Research Article

Assessing constructive heuristics for solving hydro unit commitment and loading problem

Volume: 3 Number: 1 June 30, 2023
EN

Assessing constructive heuristics for solving hydro unit commitment and loading problem

Abstract

Solving Hydro Unit Commitment problems is a challenge for real systems due to substantial number of variables and non-linear equations. The use of Constructive Heuristics is a robust strategy to solve this kind of problems. This present paper proposes a Constructive Heuristic that uses a Non-Linear Programming (NLP) solver and a Sensitivity Factor during its solution process. The methodology is applied and compared to a case study. The results are evaluated with variations of the original case.

Keywords

References

  1. [1] Finardi, E. C., & Scuzziato, M. R., Hydro unit commitment and loading problem for day-ahead operation planning problem. International Journal of Electrical Power & Energy Systems. 2013; 44: 7–16.
  2. [2] Finardi, E. C., & Scuzziato, M. R., A comparative analysis of different dual problems in thelagrangian relaxation context for solving the hydro unit commitment problem. Electricpower Systems Research, 2014; 107: 221–229.
  3. [3] Romero, R., Rocha, C., Mantovani, M., & Mantovani, J. R. S., Analysis of heuristic algorithms for the transportation model in static and multi-stage planning in network expansion systems. IEE Proceedings - Generation, Transmission and Distribution, 2003; 5(150): 521-526.
  4. [4] Romero, R., Rocha, C., Mantovani, M., & Mantovani, J. R. S., Evaluation of hybrid models for static andmultistage transmission system planning. Revista Controle & Automação, 2007; 18
  5. [5] Drud, A. S., Conopt - a large scale grg code. ORSA Journal on Computing, 6.
  6. [6] Santos, T., Diniz, A., Saboia, C., Cabral, R., & Cerqueira, L., Hourly pricing and day-ahead dispatch setting in Brazil: The dessem model. Electric Power Systems Research, 2000; 189
  7. [7] Fleten, S. T., & Kristoffersen, T. K., Short-term hydropower production planning by stochastic programming. Computers & Operations Research, 2008; 35: 2656-2671.
  8. [8] Chen, Y., Liu, F., Liu, B., Wei, W., & Mei, S., An Efficient MILP Approximation for the Hydro-Thermal Unit Commitment. IEEE Transactions on Power Systems, 2016; 31(4).

Details

Primary Language

English

Subjects

Software Engineering (Other)

Journal Section

Research Article

Authors

Carlos Roberto Mendonça Da Rocha This is me
0000-0002-0711-2668
Brazil

Murilo Reolon Scuzziato This is me
0000-0002-4047-3780
Brazil

Publication Date

June 30, 2023

Submission Date

February 18, 2023

Acceptance Date

March 7, 2023

Published in Issue

Year 2023 Volume: 3 Number: 1

Vancouver
1.Daniel Firmo Kazay, Carlos Roberto Mendonça Da Rocha, Murilo Reolon Scuzziato. Assessing constructive heuristics for solving hydro unit commitment and loading problem. Computers and Informatics [Internet]. 2023 Jun. 1;3(1):26-34. Available from: https://izlik.org/JA63LB66MW

Computers and Informatics is licensed under CC BY-NC 4.0