Static Analysis of the Slotted Upper Plate of Low Pressure Casting Machine
Abstract
Keywords
Supporting Institution
Thanks
References
- 1. Kabadayı, E. T. 2002. İşletmelerdeki Üretim Performans Ölçütlerinin Gelişimi, Özellikleri ve Sürekli İyileştirme ile İlişkisi. Doğuş Üniversitesi Dergisi; 61-75.
- 2. Joseph C. Chen, Y. L. 2010. From Value Stream Mapping Toward a Lean/sigma Continuous. International Journal of Production Research; 48: 1069–1086.
- 3. C-C Wang, K.-S. C.-H.-H. 2010. Application of 6-sigma Design System to Developing an Improvement Model for Multi-process Multi Characteristic. Vol. 225 Part B: J. Engineering Manufacture; 1205-1216.
- 4. Berger, A. 1997. Continuous improvement and kaizen: standardization and organizational designs. Integrated Manufacturing Systems; 110–117.
- 5. B. Modarress, A. A. 2005. Kaizen Costing for Lean Manufacturing: a Case Study. International Journal of Production Research; 43: 1751–1760.
- 6. K. Venkataramana, B. R. 2014. Application of Value Stream Mapping for Reduction of Cycle Time in a Machining Process. Procedia Materials Science; 6: 1187 – 1196.
- 7. Amit Kumar, A. a. 2013. Impacts of Kaizen in a Small-scale Industry of India: a Case Study. International Journal of Lean Six Sigma; 22-45.
- 8. Sunil Kumar, A. K. 2018. Process Improvement Through Lean-Kaizen Using Value Stream Map: A Case Study in India. The International Journal of Advanced Manufacturing Technology; 96: 2687–2698.
Details
Primary Language
English
Subjects
Engineering
Journal Section
Research Article
Authors
Yasemin Nur Aydın
0000-0001-7083-2329
Türkiye
Onur Ozaydin
*
0000-0001-6395-7553
Türkiye
Ahmet Alper Akış
0000-0001-7458-6671
Türkiye
Publication Date
December 30, 2020
Submission Date
August 12, 2020
Acceptance Date
March 11, 2021
Published in Issue
Year 2021 Volume: 17 Number: 1