Predictive Models for Roadheaders’ Cutting Performance in Coal Measure Rocks
Öz
Roadheaders offer a unique capability and flexibility for the excavation of soft to medium strength rock formations, hence; are extensively used in underground mining and tunneling operations. A critical issue in successful roadheader application is the ability to evaluate and predict the machine performance. The main objective of this research study is to investigate the cutting performance of roadheaders in coal measure rocks by paying special attention to the influence of discontinuity orientation (alpha angle) and the specific energy. With this respect, a database was established from detailed field data including the measured instantaneous cutting rates (ICR) and geomechanical parameters of the coal measure rocks for each cutting condition in the tunnels. The database was then analyzed by utilizing the statistical method in order to yield new predictive models. The influence of alpha angle (the angle between tunnel axis and the planes of weakness) on roadheader performance was investigated and the correlation between them was found to be good (R²=0.96). The analysis of the specific energy also showed that there is a relatively good relation (R²=0.91) between this parameter and ICR. Finally, the new predictive models for ICR (with respect to alpha angle and specific energy) showed to have highly correlated relationships within the limits of measured values and hence may successfully be used to evaluate the performance of medium-duty roadheaders in coal measure rocks.
Anahtar Kelimeler
Kaynakça
- Bilgin, N., Seyrek, T., and Shahriar, K., 1988. Ro- adheader performance in Istanbul, Gol- den Horn clean-up contributes valuab- le data. Tunnels and Tunnelling (June), 41–44.
- Bilgin, N., Seyrek, T., Erdinc, E., and Shahriar, K., 1990. Roadheaders glean valuab- le tips for Istanbul Metro. Tunnels and
- Tunnelling (October), 29–32.
- Bilgin, N., Yazıcı, S., and Eskikaya, S., 1996. A model to predict the performance of ro- adheaders and impact hammers in tun- nel drivages. Proceedings, Eurock ’96, Balkema, 715–720.
- Bilgin, N., Kuzu, C., and Eskikaya, S., 1997. Cut- ting performance of rock hammers and roadheaders in Istanbul Metro driva- ges. Proceedings, Word Tunnel Cong- ress’97, Tunnels for People, Balkema, 455–460.
- Bilgin, N., Dincer, T., Copur, H., and Erdogan, M., 2004. Some geological and geo- technical factors affecting the perfor- mance of a roadheader in an inclined tunnel. Tunnelling and Underground Space Technology. 19, 629-636.
- Copur, H., Rostami, J., Ozdemir, L., and Bilgin, N., 1997. Studies on performance pre- diction of roadheaders. Proceedings of the 4th International Symposium on Mine Mechanization and Automation, Brisbane, Qld., Australia, A4-1–A4-7.
- Copur, H., Ozdemir, L., and Rostami, J., 1998. Roadheader applications in mining and tunneling. Mining Engineering. 50, 38– 42.
Ayrıntılar
Birincil Dil
İngilizce
Konular
Mühendislik
Bölüm
Araştırma Makalesi
Yazarlar
A. Ebrahımabadı
Bu kişi benim
K. Goshtasbı2
Bu kişi benim
K. Shahrıar
Bu kişi benim
M. Cheraghi Seıfabad
Bu kişi benim
Yayımlanma Tarihi
1 Mart 2011
Gönderilme Tarihi
24 Mart 2015
Kabul Tarihi
-
Yayımlandığı Sayı
Yıl 2011 Cilt: 32 Sayı: 2