Development of a New Generation Intelligent Link Box (iLinkBox™) with Early Warning System for High Voltage Cable System
Öz
Anahtar Kelimeler
Kaynakça
- [1] CIGRE Working Group B1.50, ‘’Sheath bonding systems of AC transmission cables- design, testing, and maintenance’’, report no 797, March 2020.
- [2] Sadettin Erdeniz, ‘’Link box with built-in insulator type voltage divider and inductive partial discharge sensor", WIPO (PCT) report WO2019194754A1, 2018.
- [3] Sadettin Erdeniz, "Link box with built-in partial discharge sensor", WIPO (PCT) report WO2016190823A1, 2015.
- [4] Xiang Dong, Yanling Yuan, Zhongqiang Gao, Chengke Zhou, Peter Wallace, Babakalli Alkali, Bojie Sheng, Hao Zhou, ‘’Analysis of Cable Failure Modes and Cable Joint Failure Detection via Sheath Circulating Current’’, IEEE Electrical Insulation Conference (EIC), 2014.
- [5] CIGRE Working Group B1.18, ‘’Special Bonding of High Voltage Power Cables’’, report no 283, 2005.
- [6] Aarsh Illbeygi, Hadi Aliabadi, ‘’Simulation and analysis of sheath voltage limiter failure in undergrounded cable transmission line in Mashhad city’’, 29th International Power System Conference, 2014.
- [7] F Ghassemi, ‘’Effect of Trapped Charges on Cable SVL Failure’’, International Conference on Power Systems Transients (IPST), 2013.
- [8] Mingzhen Li, Wenjun Zhou, Chunlin Wang, Leiming Yao, Mengting Su, Xiaojun Huang, Chengke Zhou, ‘’ A novel fault localization method based on monitoring of sheath current in a cross-bonded HV cable system’’, Sensors Journal, 2018.
Ayrıntılar
Birincil Dil
İngilizce
Konular
Mühendislik
Bölüm
Araştırma Makalesi
Yazarlar
Abdollatıf Bashghareh
*
Türkiye
Yayımlanma Tarihi
30 Haziran 2021
Gönderilme Tarihi
11 Haziran 2020
Kabul Tarihi
29 Ocak 2021
Yayımlandığı Sayı
Yıl 2021 Cilt: 11 Sayı: 21