Industrialised Building System (IBS) Plan of Work

Abstract

Industrialised Building Systems (IBS) is a term used to describe construction method that produced building components manufactured in a factory, transported and assembled into a structure using appropriate machinery and equipment with minimal workers on site. The project life cycle is a project independent series of activities that commences from the starting point until the moment it was successfully delivered. Generally in a construction project, the phases or stages are initiating, planning, executing, monitoring and controlling as well as the closing stage. This paper is part of an on-going research on the Industrialised Building System (IBS) project management life cycle through the IBS approach in the Malaysian construction industry. The data and information presented is the review of the available relevant literature on this research topic. This paper incorporates an analysis of the definitions and IBS/Off-Site plan of work or similar to it outside Malaysia. The identification of the plan/cycle from the analysis is critically essential to becoming the fundamental foundation for further research into the subject matter. It is hoped that at the end of the core research, industry players will be provided with a guideline that adopts a concept of “cradle to grave” in managing IBS throughout its plan of work/ life cycle.

Keywords

Details

Primary Language

English

Subjects

-

Journal Section

-

Authors

Mohd Reeza Yusof This is me

Muhamad Faiz Musa This is me

Noor Sahidah Samsudin This is me

Mohammad Fadhil Mohammad This is me

Mohd Nurfaisal Baharuddin This is me

Publication Date

August 1, 2016

Submission Date

August 1, 2016

Acceptance Date

-

Published in Issue

Year 2016 Volume: 6 Number: 7

APA
Yusof, M. R., Musa, M. F., Samsudin, N. S., Mohammad, M. F., & Baharuddin, M. N. (2016). Industrialised Building System (IBS) Plan of Work. International Review of Management and Marketing, 6(7), 299-305. https://izlik.org/JA72MH42UT
AMA
1.Yusof MR, Musa MF, Samsudin NS, Mohammad MF, Baharuddin MN. Industrialised Building System (IBS) Plan of Work. IRMM. 2016;6(7):299-305. https://izlik.org/JA72MH42UT
Chicago
Yusof, Mohd Reeza, Muhamad Faiz Musa, Noor Sahidah Samsudin, Mohammad Fadhil Mohammad, and Mohd Nurfaisal Baharuddin. 2016. “Industrialised Building System (IBS) Plan of Work”. International Review of Management and Marketing 6 (7): 299-305. https://izlik.org/JA72MH42UT.
EndNote
Yusof MR, Musa MF, Samsudin NS, Mohammad MF, Baharuddin MN (August 1, 2016) Industrialised Building System (IBS) Plan of Work. International Review of Management and Marketing 6 7 299–305.
IEEE
[1]M. R. Yusof, M. F. Musa, N. S. Samsudin, M. F. Mohammad, and M. N. Baharuddin, “Industrialised Building System (IBS) Plan of Work”, IRMM, vol. 6, no. 7, pp. 299–305, Aug. 2016, [Online]. Available: https://izlik.org/JA72MH42UT
ISNAD
Yusof, Mohd Reeza - Musa, Muhamad Faiz - Samsudin, Noor Sahidah - Mohammad, Mohammad Fadhil - Baharuddin, Mohd Nurfaisal. “Industrialised Building System (IBS) Plan of Work”. International Review of Management and Marketing 6/7 (August 1, 2016): 299-305. https://izlik.org/JA72MH42UT.
JAMA
1.Yusof MR, Musa MF, Samsudin NS, Mohammad MF, Baharuddin MN. Industrialised Building System (IBS) Plan of Work. IRMM. 2016;6:299–305.
MLA
Yusof, Mohd Reeza, et al. “Industrialised Building System (IBS) Plan of Work”. International Review of Management and Marketing, vol. 6, no. 7, Aug. 2016, pp. 299-05, https://izlik.org/JA72MH42UT.
Vancouver
1.Mohd Reeza Yusof, Muhamad Faiz Musa, Noor Sahidah Samsudin, Mohammad Fadhil Mohammad, Mohd Nurfaisal Baharuddin. Industrialised Building System (IBS) Plan of Work. IRMM [Internet]. 2016 Aug. 1;6(7):299-305. Available from: https://izlik.org/JA72MH42UT