Abstract

Design of Biogas Production using Wastewater from Industrial Plants: Financial Analysis of Various Feed-in-tariff Remunerations in Thailand

Year 2016, Volume: 6 Issue: 2, 318 - 334, 01.06.2016

Abstract

In this study, we provide a sample conceptual design and explanation of existing biogas plants that can be attached to various kinds of plants that release wastewater with suitable amounts of COD. Financial information was collected and analysed in terms of investment costs, operational costs and historical data of electricity generation from biogas. The results show that in order to promote biogas business in Thailand, the government should provide FiT remuneration of 5 baht per kilowatt hour when contract capacity is 0.02-2 MW. When contract capacity is increased to greater than 2 MW, but less than 4 MW, the FiT remuneration should be reduced to 3 baht per kilowatt hour per MW to ensure profits of the investment. However, when contract capacity is greater than 4 MW, the government need not provide any FiT remuneration

There are 0 citations in total.

Details

Other ID JA65HJ33ZK
Journal Section Research Article
Authors

Kamolwan Deeswasmongkol This is me

Naraphorn Haphuriwat Paoprasert This is me

Publication Date June 1, 2016
Published in Issue Year 2016 Volume: 6 Issue: 2

Cite

APA Deeswasmongkol, K., & Paoprasert, N. H. (2016). Design of Biogas Production using Wastewater from Industrial Plants: Financial Analysis of Various Feed-in-tariff Remunerations in Thailand. International Journal of Energy Economics and Policy, 6(2), 318-334.
AMA Deeswasmongkol K, Paoprasert NH. Design of Biogas Production using Wastewater from Industrial Plants: Financial Analysis of Various Feed-in-tariff Remunerations in Thailand. IJEEP. June 2016;6(2):318-334.
Chicago Deeswasmongkol, Kamolwan, and Naraphorn Haphuriwat Paoprasert. “Design of Biogas Production Using Wastewater from Industrial Plants: Financial Analysis of Various Feed-in-Tariff Remunerations in Thailand”. International Journal of Energy Economics and Policy 6, no. 2 (June 2016): 318-34.
EndNote Deeswasmongkol K, Paoprasert NH (June 1, 2016) Design of Biogas Production using Wastewater from Industrial Plants: Financial Analysis of Various Feed-in-tariff Remunerations in Thailand. International Journal of Energy Economics and Policy 6 2 318–334.
IEEE K. Deeswasmongkol and N. H. Paoprasert, “Design of Biogas Production using Wastewater from Industrial Plants: Financial Analysis of Various Feed-in-tariff Remunerations in Thailand”, IJEEP, vol. 6, no. 2, pp. 318–334, 2016.
ISNAD Deeswasmongkol, Kamolwan - Paoprasert, Naraphorn Haphuriwat. “Design of Biogas Production Using Wastewater from Industrial Plants: Financial Analysis of Various Feed-in-Tariff Remunerations in Thailand”. International Journal of Energy Economics and Policy 6/2 (June 2016), 318-334.
JAMA Deeswasmongkol K, Paoprasert NH. Design of Biogas Production using Wastewater from Industrial Plants: Financial Analysis of Various Feed-in-tariff Remunerations in Thailand. IJEEP. 2016;6:318–334.
MLA Deeswasmongkol, Kamolwan and Naraphorn Haphuriwat Paoprasert. “Design of Biogas Production Using Wastewater from Industrial Plants: Financial Analysis of Various Feed-in-Tariff Remunerations in Thailand”. International Journal of Energy Economics and Policy, vol. 6, no. 2, 2016, pp. 318-34.
Vancouver Deeswasmongkol K, Paoprasert NH. Design of Biogas Production using Wastewater from Industrial Plants: Financial Analysis of Various Feed-in-tariff Remunerations in Thailand. IJEEP. 2016;6(2):318-34.