Abstract

In this study, the conditions for parallel binding of the alternators used in the power plants to grid were examined and the fulfillment of these conditions was carried out with Arduino. The power plant drive system has been modeled as Asynchronous motor module with 3 phase power of 5 kW. In the alternator part, asynchronous machine was used at 13 kVA power. Voltage, frequency, phase sequence and phase difference magnitudes of alternator and grid are used as input data of Arduino. Voltage, frequency, phase sequence and phase difference magnitudes of alternator and network are used as input data of Arduino. Four different modules have been designed to be integrated into Arduino for every magnitude. These modules evaluate the information from the grid and the alternator. Arduino brings the alternator and the grid in parallel via the relay at the output when appropriate conditions met. Modules designed for the training set, software embedded in Arduino allows practical parallel connection without using different measuring instruments.  

Keywords

References

  1. Colak, I. (2003). Synchronous Machines. Seçkin Publishing, Ankara. Chapman, S.J. (1987). Electric Machinery Fundamentals. McGraw-Hill Book Company. Çolak, I., Yılmaz, E.N. (1999). Simulation of the parallel connection of electrical power stations. IJEEE International Journal of Electrical Engineering Education, 36 (4), 332-341. IEEE Std. (2005). IEEE Power Engineering Society. IEEE standard for synchrophasors for power systems, C37. 118. Mahmoud, M. S., Ismail, A. (2003). Control of electric power systems. Systems Analysis Modeling Simulation, 43(12), 1639-1673. Martin, K.E. (1993). Precise timing in electric power systems. IEEE International Frequency Control Symposium, 15-22. Metwally, H.M.B. (2000). Operation of new variable speed constant voltage and frequency generator connected to the grid. Energy Conversion and Management, 41(7), 701-712. Phadke AG and subcommittee of the IEEE Power System Relaying Committee, Synchronized sampling and phasor measurements for relaying and control, IEEE Transactions on Power Delivery, 9 (1), 442- 452, 1994. Radovanovic, A. (2001). Using the internet in networking of synchronized phasor measurement units. Elsevier, Electrical Power and Energy Systems 23, 245-250.

Details

Primary Language

English

Subjects

Engineering

Journal Section

Research Article

Authors

Elif Merve Bahar This is me

Kivanc Basaran This is me

İsa Serdar Topbas This is me

Publication Date

December 4, 2018

Submission Date

November 20, 2018

Acceptance Date

-

Published in Issue

Year 2018 Number: 4

APA
Bahar, E. M., Basaran, K., & Topbas, İ. S. (2018). Parallel Binding Process of Alternators with Arduino. The Eurasia Proceedings of Science Technology Engineering and Mathematics, 4, 56-60. https://izlik.org/JA86WX28HD