A Dynamic Approach In Production Management for Automotive Field
Abstract
Keywords
References
- Panwalkar, S.S., Iskander. W., (1977) A survey of scheduling rules, Operations research 25.1, 45-61.
- Sun, D., Lin, L., (1994) A dynamic job shop scheduling framework: a backward approach. The International Journal of Production Research, 32(4), 967-985.
- Tjornfelt-Jensen, M., Hansen, T. K., (1999) Robust solutions to job shop problems. In Proceedings of the 1999 Congress on Evolutionary Computation-CEC99 IEEE (Cat. No. 99TH8406) 2, 1138-1144.
- Duenyas, I., Van Oyen, M. P., (1996). Heuristic scheduling of parallel heterogeneous queues with set-ups. Management Science, 42(6), 814-829.
- Banerjee, S., Banerjee, A., Burton, J., Bistline, W., (2001) Controlled partial shipments in two-echelon supply chain networks: a simulation study. International Journal of Production Economics, 71(1-3), 91-100.
- Godin, V. B. (1978). Interactive scheduling: historical survey and state of the art. AIIE Transactions, 10(3), 331-337.
- Vancheeswaran, R., Townsend, M. A., (1993) Two-stage heuristic procedure for scheduling job shops. Journal of Manufacturing Systems, 12(4), 315-325.
- Blackstone, J. H., Phillips, D. T., Hogg, G. L., (1982) A state-of-the-art survey of dispatching rules for manufacturing job shop operations. The International Journal of Production Research, 20(1), 27-45.
Details
Primary Language
English
Subjects
Mechanical Engineering
Journal Section
Research Article
Authors
Banu Özkeser
*
0000-0002-0289-1674
Türkiye
Publication Date
June 20, 2020
Submission Date
January 22, 2020
Acceptance Date
February 26, 2020
Published in Issue
Year 2020 Volume: 4 Number: 2