Research Article

Evaluation and Scheduling of the Car Manufacturing Factory’s Employers’ Work Shifts

Volume: 3 Number: 1 April 20, 2017
EN

Evaluation and Scheduling of the Car Manufacturing Factory’s Employers’ Work Shifts

Abstract

This study is made an application related to the regulation of working hours of workers in car factory. This factory has thick to work 24 hour shifts need to work with the system as needed. In this study, which is open 24 hours a day and 7 days in a car factory, it has made application serving with 3 shifts. The attention of employees serving in this industry and are crucial to productivity. Mistakes will be made, which can lead to irreparable consequences. The working hours of workers at the factory scheduling process is usually carried out by personnel chief in the factory. In this study, in consultation with the chief engineer in charge of drafting the schedule and made relevant studies were identified by examining the constraints to be considered. Then it established a mathematical model that can be used in a general sense with integer linear programming techniques. Established model applies to data in a unit of a car factory and has been found to be optimal solutions with the help of LINGO software. Unlike other shift scheduling problems in the literature, this study aimed to run for a minimum of additional workers outside the factory. There is also a model that defined the mathematical model and skillful workers to shift some concessions to be assigned any number of workers in particular experience has been established.

Keywords

References

  1. Sigrid Knust, Elisabeth Schumacher, “Shift scheduling for tank trucks”, Omega, 513-521, 2011.
  2. Tanguy Lapegue, Odile Bellenguez-Morineau, Damien Prot, “A constraint-based approach for the shift design personnel task scheduling problem with equity”, Computers & Operations Research, 40, 2450-2465, 2013.
  3. MiekeDefraeye, Inneke Van Nieuwenhuyse, “A branch and bound algorithm for shift scheduling with stochastic non-stationary demand”, Computers & Operations Research, 65, 149-162, 2016.
  4. Javier Puente, Alberto Gomez, Isabel Fernandez, Paolo Priore, “Medical doctor rostering problem in a hospital emergency department by means of genetic algorithms”, Computers & Industrial Engineering, 56, 1232-1242, 2009.
  5. Edmund K. Burke, Jingpeng Li, Rong Qu, “A hybrid model of integer programming and variable neighbourhood search for highly-constrained nurse rostering problems”, European Journal of Operational Research, 203, 484-493, 2010.
  6. Joao Telhada, “Alternative MIP formulations for an integrated shift scheduling and task assignment problem”, Discrete Applied Mathematics, 164, 328-343, 2014.
  7. ŞeydaTopaloğlu, “A shift scheduling model for employees with different seniority levels and an application in healthcare”, European Journal of Operational Reserch, 198, 943-957, 2009.
  8. A.T. Ernst, H. Jiang, M. Krishnamoorthy, B. Owens, D. Sier, “An annotated bibliography of personnel scheduling and rostering”, Annals of Operations Research, 127, 21- 144, 2004.

Details

Primary Language

English

Subjects

Engineering

Journal Section

Research Article

Authors

Erhan Baran
HİTİT ÜNİVERSİTESİ
Türkiye

Publication Date

April 20, 2017

Submission Date

February 21, 2017

Acceptance Date

-

Published in Issue

Year 2017 Volume: 3 Number: 1

APA
Baran, E. (2017). Evaluation and Scheduling of the Car Manufacturing Factory’s Employers’ Work Shifts. International Journal of Engineering Technologies IJET, 3(1), 14-18. https://doi.org/10.19072/ijet.293126
AMA
1.Baran E. Evaluation and Scheduling of the Car Manufacturing Factory’s Employers’ Work Shifts. IJET. 2017;3(1):14-18. doi:10.19072/ijet.293126
Chicago
Baran, Erhan. 2017. “Evaluation and Scheduling of the Car Manufacturing Factory’s Employers’ Work Shifts”. International Journal of Engineering Technologies IJET 3 (1): 14-18. https://doi.org/10.19072/ijet.293126.
EndNote
Baran E (April 1, 2017) Evaluation and Scheduling of the Car Manufacturing Factory’s Employers’ Work Shifts. International Journal of Engineering Technologies IJET 3 1 14–18.
IEEE
[1]E. Baran, “Evaluation and Scheduling of the Car Manufacturing Factory’s Employers’ Work Shifts”, IJET, vol. 3, no. 1, pp. 14–18, Apr. 2017, doi: 10.19072/ijet.293126.
ISNAD
Baran, Erhan. “Evaluation and Scheduling of the Car Manufacturing Factory’s Employers’ Work Shifts”. International Journal of Engineering Technologies IJET 3/1 (April 1, 2017): 14-18. https://doi.org/10.19072/ijet.293126.
JAMA
1.Baran E. Evaluation and Scheduling of the Car Manufacturing Factory’s Employers’ Work Shifts. IJET. 2017;3:14–18.
MLA
Baran, Erhan. “Evaluation and Scheduling of the Car Manufacturing Factory’s Employers’ Work Shifts”. International Journal of Engineering Technologies IJET, vol. 3, no. 1, Apr. 2017, pp. 14-18, doi:10.19072/ijet.293126.
Vancouver
1.Erhan Baran. Evaluation and Scheduling of the Car Manufacturing Factory’s Employers’ Work Shifts. IJET. 2017 Apr. 1;3(1):14-8. doi:10.19072/ijet.293126

88x31.png Attribution-NonCommercial-NoDerivatives 4.0 International (CC BY-NC-ND 4.0)