Effective Project Team Organization in Project Management Practices
Abstract
Keywords
References
- [1] Cheung, S.-O., Lam, T.-I., Leung, M.-Y., Wan, Y.-W. (2001). An analytical hierarchy process based procurement selection method. Construction Management and Economics 19 (4), 427–437. [2] Ai Lin Teo, E., Ling, F.Y., Chong, A. (2005). Framework for project managers to manage construction safety. International Journal of Project Management 23 (4), 329–341. [3] Dubois and Gadde (2002). The Construction Industry as a loosely coupled system. Implications for productivity and innovativity. [4] Assaf, S.A., Al-Hejji, S. (2006). Causes of delay in large construction projects. International Journal of Project Management 24 (4), 349–357. [5] (International Journal of Information Technology and Decision Making 2012) [6] Fernie, S., Thorpe, A. (2007). Exploring change in construction: supply chain management. Engineering, Construction and Architectural Management 14 (4), 319–333. [7] Dubois, A., & Gadde, L. E. (2000). Supply strategy and network effects—purchasing behaviour in the construction industry. European journal of purchasing & supply management, 6(3-4), 207-215. [8] Green, S. (2002). The human resource management implications of lean construction: critical perspectives and conceptual chasms. Journal of Construction Research 3 (1), 147–165. [9] Blyth, K., Lewis, J., Kaka, A. (2004)."Developing a framework for a standardized works programme for building projects", Construction Innovation, Vol. 4 No.4, pp.193. [10] Brown et al. (2001). "The facilities management role in new building procurement", Facilities, Vol. 9 No.3/4, pp.119. [11] World Bank (1996). World Bank Survey of International Construction Projects, World Bank, London, [12] Zwikael, O., Shimizu, K., Globerson, S. (2005), "Cultural differences in project management processes: a field study", International Journal of Project Management, Vol. 23 No.6, pp.454-62. [13] Kerzner, H. (2006). Project Management: A Systems Approach to Planning, Scheduling and Controlling, 9th ed., Wiley, New York, NY. [14] Turner, J.R. (1999), The Handbook of Project-based Management: Improving the Processes for Achieving Strategic Objectives, McGraw-Hill, London. [15] Lo, T.Y., Fung, I.W.H., Tung, K.C.F. (2006). Construction delays in Hong Kong civil engineering projects. Journal of Construction Engineering and Management 132 (6), 636–649. [16] Mansfield, N.R., Ugwu, O.O., Doran, T. (1994). Causes of delay and cost overruns in Nigerian construction projects. International Journal of Project Management 12 (4), 254–260. [17] Kaming, P.F., Olomolaiye, P.O., Holt, G.D., Harris, F.C. (1997). Factors influencing construction time and cost overruns on high-rise projects in Indonesia. Construction Management and Economics 15 (1), 83–94.Frimpong et al. 2003 [18] Malik, M.A.K., McDermott, P., Swan, W. (2007). "Building trust in construction projects", Supply Chain Management, Vol. 12 No.6, pp.385-91. [19] Meredith, J.R., Mantel, S.J. (2006), Project Management – A Managerial Approach, 6th ed., Wiley, New York, NY, [20] Kerzner, H. (2006), Project Management: A Systems Approach to Planning, Scheduling and Controlling, 9th ed., Wiley, New York, NY, [21] Zwikael, O., Shimizu, K., Globerson, S. (2005), "Cultural differences in project management processes: a field study", International Journal of Project Management, Vol. 23 No.6, pp.454-62. [22] Russell, R.S., Taylor, B.W. (2003), Operations Management, 4th ed., Pearson Education, Upper Saddle River, NJ, . [23] Chiu, Mao-Lin. (2002). An Organizational View of Design Communication in Design Collaboration Egan, J., 1998. Rethinking Construction. HMSO, London. [24] Eriksson and Westerberg, (2010). Effects of cooperative procurement procedures on construction project performance: A conceptual framework. International Journal of Project Management 29 (2011) 197–208 [25] Chan, A., Chan, A. (2004). Key performance indicators for measuring construction success. Benchmarking: An International Journal 11 (2), 203–221. [26] Den Otter, A., & Emmitt, S. (2007). Exploring effectiveness of team communication. Engineering, Construction and Architectural Management. [27] Robinson, H.S., Carrillo, P.M., Anumba, C.J., Al-Ghassani, A.M. (2005), "Review and implementation of performance management models in construction engineering organisations", Construction Innovation, Vol. 5 No.4, pp.203-17. [28] Rwamamara, R. (2007). Planning the Healthy Construction Workplace through Risk Assessment and Design Methods. Civil, Mining, and Environmental Engineering, Lulea˚, Lulea˚ University of Technology, Doctoral Thesis. [29] Cooke-Davies, T. (2002). The “real” success factors on projects. International Journal of Project Management 20 (3), 185–190. [30] Petersen, D.R., Murphree, E.L. (2004). The impact of owner representatives in a design-build construction environment, Project Management Journal, Vol. 35 No.3, pp.27-38. [31] Munns, A.K., Bjeirmi, B.F. (1996). The role of project management in achieving project success. International Journal of Project Management 14 (2), 81–87. [32] Leung, M.Y., Ng, S.T., Cheung, S.O. (2004). Measuring construction project participant satisfaction, Construction Management and Economics, Vol. 22 No.3, pp.319. [33] Sarshar, M., Haigh, R., Amaratunga, D. (2004). Improving project processes: best practice case study, Construction Innovation, Vol. 4 No.2, pp.69-82. [34] The AIA handbook 14th ed.pp.110 [35] Webster’s 1984, Dictionary [36] F Schneider, A Mágori, Z Orosz, T Pulay - Orvosi hetilap,( 2005). A review of the progress towards the adoption of supply chain management (SCM) relationships in construction. European Journal of Purchasing and Supply Management [37] Septelka, D. M., & Cooper, J. A. (2000). Construction of High Performance Equipment Foundations. In Construction Congress VI: Building Together for a Better Tomorrow in an Increasingly Complex World (pp. 768-777). [38] Belle, R.A. (2002). Critical market forces and design-build, DBIA online.
Details
Primary Language
English
Subjects
Architecture
Journal Section
Research Article
Authors
Karen Boujaoude Khoury
*
This is me
France
Publication Date
December 1, 2019
Submission Date
September 5, 2019
Acceptance Date
November 10, 2019
Published in Issue
Year 2019 Volume: 5 Number: 2
