Lalmi, A., Boumali, B., & Ferhati, K. (2026). Artificial Intelligence in Construction Management Enhancing Decision Making A cross a Project Life Cycle: throught A Machine Learning Method. Turkish Journal of Engineering, 10(4), 1658-1666. https://doi.org/10.31127/tuje.1968203
AMA
1.Nedjwa E, Lalmi A, Boumali B, Ferhati K. Artificial Intelligence in Construction Management Enhancing Decision Making A cross a Project Life Cycle: throught A Machine Learning Method. TUJE. 2026;10(4):1658-1666. doi:10.31127/tuje.1968203
Chicago
Nedjwa, Elafri, Abdallah Lalmi, Badreddine Boumali, and Koudoua Ferhati. 2026. “Artificial Intelligence in Construction Management Enhancing Decision Making A Cross a Project Life Cycle: Throught A Machine Learning Method”. Turkish Journal of Engineering 10 (4): 1658-66. https://doi.org/10.31127/tuje.1968203.
EndNote
Nedjwa E, Lalmi A, Boumali B, Ferhati K (October 1, 2026) Artificial Intelligence in Construction Management Enhancing Decision Making A cross a Project Life Cycle: throught A Machine Learning Method. Turkish Journal of Engineering 10 4 1658–1666.
IEEE
[1]E. Nedjwa, A. Lalmi, B. Boumali, and K. Ferhati, “Artificial Intelligence in Construction Management Enhancing Decision Making A cross a Project Life Cycle: throught A Machine Learning Method”, TUJE, vol. 10, no. 4, pp. 1658–1666, Oct. 2026, doi: 10.31127/tuje.1968203.
ISNAD
Nedjwa, Elafri - Lalmi, Abdallah - Boumali, Badreddine - Ferhati, Koudoua. “Artificial Intelligence in Construction Management Enhancing Decision Making A Cross a Project Life Cycle: Throught A Machine Learning Method”. Turkish Journal of Engineering 10/4 (October 1, 2026): 1658-1666. https://doi.org/10.31127/tuje.1968203.
JAMA
1.Nedjwa E, Lalmi A, Boumali B, Ferhati K. Artificial Intelligence in Construction Management Enhancing Decision Making A cross a Project Life Cycle: throught A Machine Learning Method. TUJE. 2026;10:1658–1666.
MLA
Nedjwa, Elafri, et al. “Artificial Intelligence in Construction Management Enhancing Decision Making A Cross a Project Life Cycle: Throught A Machine Learning Method”. Turkish Journal of Engineering, vol. 10, no. 4, Oct. 2026, pp. 1658-66, doi:10.31127/tuje.1968203.
Vancouver
1.Elafri Nedjwa, Abdallah Lalmi, Badreddine Boumali, Koudoua Ferhati. Artificial Intelligence in Construction Management Enhancing Decision Making A cross a Project Life Cycle: throught A Machine Learning Method. TUJE. 2026 Oct. 1;10(4):1658-66. doi:10.31127/tuje.1968203
Flag Counter