Research Article

Deviation(s) in Project Life Cycle: Case of Construction Industry

Volume: 5 Number: 3 July 15, 2022
  • Svanborg María Guðmundsdóttir
  • Ligita Zailskaitė-jakštė
  • Inga Minelgaite *
TR EN

Deviation(s) in Project Life Cycle: Case of Construction Industry

Abstract

Projects in the construction industry frequently demonstrates substantial deviation across the project life cycle. Construction projects, according to this study’s interview analysis in Iceland, frequently suffer from inadequate project management, lack of scope, poor labor use, clients with insufficient finances, and excessive client intervention. Additionally, wider societal factors such as COVID-2019 can negatively impact deviation and undermine project success. The purpose of this study is to identify the factors, that impact deviation in project management and the phases through which it arises in the project life cycle of the construction industry. The paper presents a case study on project management deviation across the project life cycle based on the Icelandic construction industry. The research results identified that project deviation is primarily caused by four factors: 1) clients' ambiguous requirements; a lack of planning, which results in an extended execution phase, often at great expense; 2) Icelandic cultural attitudes; 3) a lack of standardization in project manager operations; and 4) unpredictable external factors that cannot be controlled. In this study revealed project management deviation reasons in relation to project life cycle phases in the Icelandic construction sector. The elimination of deviation factors can help project managers to successfully manage project implementation and ensure successful project life cycle implementation in the construction industry.

Keywords

References

  1. Aðalsteinsson, G. D., & Guðlaugsson, Þ. (2007). Can a specific Icelandic organizational culture explain the success of Icelandic businesses in foreign expansion. In 19th Nordic Academy of Management Conference (pp. 1-30). https://notendur.hi.is/th/efni/nff07Gylfi&Thorallur.pdf
  2. Aðalsteinsson, G. D., Guðlaugsson, Þ. Ö, & Gústavsdóttir, E. R. (2010). Íslensk vinnustaðamenning. Skýr og markviss stefna en skortur á samhæfingu og samþættingu. Stjórmál & Stjórnsýsla, 2(6), 9-251. Htp://hdl.handle.net/1946/9132
  3. Alwan, Z., Jones, P., & Holgate, P. (2017). Strategic sustainable development in the UK construction industry, through the framework for strategic sustainable development, using Building Information Modelling. Journal of cleaner production, 140, 349-358.
  4. Bennett, L. (2003). The management of construction a project life cycle approach. Routledge.
  5. Chan, D. W. M., & Kumaraswamy, M. M. (1997). A comparative study of causes of time overruns in Hong Kong construction projects. International Journal of Project Management, 15(1), 55-63. https://doi.org/10.1016/S0263-7863(96)00039-7
  6. Clough, R. H., Sears, G. A., & Sears, S.K. (2000). Construction project management (4th ed.). John Wiley & Sons.
  7. Collyer, S., & Warren, C. M. (2009). Project management approaches for dynamic environments. International Journal of Project Management, 27(4), 355-364. https://doi.org/10.1016/j.ijproman.2008.04.004
  8. Corazzini, L., Galavotti, S., & Valbonesi, P. (2019). An experimental study on sequential auctions with privately known capacities. Games and Economic Behaviour, 117, 289-315. https://doi.org/10.1016/j.geb.2019.06.005

Details

Primary Language

English

Subjects

Business Administration

Journal Section

Research Article

Authors

Svanborg María Guðmundsdóttir This is me
Iceland

Ligita Zailskaitė-jakštė This is me
0000-0003-3696-6520
Lithuania

Inga Minelgaite * This is me
0000-0002-4026-3222
Iceland

Publication Date

July 15, 2022

Submission Date

June 11, 2022

Acceptance Date

July 13, 2022

Published in Issue

Year 2022 Volume: 5 Number: 3

APA
Guðmundsdóttir, S. M., Zailskaitė-jakštė, L., & Minelgaite, I. (2022). Deviation(s) in Project Life Cycle: Case of Construction Industry. Uluslararası Ekonomi Siyaset İnsan Ve Toplum Bilimleri Dergisi, 5(3), 75-85. https://izlik.org/JA43JW24NR
AMA
1.Guðmundsdóttir SM, Zailskaitė-jakštė L, Minelgaite I. Deviation(s) in Project Life Cycle: Case of Construction Industry. Uluslararası Ekonomi Siyaset İnsan ve Toplum Bilimleri Dergisi. 2022;5(3):75-85. https://izlik.org/JA43JW24NR
Chicago
Guðmundsdóttir, Svanborg María, Ligita Zailskaitė-jakštė, and Inga Minelgaite. 2022. “Deviation(s) in Project Life Cycle: Case of Construction Industry”. Uluslararası Ekonomi Siyaset İnsan Ve Toplum Bilimleri Dergisi 5 (3): 75-85. https://izlik.org/JA43JW24NR.
EndNote
Guðmundsdóttir SM, Zailskaitė-jakštė L, Minelgaite I (July 1, 2022) Deviation(s) in Project Life Cycle: Case of Construction Industry. Uluslararası Ekonomi Siyaset İnsan ve Toplum Bilimleri Dergisi 5 3 75–85.
IEEE
[1]S. M. Guðmundsdóttir, L. Zailskaitė-jakštė, and I. Minelgaite, “Deviation(s) in Project Life Cycle: Case of Construction Industry”, Uluslararası Ekonomi Siyaset İnsan ve Toplum Bilimleri Dergisi, vol. 5, no. 3, pp. 75–85, July 2022, [Online]. Available: https://izlik.org/JA43JW24NR
ISNAD
Guðmundsdóttir, Svanborg María - Zailskaitė-jakštė, Ligita - Minelgaite, Inga. “Deviation(s) in Project Life Cycle: Case of Construction Industry”. Uluslararası Ekonomi Siyaset İnsan ve Toplum Bilimleri Dergisi 5/3 (July 1, 2022): 75-85. https://izlik.org/JA43JW24NR.
JAMA
1.Guðmundsdóttir SM, Zailskaitė-jakštė L, Minelgaite I. Deviation(s) in Project Life Cycle: Case of Construction Industry. Uluslararası Ekonomi Siyaset İnsan ve Toplum Bilimleri Dergisi. 2022;5:75–85.
MLA
Guðmundsdóttir, Svanborg María, et al. “Deviation(s) in Project Life Cycle: Case of Construction Industry”. Uluslararası Ekonomi Siyaset İnsan Ve Toplum Bilimleri Dergisi, vol. 5, no. 3, July 2022, pp. 75-85, https://izlik.org/JA43JW24NR.
Vancouver
1.Svanborg María Guðmundsdóttir, Ligita Zailskaitė-jakštė, Inga Minelgaite. Deviation(s) in Project Life Cycle: Case of Construction Industry. Uluslararası Ekonomi Siyaset İnsan ve Toplum Bilimleri Dergisi [Internet]. 2022 Jul. 1;5(3):75-8. Available from: https://izlik.org/JA43JW24NR

International Journal of Economics, Politics, Humanities & Social Sciences – IJEPHSS is licensed under a Creative Commons Attribution-NonCommercial 4.0 International (CC BY NC)