This paper investigates how the Assembly Line Balancing (ALB) methods known for the production systems can be applied in service systems. For this purpose, an application study is done in a Physical therapy and rehabilitation clinic. Each standart service provided to patients is taken into consideration as a product, and problem is solved as a mixed model ALB problem. In conclusion, it is seen that the ALB methods developed for the production systems are also applicable in service systems. So, it is possible to do similar studies at hospitals, tax offices, driving licence and passport offices, fast food restaurants, etc.
Bu makalede; özellikle mal üreten sistemlerde bilinen Montaj Hattı Dengeleme (MHD) metodlarının hizmet üreten sistemlere uygulanabilirliği incelenmiştir. Bu amaç doğrultusunda müşterilere tedavi hizmeti üreten bir Fizik Tedavi ve Rehabilitasyon Kliniğinde uygulama çalışması yapılmıştır. Hastalara sunulan standart hizmetlerin her biri bir ürün çeşidi olarak düşünülmüş ve problem karışık modelli MHD problemi olarak çözülmüştür. Neticede, sadece üretim sistemlerine uygulandığını düşündüğümüz bu metotların servis sistemlerine de uygulayabileceği görülmüştür. Dolayısıyla, benzer çalışmaların, Hastaneler, Vergi Daireleri, Ehliyet-Ruhsat ve Pasaport Büroları, Fast Food Restoranları, vb. sınırsız alanlarda da yapılması mümkündür.
Birincil Dil | Türkçe |
---|---|
Bölüm | Makale |
Yazarlar | |
Yayımlanma Tarihi | 1 Ocak 2002 |
Yayımlandığı Sayı | Yıl 2002 Cilt: 8 Sayı: 1 |