BibTex RIS Cite

Wage System Manufacturing Company: Normative and Expectations

Year 2015, Volume: 5 Issue: 1, 304 - 310, 01.03.2015
https://izlik.org/JA64HM26DB

Abstract

The study determine the wages models applied by the company in Batam which is expected to provide a wide range of reference models in different strata of wage and cluster companies. It is also expected to help the local government as a factor in determining the minimum wage policy making through recommendations wages models are ideal in Batam. Data was collected using interview techniques to the manufacturing industry in three related units in a company that is human resource, administrative staff and production staff. The results of the study were analyzed qualitatively to explore models that have been applied and the desire of employees. The model has been applied to remuneration in accordance with the general models that already exist, but there are still some wishes of the employees on the compensation of employees in the company they both administrative and production employees. Researchers also analyzed employee satisfaction with the existing system and the results are most of the employees did not feel satisfied with the remuneration system.

Year 2015, Volume: 5 Issue: 1, 304 - 310, 01.03.2015
https://izlik.org/JA64HM26DB

Abstract

There are 0 citations in total.

Details

Other ID JA26PR67MP
Authors

Arniati . This is me

Hendra Gunawan This is me

Ely Kartikaningdyah This is me

Publication Date March 1, 2015
IZ https://izlik.org/JA64HM26DB
Published in Issue Year 2015 Volume: 5 Issue: 1

Cite

APA ., A., Gunawan, H., & Kartikaningdyah, E. (2015). Wage System Manufacturing Company: Normative and Expectations. International Journal of Economics and Financial Issues, 5(1), 304-310. https://izlik.org/JA64HM26DB
AMA 1.. A, Gunawan H, Kartikaningdyah E. Wage System Manufacturing Company: Normative and Expectations. IJEFI. 2015;5(1):304-310. https://izlik.org/JA64HM26DB
Chicago ., Arniati, Hendra Gunawan, and Ely Kartikaningdyah. 2015. “Wage System Manufacturing Company: Normative and Expectations”. International Journal of Economics and Financial Issues 5 (1): 304-10. https://izlik.org/JA64HM26DB.
EndNote . A, Gunawan H, Kartikaningdyah E (March 1, 2015) Wage System Manufacturing Company: Normative and Expectations. International Journal of Economics and Financial Issues 5 1 304–310.
IEEE [1]A. ., H. Gunawan, and E. Kartikaningdyah, “Wage System Manufacturing Company: Normative and Expectations”, IJEFI, vol. 5, no. 1, pp. 304–310, Mar. 2015, [Online]. Available: https://izlik.org/JA64HM26DB
ISNAD ., Arniati - Gunawan, Hendra - Kartikaningdyah, Ely. “Wage System Manufacturing Company: Normative and Expectations”. International Journal of Economics and Financial Issues 5/1 (March 1, 2015): 304-310. https://izlik.org/JA64HM26DB.
JAMA 1.. A, Gunawan H, Kartikaningdyah E. Wage System Manufacturing Company: Normative and Expectations. IJEFI. 2015;5:304–310.
MLA ., Arniati, et al. “Wage System Manufacturing Company: Normative and Expectations”. International Journal of Economics and Financial Issues, vol. 5, no. 1, Mar. 2015, pp. 304-10, https://izlik.org/JA64HM26DB.
Vancouver 1.Arniati ., Hendra Gunawan, Ely Kartikaningdyah. Wage System Manufacturing Company: Normative and Expectations. IJEFI [Internet]. 2015 Mar. 1;5(1):304-10. Available from: https://izlik.org/JA64HM26DB