Research Article

EVALUATION OF THE ACTIVITIES CARRIED OUT IN A FURNITURE FACTORY THROUGH WORK AND TIME STUDY

Volume: 5 Number: 1 January 20, 2023
EN TR

EVALUATION OF THE ACTIVITIES CARRIED OUT IN A FURNITURE FACTORY THROUGH WORK AND TIME STUDY

Abstract

Efficiency is one of the most important elements of competition. In order for the enterprises to maintain their competitiveness in the market, it is inevitable that they reduce the unit costs of the products they produce and increase the efficiency, depending on the collected study information. At the same time, it is important for businesses to know which product, how and in what time they produce so that they can use their resources in the best way. Work study; It is carried out in order to determine how a job is carried out with low capital, and to increase production profitability by using labor and equipment in the most appropriate way. Especially in the furniture sector, efficiency analysis is gaining importance with the increasing costs. Not enough work has been done in this area. For this reason, in this study, the effect of work and time study on productivity was investigated in a furniture factory. For this purpose, a survey study was conducted in the form of face-to-face interviews with 90 people working as workers in the Imaj Furniture Factory operating in the province of Isparta. Survey forms consist of two separate parts. In the first part, there are questions about the demographic characteristics of the employees, and in the second part, there are a total of 40 questions to be answered by the employees. The survey results were interpreted using the SPSS 17 statistical analysis program. All collected data were evaluated using frequency analysis and Chi-square test. As a result of this research, some statistical results were obtained showing the productivity improvement with the work and time study in the factory.

Keywords

References

  1. [1] Şenyiğit, E., Karakaş, S., Uçar, S., Akbal, S., 2021. Analysis of Work-Study-Productivity Practice for Enterprise Resource Planning in a Furniture Firm: Case Study, European Journal of Science and Technology, Special Issue 28, pp. 476-480.
  2. [2] Cengiz, T. G., Orbak, A. Y., (2010). Increasing Efficiency with Work and Time Study in a Milk and Dairy Products Factory, International Journal of Engineering Research and Development, Vol.2, No.2.
  3. [3] Doğruer, İ., (2014). Work study. 2nd Edition, Açılım Bookstore , İstanbul.
  4. [4] Acar, N., (2001). Production Planning Methods and Practices, National Productivity Center Publication No:280, 8th Edition Ankara.

Details

Primary Language

English

Subjects

Engineering

Journal Section

Research Article

Publication Date

January 20, 2023

Submission Date

September 14, 2022

Acceptance Date

December 5, 2022

Published in Issue

Year 2023 Volume: 5 Number: 1

APA
Akarslan Kodaloğlu, F. (2023). EVALUATION OF THE ACTIVITIES CARRIED OUT IN A FURNITURE FACTORY THROUGH WORK AND TIME STUDY. International Journal of Engineering and Innovative Research, 5(1), 23-32. https://doi.org/10.47933/ijeir.1175280
AMA
1.Akarslan Kodaloğlu F. EVALUATION OF THE ACTIVITIES CARRIED OUT IN A FURNITURE FACTORY THROUGH WORK AND TIME STUDY. IJEIR. 2023;5(1):23-32. doi:10.47933/ijeir.1175280
Chicago
Akarslan Kodaloğlu, Feyza. 2023. “EVALUATION OF THE ACTIVITIES CARRIED OUT IN A FURNITURE FACTORY THROUGH WORK AND TIME STUDY”. International Journal of Engineering and Innovative Research 5 (1): 23-32. https://doi.org/10.47933/ijeir.1175280.
EndNote
Akarslan Kodaloğlu F (January 1, 2023) EVALUATION OF THE ACTIVITIES CARRIED OUT IN A FURNITURE FACTORY THROUGH WORK AND TIME STUDY. International Journal of Engineering and Innovative Research 5 1 23–32.
IEEE
[1]F. Akarslan Kodaloğlu, “EVALUATION OF THE ACTIVITIES CARRIED OUT IN A FURNITURE FACTORY THROUGH WORK AND TIME STUDY”, IJEIR, vol. 5, no. 1, pp. 23–32, Jan. 2023, doi: 10.47933/ijeir.1175280.
ISNAD
Akarslan Kodaloğlu, Feyza. “EVALUATION OF THE ACTIVITIES CARRIED OUT IN A FURNITURE FACTORY THROUGH WORK AND TIME STUDY”. International Journal of Engineering and Innovative Research 5/1 (January 1, 2023): 23-32. https://doi.org/10.47933/ijeir.1175280.
JAMA
1.Akarslan Kodaloğlu F. EVALUATION OF THE ACTIVITIES CARRIED OUT IN A FURNITURE FACTORY THROUGH WORK AND TIME STUDY. IJEIR. 2023;5:23–32.
MLA
Akarslan Kodaloğlu, Feyza. “EVALUATION OF THE ACTIVITIES CARRIED OUT IN A FURNITURE FACTORY THROUGH WORK AND TIME STUDY”. International Journal of Engineering and Innovative Research, vol. 5, no. 1, Jan. 2023, pp. 23-32, doi:10.47933/ijeir.1175280.
Vancouver
1.Feyza Akarslan Kodaloğlu. EVALUATION OF THE ACTIVITIES CARRIED OUT IN A FURNITURE FACTORY THROUGH WORK AND TIME STUDY. IJEIR. 2023 Jan. 1;5(1):23-32. doi:10.47933/ijeir.1175280

88x31.png

This work is licensed under a Creative Commons Attribution 4.0 International License