Formation of Six Sigma Infrastructure for the Coronary Stenting Process

Volume: 3 Number: 4 December 1, 2013
  • Mehmet Tolga Taner
  • Gamze Kagan
  • Sezai Celik
  • Engin Erbas
  • Mehmet Kemal Kagan
EN

Formation of Six Sigma Infrastructure for the Coronary Stenting Process

Abstract

The purpose of this study is to show how a tertiary care center in Turkey operating mainly in cardiology initiated Six Sigma principles to reduce the number of complications occuring during coronary stent insertion process. A Six Sigma’s Define-Measure-Analyze-Improve-Control (DMAIC) model for coronary stent insertion is suggested. Data were collected for 24-months. Twenty-two Critical-to-Quality (CTQ) factors were identified for successful coronary stent insertion. The most frequent causes of complications in the process were found to be patients with previous bypass surgery or PCI, inexperience of staff members, highly damaged vessel structure, thin and/or long vessel diameter, inappropriate selection of stent type, inappropriate selection of balloon type and poor image quality.

Keywords

Details

Primary Language

English

Subjects

-

Journal Section

-

Authors

Mehmet Tolga Taner This is me

Sezai Celik This is me

Engin Erbas This is me

Mehmet Kemal Kagan This is me

Publication Date

December 1, 2013

Submission Date

December 1, 2013

Acceptance Date

-

Published in Issue

Year 2013 Volume: 3 Number: 4

APA
Taner, M. T., Kagan, G., Celik, S., Erbas, E., & Kagan, M. K. (2013). Formation of Six Sigma Infrastructure for the Coronary Stenting Process. International Review of Management and Marketing, 3(4), 232-242. https://izlik.org/JA77YD36BD
AMA
1.Taner MT, Kagan G, Celik S, Erbas E, Kagan MK. Formation of Six Sigma Infrastructure for the Coronary Stenting Process. IRMM. 2013;3(4):232-242. https://izlik.org/JA77YD36BD
Chicago
Taner, Mehmet Tolga, Gamze Kagan, Sezai Celik, Engin Erbas, and Mehmet Kemal Kagan. 2013. “Formation of Six Sigma Infrastructure for the Coronary Stenting Process”. International Review of Management and Marketing 3 (4): 232-42. https://izlik.org/JA77YD36BD.
EndNote
Taner MT, Kagan G, Celik S, Erbas E, Kagan MK (December 1, 2013) Formation of Six Sigma Infrastructure for the Coronary Stenting Process. International Review of Management and Marketing 3 4 232–242.
IEEE
[1]M. T. Taner, G. Kagan, S. Celik, E. Erbas, and M. K. Kagan, “Formation of Six Sigma Infrastructure for the Coronary Stenting Process”, IRMM, vol. 3, no. 4, pp. 232–242, Dec. 2013, [Online]. Available: https://izlik.org/JA77YD36BD
ISNAD
Taner, Mehmet Tolga - Kagan, Gamze - Celik, Sezai - Erbas, Engin - Kagan, Mehmet Kemal. “Formation of Six Sigma Infrastructure for the Coronary Stenting Process”. International Review of Management and Marketing 3/4 (December 1, 2013): 232-242. https://izlik.org/JA77YD36BD.
JAMA
1.Taner MT, Kagan G, Celik S, Erbas E, Kagan MK. Formation of Six Sigma Infrastructure for the Coronary Stenting Process. IRMM. 2013;3:232–242.
MLA
Taner, Mehmet Tolga, et al. “Formation of Six Sigma Infrastructure for the Coronary Stenting Process”. International Review of Management and Marketing, vol. 3, no. 4, Dec. 2013, pp. 232-4, https://izlik.org/JA77YD36BD.
Vancouver
1.Mehmet Tolga Taner, Gamze Kagan, Sezai Celik, Engin Erbas, Mehmet Kemal Kagan. Formation of Six Sigma Infrastructure for the Coronary Stenting Process. IRMM [Internet]. 2013 Dec. 1;3(4):232-4. Available from: https://izlik.org/JA77YD36BD