Public Private Partnership in Malaysia: The Differences in Perceptions on the Criticality of Risk Factors and Allocation of Risks between the Private and Public Sectors

Year 2017, Volume: 7 Issue: 2, 138 - 150, 01.06.2017
https://izlik.org/JA38DX38YS

Abstract

Public Private Partnership (PPP) was introduced in Malaysia in the 1980s. Malaysian government used this tool for the provision of infrastructure and public services efficiently. However, a few PPP arrangements are under-achieved due to problems in risk identification and management. Therefore, this paper aims to rank risk factors based on criticality. Apart from ranking of risks, this paper provides preferred allocation of critical risk factors. In addition, this study aims to assess the difference of perceptions about the criticality of the risks between contracting parties. First, a few interviews were conducted to screen the risk factors provided in literature and then a set of questionnaires was served upon both private and public sector for the ranking and allocation of risks. To rank risks, a matrix was provided to the respondents and the percentage method was used to allocate the risks. The results of study suggest that 31 out of 44 risk factors are critical and out them 5 critical risk factors should preferably be allocated to private sector. However, a significant difference in perceptions of private and public sector about critically of risks has been identified. The results conclude that the construction and operation stages are critical and for the success of PPP projects both public and private sectors have to improve risk communication to avoid the difference in perception about criticalities of risks.

There are 0 citations in total.

Details

Other ID JA79RF48EC
Authors

Usman Ahmad This is me

Yusnidah Ibrahim This is me

Mohd Sobri Minai This is me

Publication Date June 1, 2017
IZ https://izlik.org/JA38DX38YS
Published in Issue Year 2017 Volume: 7 Issue: 2

Cite

APA Ahmad, U., Ibrahim, Y., & Minai, M. S. (2017). Public Private Partnership in Malaysia: The Differences in Perceptions on the Criticality of Risk Factors and Allocation of Risks between the Private and Public Sectors. International Review of Management and Marketing, 7(2), 138-150. https://izlik.org/JA38DX38YS
AMA 1.Ahmad U, Ibrahim Y, Minai MS. Public Private Partnership in Malaysia: The Differences in Perceptions on the Criticality of Risk Factors and Allocation of Risks between the Private and Public Sectors. IRMM. 2017;7(2):138-150. https://izlik.org/JA38DX38YS
Chicago Ahmad, Usman, Yusnidah Ibrahim, and Mohd Sobri Minai. 2017. “Public Private Partnership in Malaysia: The Differences in Perceptions on the Criticality of Risk Factors and Allocation of Risks Between the Private and Public Sectors”. International Review of Management and Marketing 7 (2): 138-50. https://izlik.org/JA38DX38YS.
EndNote Ahmad U, Ibrahim Y, Minai MS (June 1, 2017) Public Private Partnership in Malaysia: The Differences in Perceptions on the Criticality of Risk Factors and Allocation of Risks between the Private and Public Sectors. International Review of Management and Marketing 7 2 138–150.
IEEE [1]U. Ahmad, Y. Ibrahim, and M. S. Minai, “Public Private Partnership in Malaysia: The Differences in Perceptions on the Criticality of Risk Factors and Allocation of Risks between the Private and Public Sectors”, IRMM, vol. 7, no. 2, pp. 138–150, June 2017, [Online]. Available: https://izlik.org/JA38DX38YS
ISNAD Ahmad, Usman - Ibrahim, Yusnidah - Minai, Mohd Sobri. “Public Private Partnership in Malaysia: The Differences in Perceptions on the Criticality of Risk Factors and Allocation of Risks Between the Private and Public Sectors”. International Review of Management and Marketing 7/2 (June 1, 2017): 138-150. https://izlik.org/JA38DX38YS.
JAMA 1.Ahmad U, Ibrahim Y, Minai MS. Public Private Partnership in Malaysia: The Differences in Perceptions on the Criticality of Risk Factors and Allocation of Risks between the Private and Public Sectors. IRMM. 2017;7:138–150.
MLA Ahmad, Usman, et al. “Public Private Partnership in Malaysia: The Differences in Perceptions on the Criticality of Risk Factors and Allocation of Risks Between the Private and Public Sectors”. International Review of Management and Marketing, vol. 7, no. 2, June 2017, pp. 138-50, https://izlik.org/JA38DX38YS.
Vancouver 1.Usman Ahmad, Yusnidah Ibrahim, Mohd Sobri Minai. Public Private Partnership in Malaysia: The Differences in Perceptions on the Criticality of Risk Factors and Allocation of Risks between the Private and Public Sectors. IRMM [Internet]. 2017 Jun. 1;7(2):138-50. Available from: https://izlik.org/JA38DX38YS