In recent years, intercity transportation
has gained momentum towards high-speed rail in Turkey. Ankara-Konya,
Ankara-Eskişehir and Istanbul lines were opened for high-speed transportation
in this area. There are still high-speed train lines under construction. At the
same time, there are also various high-speed rail projects that will be started
soon and are in the designing process. However, these projects require a big
budget. Because of this, it is not possible to carry out all the projects and
some projects are carried out gradually. In this study, prioritization of the
high-speed rail projects was done by using the analytical hierarchy process
(AHP). As a result of prioritization made through criteria determined by
literature review and expert opinion, evaluations are made.
Primary Language | English |
---|---|
Journal Section | Research Articles |
Authors | |
Publication Date | August 15, 2018 |
Submission Date | March 7, 2018 |
Acceptance Date | April 18, 2018 |
Published in Issue | Year 2018 Volume: 2 Issue: 2 |