Research Article

Project Management Maturity And Performance Gaps In Algeria’s Construction Sector: A Survey-Based Assessment

Volume: 10 Number: 4 October 16, 2026

Project Management Maturity And Performance Gaps In Algeria’s Construction Sector: A Survey-Based Assessment

Abstract

This study examines the use of project management practices in Algerian construction companies and their impact on overall project performance. Despite the growing importance of project management in the global construction industry, limited research has explored its adoption in developing countries, particularly in Algeria.A quantitative, cross-sectional survey was conducted over nine months with 54 construction firms (an effective response rate of about 27%) using a structured questionnaire covering project organisation, project management (PM) practices, and performance outcomes. The findings indicate moderate but insufficient implementation levels, with average scores of 3.62 for project organisation, 3.67 for PM practices, and 3.48 for project performance (on a five-point scale). Notably, 75% of firms have very few certified PM professionals and 79.2% report no formal certifications, although 52.4% have established Project Management Offices (PMOs). The results reveal a clear gap between the adoption of PM practices and the performance achieved, interpreted as an association rather than a causal effect given the cross-sectional design. The main contribution of this study is to quantify this implementation–performance gap in the Algerian construction sector and to identify the human-capital (certification) deficit as its principal weak link, offering transferable, practice-oriented insights for improving performance in comparable developing contexts.

Keywords

References

  1. Akande, O. K., Obi-George, L. C., Lembi, J. J., Umar, I. A., Tarni, A. M., Nwokorie, A. J., & Baba, P. H. (2024). Public housing project delivery in Nigeria: Quality versus quantity. Journal of Contemporary Urban Affairs, 8(1), 37–56. https://doi.org/10.25034/ijcua.2024.v8n1-3
  2. Alshibani, A., Hafez, B. E., Hassanain, M. A., Mohammed, A., Al-Osta, M., & Bahraq, A. (2024). Fuzzy logic-based method for forecasting project final cost. Buildings, 14(12), 3738. https://doi.org/10.3390/buildings14123738
  3. Alsolami, B. M. (2022). Identifying and assessing critical success factors of value management implementation in the Saudi Arabia building construction industry. Ain Shams Engineering Journal, 13(6), 101804. https://doi.org/10.1016/j.asej.2022.101804
  4. Ansari, R., Khalilzadeh, M., Taherkhani, R., Antucheviciene, J., Migilinskas, D., & Moradi, S. (2022). Performance prediction of construction projects based on the causes of claims: A system dynamics approach. Sustainability, 14(7), 4138. https://doi.org/10.3390/su14074138
  5. Arora, M., Verma, S., Kavita, Wozniak, M., Shafi, J., & Ijaz, M. F. (2022). An efficient ANFIS-EEBAT approach to estimate the effort of Scrum projects. Scientific Reports, 12(1), 7974. https://doi.org/10.1038/s41598-022-11565-2
  6. Çalişkan, E. B., & Pekeriçli, M. K. (2025). The involvement of project stakeholders in the briefing process: Evaluations through a construction project. Turkish Journal of Engineering, 9(1), 12–20. https://doi.org/10.31127/tuje.1496562
  7. Chadee, A. A., Mahabir, R., Banerjee, K. S., Verma, S., & Azamathulla, H. M. (2025). The causal nature of adopting the standardized project management body of knowledge (PMBOK) on construction projects. Discover Civil Engineering, 2(1), 168.
  8. Coşkun, H., & Sancar, S. (2021). Client satisfaction as perceived by architects and civil engineers. Turkish Journal of Engineering, 5(3), 100–104. https://doi.org/10.31127/tuje.688291

Details

Primary Language

English

Subjects

Business Process Management

Journal Section

Research Article

Publication Date

October 16, 2026

Submission Date

June 10, 2026

Acceptance Date

July 27, 2026

Published in Issue

Year 2026 Volume: 10 Number: 4

APA
Lalmi, A., Boumali, B., Nedjwa, E., & Fernandes, G. (2026). Project Management Maturity And Performance Gaps In Algeria’s Construction Sector: A Survey-Based Assessment. Turkish Journal of Engineering, 10(4), 1464-1475. https://doi.org/10.31127/tuje.1968457
AMA
1.Lalmi A, Boumali B, Nedjwa E, Fernandes G. Project Management Maturity And Performance Gaps In Algeria’s Construction Sector: A Survey-Based Assessment. TUJE. 2026;10(4):1464-1475. doi:10.31127/tuje.1968457
Chicago
Lalmi, Abdallah, Badreddine Boumali, Elafri Nedjwa, and Gabriela Fernandes. 2026. “Project Management Maturity And Performance Gaps In Algeria’s Construction Sector: A Survey-Based Assessment”. Turkish Journal of Engineering 10 (4): 1464-75. https://doi.org/10.31127/tuje.1968457.
EndNote
Lalmi A, Boumali B, Nedjwa E, Fernandes G (October 1, 2026) Project Management Maturity And Performance Gaps In Algeria’s Construction Sector: A Survey-Based Assessment. Turkish Journal of Engineering 10 4 1464–1475.
IEEE
[1]A. Lalmi, B. Boumali, E. Nedjwa, and G. Fernandes, “Project Management Maturity And Performance Gaps In Algeria’s Construction Sector: A Survey-Based Assessment”, TUJE, vol. 10, no. 4, pp. 1464–1475, Oct. 2026, doi: 10.31127/tuje.1968457.
ISNAD
Lalmi, Abdallah - Boumali, Badreddine - Nedjwa, Elafri - Fernandes, Gabriela. “Project Management Maturity And Performance Gaps In Algeria’s Construction Sector: A Survey-Based Assessment”. Turkish Journal of Engineering 10/4 (October 1, 2026): 1464-1475. https://doi.org/10.31127/tuje.1968457.
JAMA
1.Lalmi A, Boumali B, Nedjwa E, Fernandes G. Project Management Maturity And Performance Gaps In Algeria’s Construction Sector: A Survey-Based Assessment. TUJE. 2026;10:1464–1475.
MLA
Lalmi, Abdallah, et al. “Project Management Maturity And Performance Gaps In Algeria’s Construction Sector: A Survey-Based Assessment”. Turkish Journal of Engineering, vol. 10, no. 4, Oct. 2026, pp. 1464-75, doi:10.31127/tuje.1968457.
Vancouver
1.Abdallah Lalmi, Badreddine Boumali, Elafri Nedjwa, Gabriela Fernandes. Project Management Maturity And Performance Gaps In Algeria’s Construction Sector: A Survey-Based Assessment. TUJE. 2026 Oct. 1;10(4):1464-75. doi:10.31127/tuje.1968457
Flag Counter