EN
TR
Decision Making For Rail System Projects With AHP-GP and ANP-GP
Abstract
As one of the most crowded cities in the world, Istanbul attaches great importance to investments in rail system and makes projects to solve the problem of urban transportation. Due to be impossible for every projected project to be passed on to life, todays, the necessity of project selection is emerge in according to scarce resources. Multicriteria decision making process is required in the transportation project selection due to the evaluation with various factors such as cost, engineering, population, access, integration etc. In this study, the analytic network process and the analitic hierarcy process was used individually to weight the selection criteria and the best suitable projects were selected from the projected rail system projects for Istanbul with the founded AHP-GP and ANP-GP models. Finally, the results found by this method were compared and evaluated. The AHP and ANP ranking were made, then the project selection problem is solved with the AHP-HP and ANP-HP.The ranking found with AHP and ANP in the weighting process varied. However, the same results were obtained in the goal programming solutions.
Keywords
References
- [1] Meade L.M., Presley A. R&D project selection using the analytic network process. Engineering Management, IEEE Transactions on, 2012, 49:59-66. DOI: 10.1109/17.985748
- [2] Cheng E.W., Li H. Analytic network process applied to project selection. Journal of Construction Engineering and Management, 2005, 131: 459-466. DOI: https://doi.org/10.1061/(ASCE)0733-9364(2005)131:4(459)
- [3] Begičević N., Divjak B., Hunjak T. Decisionmaking on prioritization of projects in higher education institutions using the analytic network process approach, Central European Journal of Operations Research, 2010, 18:341-364. DOI: https://doi.org/10.1007/s10100-009-0113-3
- [4] Ivanović I., Grujičić D., Macura D., Jović J., Bojović N. One approach for road transport project selection. Transport Policy, 2013, 25:22-29. DOI: https://doi.org/10.1016/j.tranpol.2012.10.001
- [5] Grady C.A., He X., Peeta S. Integrating social network analysis with analytic network process for international development project selection. Expert Systems with Applications, 2015, 42: 5128-5138. DOI: https://doi.org/10.1016/j.eswa.2015.02.039
- [6] Tuzkaya U.R., Yolver E. R&D project selectıon by integrated grey analytic network process and grey relational analysis: an implementation for home appliances company. Journal of Aeronautics and Space Technologies, 2015, 8: 35-41. DOI: 10.7603/s40690-015-0014-8.
- [7] Lee J.W., Kim S.H. An integrated approach for interdependent information system project selection. International Journal of Project Management, 2001, 19:111-118. DOI: https://doi.org/10.1016/S0263-7863(99)00053-8
- [8] Wey W.M., Wu K.Y. Using ANP priorities with goal programming in resource allocation in transportation. Mathematical and Computer Modeling, 2007, 46:985-1000. DOI: https://doi.org/10.1016/j.mcm.2007.03.017.
Details
Primary Language
English
Subjects
-
Journal Section
Research Article
Publication Date
December 27, 2017
Submission Date
June 15, 2017
Acceptance Date
September 10, 2017
Published in Issue
Year 2017 Volume: 3 Number: 3
APA
Hamurcu, M., & Eren, T. (2017). Decision Making For Rail System Projects With AHP-GP and ANP-GP. Gazi Journal of Engineering Sciences, 3(3), 1-13. https://izlik.org/JA55AS75RN
AMA
1.Hamurcu M, Eren T. Decision Making For Rail System Projects With AHP-GP and ANP-GP. GJES. 2017;3(3):1-13. https://izlik.org/JA55AS75RN
Chicago
Hamurcu, Mustafa, and Tamer Eren. 2017. “Decision Making For Rail System Projects With AHP-GP and ANP-GP”. Gazi Journal of Engineering Sciences 3 (3): 1-13. https://izlik.org/JA55AS75RN.
EndNote
Hamurcu M, Eren T (December 1, 2017) Decision Making For Rail System Projects With AHP-GP and ANP-GP. Gazi Journal of Engineering Sciences 3 3 1–13.
IEEE
[1]M. Hamurcu and T. Eren, “Decision Making For Rail System Projects With AHP-GP and ANP-GP”, GJES, vol. 3, no. 3, pp. 1–13, Dec. 2017, [Online]. Available: https://izlik.org/JA55AS75RN
ISNAD
Hamurcu, Mustafa - Eren, Tamer. “Decision Making For Rail System Projects With AHP-GP and ANP-GP”. Gazi Journal of Engineering Sciences 3/3 (December 1, 2017): 1-13. https://izlik.org/JA55AS75RN.
JAMA
1.Hamurcu M, Eren T. Decision Making For Rail System Projects With AHP-GP and ANP-GP. GJES. 2017;3:1–13.
MLA
Hamurcu, Mustafa, and Tamer Eren. “Decision Making For Rail System Projects With AHP-GP and ANP-GP”. Gazi Journal of Engineering Sciences, vol. 3, no. 3, Dec. 2017, pp. 1-13, https://izlik.org/JA55AS75RN.
Vancouver
1.Mustafa Hamurcu, Tamer Eren. Decision Making For Rail System Projects With AHP-GP and ANP-GP. GJES [Internet]. 2017 Dec. 1;3(3):1-13. Available from: https://izlik.org/JA55AS75RN
