Abstract

Pipelines that supply water from water resource to the reservoirs constitute an important part of water supply system construction. In this study, environmental impacts of construction of pipeline component of a water supply system in Van, Turkey are investigated using Life Cycle Assessment (LCA) methodology. Construction of pipelines is executed using conventional open cut system. Life cycle inventory (LCI) of the study is generated using primary data gathered and GaBi Professional database is used for background processes. CML 2001 was the environmental impact assessment method used. According to the results, the main contributors to AP, FAETP, GWP, HTP, MAETP are raw materials used for the production of pipelines which are high density polyethylene granules and carbon black. Most of TETP is generated because of installation of pipelines and sand used for backfilling the pipe trenches is responsible of this. Production and installation of pipelines end up with ADP due to the used materials. Transportation activities executed during the construction of pipelines have environmental impacts in every category considered; however, their contribution is not significant compared to the other activities conducted.

Keywords

References

  1. Baumann, H., Tillman, A.M. (2004). The Hitch Hiker’s Guide to LCA. Lund: Studentlitteratur.
  2. Du, F., Woods, G. J., Kang, D., Lansey, K. E., Arnold, R. G. (2012). Life Cycle Analysis for Water and Wastewater Pipe Materials. Journal of Environmental Engineering, 139 (5), 703-711.
  3. Elginoz, N., Alzaboot, M., Germirli Babuna, F., Iskender, G. (2019). Construction of a large water treatment plant: appraisal of environmental hotspots, Desalination and Water Treatment, 172, 309-315.
  4. Google Maps (2019). Retrieved 07.01.2020 from https://www.google.com/maps/@38.4036097,43.3454951,32609m/data=!3m1!1e3
  5. Hajibabaei, M., Nazif, S., Sereshgi, F. T. (2018). Life cycle assessment of pipes and piping process in drinking water distribution networks to reduce environmental impact. Sustainable Cities and Society, 43, 538-549, ISSN 2210-6707, https://doi.org/10.1016/j.scs.2018.09.014.
  6. Kecojevic, V., Komljenovic, D. (2011). Impact of bulldozer’s engine load factor on fuel consumption, CO2 emission and cost. American Journal of Environmental Sciences, 7 (2), 125-131.
  7. Loss, A., Toniolo, S., Mazzi, A., Manzardo, A., Scipioni, A. (2018). LCA comparison of traditional open cut and pipe bursting systems for relining water pipelines, Resources, Conservation and Recycling, 128, 458-469, https://doi.org/10.1016/j.resconrec.2016.08.001.
  8. Petit-Boix, A., Sanjuan-Delmás, D., Gasol, C. M., Villalba, G., Suárez-Ojeda, M. E., Gabarrell, X., Josa, A., Rieradevall, J. (2014). Environmental assessment of sewer construction in small to medium sized cities using life cycle assessment. Water Resources Management, 28 (4), 979-997.

Details

Primary Language

English

Subjects

Engineering

Journal Section

Research Article

Publication Date

April 26, 2020

Submission Date

February 11, 2020

Acceptance Date

March 25, 2020

Published in Issue

Year 2020 Volume: 7 Number: 1

APA
Haidery, J. A., & Baş, B. (2020). Life Cycle Assessment of Construction of Water Supply Pipelines: A Case Study from Van, Turkey. International Journal of Environment and Geoinformatics, 7(1), 23-32. https://doi.org/10.30897/ijegeo.687547
AMA
1.Haidery JA, Baş B. Life Cycle Assessment of Construction of Water Supply Pipelines: A Case Study from Van, Turkey. IJEGEO. 2020;7(1):23-32. doi:10.30897/ijegeo.687547
Chicago
Haidery, Jaweed Ahmad, and Bilge Baş. 2020. “Life Cycle Assessment of Construction of Water Supply Pipelines: A Case Study from Van, Turkey”. International Journal of Environment and Geoinformatics 7 (1): 23-32. https://doi.org/10.30897/ijegeo.687547.
EndNote
Haidery JA, Baş B (April 1, 2020) Life Cycle Assessment of Construction of Water Supply Pipelines: A Case Study from Van, Turkey. International Journal of Environment and Geoinformatics 7 1 23–32.
IEEE
[1]J. A. Haidery and B. Baş, “Life Cycle Assessment of Construction of Water Supply Pipelines: A Case Study from Van, Turkey”, IJEGEO, vol. 7, no. 1, pp. 23–32, Apr. 2020, doi: 10.30897/ijegeo.687547.
ISNAD
Haidery, Jaweed Ahmad - Baş, Bilge. “Life Cycle Assessment of Construction of Water Supply Pipelines: A Case Study from Van, Turkey”. International Journal of Environment and Geoinformatics 7/1 (April 1, 2020): 23-32. https://doi.org/10.30897/ijegeo.687547.
JAMA
1.Haidery JA, Baş B. Life Cycle Assessment of Construction of Water Supply Pipelines: A Case Study from Van, Turkey. IJEGEO. 2020;7:23–32.
MLA
Haidery, Jaweed Ahmad, and Bilge Baş. “Life Cycle Assessment of Construction of Water Supply Pipelines: A Case Study from Van, Turkey”. International Journal of Environment and Geoinformatics, vol. 7, no. 1, Apr. 2020, pp. 23-32, doi:10.30897/ijegeo.687547.
Vancouver
1.Jaweed Ahmad Haidery, Bilge Baş. Life Cycle Assessment of Construction of Water Supply Pipelines: A Case Study from Van, Turkey. IJEGEO. 2020 Apr. 1;7(1):23-32. doi:10.30897/ijegeo.687547

Cited By